[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-510145-105":59,"doc-detail-510145-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","banladesh-delta-plan-2100-part-3-appendix-i-project-cost-and-benefit-analysis","Banladesh Delta Plan 2100 - Part 3 - Appendix I - Project Cost and Benefit Analysis","","Report section “Appendix I” evaluates Bangladesh Delta Plan 2100 (BDP2100) priority projects for eventual inclusion in a BDP2100 Investment Plan. It explains why adaptive delta management is required and describes how the World Bank Group and the General Economics Division coordinate consultant inputs. The assessment process screens projects in phases using readiness, feasibility, development history, policy consistency, climate adaptation linkage, and private-sector suitability, then determines which projects have enough detail for full assessment and which require more information.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/banladesh-delta-plan-2100-part-3-appendix-i-project-cost-and-benefit-analysis/510145/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/banladesh-delta-plan-2100-part-3-appendix-i-project-cost-and-benefit-analysis/510145.png","ImageObject",300,407,{"name":92,"@type":93},"Patrick","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-29","2026-10-05",true,{"@type":102,"interactionType":103,"userInteractionCount":34},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What is the Bangladesh Delta Plan 2100 and what does it aim to connect?","Question",{"text":112,"@type":113},"Bangladesh Delta Plan 2100 provides a long-term vision and links Bangladesh’s medium-term development goals with long-term sustainable management of water, ecology, environment, and land resources.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"Who supports the preparation of the BDP2100 Investment Plan?",{"text":117,"@type":113},"The General Economics Division coordinates consultant inputs, and the World Bank Group assists GED with formulating the BDP2100 Investment Plan.",{"name":119,"@type":110,"acceptedAnswer":120},"How are projects assessed during the initial assessment phase?",{"text":121,"@type":113},"The team compiles background information, consults relevant stakeholders, and reviews readiness indicators such as feasibility, environmental and social impact assessments, and cost-benefit studies, then checks consistency with government objectives and links to climate change adaptation and private-sector participation suitability.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},510145,1791382487,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":34,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145,"preview_page_count":146,"preview_urls":147},549758146520,"https://ap-avatar.wpscdn.com/avatar/80002397d8c0411e94?_k=1775819394049821470","Part 3: Appendix I  \nProject Costs and Benefits Analysis  \nBanladesh Delta Plan 2100  297  \n298  \nGeneral Economics Division  \nAppendix I : Project Cost and Benefit Analysis161  \nI.1 Introduction  \nThe Government of Bangladesh has initiated the Bangladesh Delta Plan 2100 (Delta Plan or BDP2100) to define a long-term vision for Bangladesh’s development. The Delta Plan links Bangladesh’s medium-term goal to become an upper middle income country with its long-term goals to manage water, ecology, environment, and land resources sustainably. Given its deep experience with managing delta issues, the Government of the Netherlands is providing technical assistance to the Government of Bangladesh for the formulation of the Delta Plan. The General Economics Division (GED) of the Planning Commission is coordinating consultant inputs from BanDuDeltAS (Team A) and Policy Research Institute (Team B) to develop the Delta Plan. Both teams have now submitted Zero Draft Delta Plans, which are being reviewed by GED.  \nTo support implementation of the Delta Plan, the World Bank Group (WBG)162 is assisting GED with the formulation of a BDP2100 Investment Plan. The Investment Plan will include relevant projects for implementation through 2030. Because Bangladesh is one of the most economically dynamic and climate change vulnerable countries in the world, any proposed investments must be planned in a fully adaptive way to ensure successful implementation and sustainability. The Investment Plan does this by applying the principles of adaptive delta management (ADM) to develop a credible, implementable, and sustainable Investment Plan to support the Delta Plan.  \nThe purpose of this report is to assess BDP2100 priority projects for eventual inclusion in the Investment Plan. Team A has prepared Project Concept Notes (PCNs) for over 100 projects for consideration for the Investment Plan. These PCNs have varying levels of detail, from detailed project concepts to initial project ideas. GED has provided 34 of these PCNs totheWBG Investment Plan team to consider for the Investment Plan. Of these 34 projects (detailed in Section I.7), the Team was able to obtain enough detailed information for 26 projects for a full project assessment to determine suitability for inclusion in the Investment Plan. The other eight projects do not yet have sufficient information to be properly assessed. GED rejected a further two projects for inclusion because they are already in advanced stages of consideration for implementation, and the Investment Plan team identified another three projects that had already secured funding. GED also combined two pairs of related projects. This resulted in a total of 19 projects to be considered for detailed assessment. The results of this project assessment will be used to develop the Investment Plan.  \nThe report is structured as follows:  \n• Section I.2: describes the assessment process and criteria. The Investment Plan team considered various aspects of each project, including costs and benefits and feasibility study results.  \n• Section I.3: summarizes the project cost benefit analyses and describes the methodological issues.  \n161 This Project Costs and Benefits Analysis report was developed as one of the early stages of the Investment Plan formulation process. It only covers projects for which there was sufficient information available.  \n162 In collaboration with the 2030 Water Resources Group  \nBanladesh Delta Plan 2100  299  \n• Section I.4: presents the Investment Plan team’s overall observations of the group of projects. The full list of projects received (Batches 1-3) is given in I.7 . We have since received a fourth batch of initial project ideas on 24 September 2016 for consideration in the Investment Plan. These additional preliminary project ideas are given in I.8. The Batch 4 concepts will be analyzed as part of the Investment Plan.  \n• Section I.4: suggests how projects could be prioritized in the Investment Plan and demons","cbCaigJ5f9Ppxir3","https://ap.wps.com/l/cbCaigJ5f9Ppxir3","pdf",8262267,259,"English","# Project Costs and Benefits Analysis\n## I.1 Introduction\n## I.2 Project Assessment Process\n### I.2.1 Initial Assessment","[{\"question\":\"What is the Bangladesh Delta Plan 2100 and what does it aim to connect?\",\"answer\":\"Bangladesh Delta Plan 2100 provides a long-term vision and links Bangladesh’s medium-term development goals with long-term sustainable management of water, ecology, environment, and land resources.\"},{\"question\":\"Who supports the preparation of the BDP2100 Investment Plan?\",\"answer\":\"The General Economics Division coordinates consultant inputs, and the World Bank Group assists GED with formulating the BDP2100 Investment Plan.\"},{\"question\":\"How are projects assessed during the initial assessment phase?\",\"answer\":\"The team compiles background information, consults relevant stakeholders, and reviews readiness indicators such as feasibility, environmental and social impact assessments, and cost-benefit studies, then checks consistency with government objectives and links to climate change adaptation and private-sector participation suitability.\"}]","Banladesh Delta Plan 2100 - Part 3 - Appendix I - Project Cost and Benefit Analysis | PDF",1791239400,653,26,[148,152,156,160,164,168,172,176,180,184,188,193,198,203,208,213,218,223,228,232,236,241,246,251,256,261],{"page_no":8,"url":149,"width":150,"height":151},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/22b0c4a696d1d88c216ed750144dc422.webp",983,1272,{"page_no":14,"url":153,"width":154,"height":155},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/7104a4eec83e02f9ef13942ff3a851af.webp",982,1270,{"page_no":81,"url":157,"width":158,"height":159},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/1318315adde5f46f78d7d87a420c4578.webp",981,1269,{"page_no":19,"url":161,"width":162,"height":163},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/e9f307e6c95119a32286e036c86ece8d.webp",980,1268,{"page_no":24,"url":165,"width":166,"height":167},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/1d3d27145508d754981122eb9ec1c612.webp",979,1267,{"page_no":29,"url":169,"width":170,"height":171},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/9247952bb0b351937edffb3307e4fefb.webp",978,1265,{"page_no":34,"url":173,"width":174,"height":175},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/245bf7591cc0a9cec44c48e612c41683.webp",977,1264,{"page_no":39,"url":177,"width":178,"height":179},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/724cbec5388c90d4923a7887232c0a07.webp",976,1263,{"page_no":44,"url":181,"width":182,"height":183},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/4c3ccf15d4466a6b379c033e6ef2ec28.webp",975,1261,{"page_no":52,"url":185,"width":186,"height":187},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/46b78c792ae4a63a4b2d6ddaf3b96ae2.webp",974,1260,{"page_no":189,"url":190,"width":191,"height":192},11,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/aab19771d8aed6e378277cbc5d79edea.webp",973,1259,{"page_no":194,"url":195,"width":196,"height":197},12,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/8557766f6c93d5bbaf47a0d97422ba0d.webp",972,1257,{"page_no":199,"url":200,"width":201,"height":202},13,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/ae5a49600aa659681d77fbb9b25d9485.webp",971,1256,{"page_no":204,"url":205,"width":206,"height":207},14,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/3b81e92c5d65afc57b09177a5e7c5e71.webp",970,1255,{"page_no":209,"url":210,"width":211,"height":212},15,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/cd119bf88b53dc79b639b74e8f453355.webp",969,1254,{"page_no":214,"url":215,"width":216,"height":217},16,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/6721c6be329f523868c0a548265ce298.webp",968,1252,{"page_no":219,"url":220,"width":221,"height":222},17,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/f308540077b2822c4427fcbe8d1f3543.webp",967,1251,{"page_no":224,"url":225,"width":226,"height":227},18,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/394f9723f1facef5272824d9831d4f58.webp",966,1250,{"page_no":56,"url":229,"width":230,"height":231},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/a1b18c5bb9beffb4c09188a41eea5ceb.webp",965,1248,{"page_no":46,"url":233,"width":234,"height":235},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/7032280e03155bed0dba8ebe8f52ec73.webp",964,1247,{"page_no":237,"url":238,"width":239,"height":240},21,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/a91cc57392923ffea2eebd54b27c9a79.webp",963,1246,{"page_no":242,"url":243,"width":244,"height":245},22,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/75bed0ec4cfa71740455b396c4be37ec.webp",962,1245,{"page_no":247,"url":248,"width":249,"height":250},23,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/2770caed9b0e34e0fd61eac66536b0ed.webp",961,1243,{"page_no":252,"url":253,"width":254,"height":255},24,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/a71d58366aeb87486f2a73a4364ca62b.webp",960,1242,{"page_no":257,"url":258,"width":259,"height":260},25,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/dca5046bf54c9d033d1441c8854d2718.webp",959,1241,{"page_no":146,"url":262,"width":263,"height":264},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/68fb600e158cc103c27358c148cf7598.webp",958,1239]