[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-648338-105":59,"doc-detail-648338-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","av-standards-conference-room-programming-and-planning-requirements","AV Standards - Conference Room - Programming and Planning Requirements","","AV Standards appendix for an FIU course capture classroom conference room detailing programming and planning requirements, coordination priorities, and high-cost failure items. Covers acoustics targets for background noise, RT60 limits, NRC ceiling tile specification, and noise control for HVAC and mechanical systems. Provides guidance on raceway separation, lighting coordination for video conferencing, illumination levels, interior finishes, and camera/display placement including screen size and required AV infrastructure and device placements.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/av-standards-conference-room-programming-and-planning-requirements/648338/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/av-standards-conference-room-programming-and-planning-requirements/648338.png","ImageObject",300,407,{"name":92,"@type":93},"404brain","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-26","2026-10-23",true,{"@type":102,"interactionType":103,"userInteractionCount":8},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What coordination areas are identified for the conference table and AV devices?","Question",{"text":112,"@type":113},"The document lists coordination for conference table leg and floorbox location, display location (including PTZ camera mounting below the display), credenza location, and coordinated ceiling AV devices such as recessed ceiling speakers, ceiling microphones, and an occupancy sensor.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What acoustics targets are specified for meeting spaces?",{"text":117,"@type":113},"Meeting spaces should have background noise levels below 35 dBA (measured as 1 hr steady-state), an RT60 not exceeding 0.6s, and ceiling tiles with an NRC of 0.75. For video conferencing rooms, acoustical diffusion is recommended by reducing flat continuous surfaces.",{"name":119,"@type":110,"acceptedAnswer":120},"What mechanical noise and baseline recommendations are given to reduce failure risk?",{"text":121,"@type":113},"Mechanical noise should be isolated from conference areas by distancing mechanical and electrical equipment rooms from learning spaces, keeping restrooms away from meeting spaces, not running plumbing pipes above conference spaces, and utilizing cast iron waste water pipes where possible. Low-noise light ballasts are also recommended.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},648338,1793028964,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":8,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145},1099529839291,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","FLORIDA INTERNATIONAL UNIVERSITY  \nAPPENDIX “C”  \nAV Standards Conference Room  \nAV Standards – Conference Room  \nContents  \nProgramming and Planning Requirements ................................................................................................... 2  \nPrimary Areas of Coordination ................................................................................................................. 2  \nHigh Cost of Failure Items ......................................................................................................................... 2  \nAcoustics ................................................................................................................................................... 2  \nSTC Ratings ............................................................................................................................................ 3  \nHVAC Noise ........................................................................................................................................... 3  \nRaceway Separation.................................................................................................................................. 3  \nLighting Coordination for Video Conferencing ......................................................................................... 4  \nIllumination Levels .................................................................................................................................... 5  \nInterior Finishes ........................................................................................................................................ 5  \nCamera and Display Placement Considerations ....................................................................................... 5  \nScreen Size ................................................................................................................................................ 6  \nDefinition of AV Infrastructure Requirements.............................................................................................. 7  \nConference table floorbox ........................................................................................................................ 7  \n.................................................................................................................................................................. 8  \nCredenza Requirements............................................................................................................................ 8  \nRecessed Ceiling Speakers (2 typical) ....................................................................................................... 9  \nCeiling Mounted Microphones (1 typical) ................................................................................................ 9  \nWall Mounted PTZ (pan/tilt/zoom) Camera ........................................................................................... 10  \nRoom Scheduling Touchpanel................................................................................................................. 10  \nRecessed Ceiling Mounted Occupancy Sensor ....................................................................................... 11  \nDivision of Scope / Responsibility Matrix ................................................................................................... 12  \nAV System Functional Narrative ................................................................................................................. 13  \nOverview ................................................................................................................................................. 13  \nSource Devices ........................................................................................................................................ 13  \nSwitcher / Control Processor ...............................................................................................","cbCaisCrdFZpUNWH","https://ap.wps.com/l/cbCaisCrdFZpUNWH","pdf",11775415,15,"English","# Programming and Planning Requirements\n## Primary Areas of Coordination\n## High Cost of Failure Items\n## Acoustics\n## STC Ratings\n## HVAC Noise\n## Raceway Separation\n## Lighting Coordination for Video Conferencing\n## Illumination Levels\n## Interior Finishes\n## Camera and Display Placement Considerations\n## Screen Size\n## Definition of AV Infrastructure Requirements\n## Conference table floorbox\n## Credenza Requirements\n## Recessed Ceiling Speakers (2 typical)\n## Ceiling Mounted Microphones (1 typical)\n## Wall Mounted PTZ (pan/tilt/zoom) Camera\n## Room Scheduling Touchpanel\n## Recessed Ceiling Mounted Occupancy Sensor\n## Division of Scope / Responsibility Matrix\n## AV System Functional Narrative\n### Overview\n### Source Devices\n### Switcher / Control Processor","[{\"question\":\"What coordination areas are identified for the conference table and AV devices?\",\"answer\":\"The document lists coordination for conference table leg and floorbox location, display location (including PTZ camera mounting below the display), credenza location, and coordinated ceiling AV devices such as recessed ceiling speakers, ceiling microphones, and an occupancy sensor.\"},{\"question\":\"What acoustics targets are specified for meeting spaces?\",\"answer\":\"Meeting spaces should have background noise levels below 35 dBA (measured as 1 hr steady-state), an RT60 not exceeding 0.6s, and ceiling tiles with an NRC of 0.75. For video conferencing rooms, acoustical diffusion is recommended by reducing flat continuous surfaces.\"},{\"question\":\"What mechanical noise and baseline recommendations are given to reduce failure risk?\",\"answer\":\"Mechanical noise should be isolated from conference areas by distancing mechanical and electrical equipment rooms from learning spaces, keeping restrooms away from meeting spaces, not running plumbing pipes above conference spaces, and utilizing cast iron waste water pipes where possible. Low-noise light ballasts are also recommended.\"}]","AV Standards - Conference Room - Programming and Planning Requirements | PDF",1792793158,38]