[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-440241-105":59,"doc-detail-440241-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","authorization-to-discharge-stormwater-associated-with-construction-activity-under-npdessds-program-mnr100001","AUTHORIZATION TO DISCHARGE - STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY - UNDER NPDES/SDS PROGRAM - MNR100001","","Authorization authorizes the listed permittees to discharge stormwater associated with construction activity to waters in Minnesota under the National Pollutant Discharge Elimination System (NPDES) and Minnesota State Disposal System (SDS) program. The permit MNR100001 covers construction stormwater under the Construction Stormwater General Permit, effective August 1, 2023 through July 31, 2028. It aims to reduce pollutant levels in point source discharges and protect water quality in accordance with the U.S. Clean Water Act and Minnesota requirements, supported by detailed SWPPP, BMP, and inspection obligations.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":35,"@type":76,"position":81},"https://docshare.wps.com/document/healthcare/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/authorization-to-discharge-stormwater-associated-with-construction-activity-under-npdessds-program-mnr100001/440241/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/authorization-to-discharge-stormwater-associated-with-construction-activity-under-npdessds-program-mnr100001/440241.png","ImageObject",300,407,{"name":92,"@type":93},"Miles","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-31","2026-09-29",true,{"@type":102,"interactionType":103,"userInteractionCount":39},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What does this authorization permit cover?","Question",{"text":112,"@type":113},"It authorizes permittees to discharge stormwater associated with construction activity to waters of Minnesota under the NPDES/SDS general permit requirements.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What are the effective and expiration dates for MNR100001?",{"text":117,"@type":113},"The permit is effective August 1, 2023 and expires at midnight on July 31, 2028.",{"name":119,"@type":110,"acceptedAnswer":120},"What stormwater planning and control requirements must be implemented?",{"text":121,"@type":113},"The permit requires a Stormwater Pollution Prevention Plan (SWPPP), BMP selection for stormwater management, and related practices such as erosion and sediment controls, along with inspection, maintenance, and training requirements.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},440241,1791307252,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":34,"category_name":35,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":39,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":46,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":143,"read_time":31,"preview_page_count":4},13056703019404,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","AUTHORIZATION TO DISCHARGE  \nSTORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY  \nUNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)/ STATE DISPOSAL SYSTEM (SDS) PROGRAM  \nMNR100001  \nPermittee: Multiple  \nProject Name: Construction Stormwater General Permit  \nIssuance date: August 1, 2023  \nExpiration date: July 31, 2028  \nThe state of Minnesota, on behalf of its citizens through the Minnesota Pollution Control Agency (MPCA), authorizes the Permittee(s) named above seeking coverage under this general permit to discharge stormwater associated with construction activity to waters of the state of Minnesota in accordance with the requirements of this permit.  \nThe goal of this permit is to reduce pollutant levels in point source discharges and protect water quality in accordance with the U.S. Clean Water Act, Minnesota statutes and rules, and federal laws and regulations.  \nThis permit is effective on the issuance date identified above. This permit expires at midnight on the expiration date identified above.  \nSignature: Ryan Anderson  \nThis document has been electronically signed. for the Minnesota Pollution Control Agency  \nRyan Anderson  \nManager  \nStormwater Section  \nMunicipal Division  \nPermit application: Questions on this permit?  \nSubmit via MPCA e-Services at Contact e-Services at  \n[https://rsp.pca.state.mn.us/](https://rsp.pca.state.mn.us/ 651-757-2728 or 844-828-0942)[ 651-757-2728 or 844-828-0942](https://rsp.pca.state.mn.us/ 651-757-2728 or 844-828-0942)  \n[wq-strm2-81a](wq-strm2-81a)  \nTable of Contents  \nPage  \n1.1 Permit Coverage .......................................................................................................................................................3  \n2.1 Prohibitions and Limitations of Coverage .................................................................................................................3  \n3.1 Application and Coverage Effective Date .................................................................................................................4  \n4.1 Termination of Coverage ..........................................................................................................................................4  \n5.1 Stormwater Pollution Prevention Plan (SWPPP) Content ........................................................................................5  \n6.1 SWPPP Amendments ................................................................................................................................................6  \n7.1 BMP Selection and Stormwater Management .........................................................................................................6  \n8.1 Erosion Prevention Practices ....................................................................................................................................7  \n9.1 Sediment Control Practices.......................................................................................................................................7  \n10.1 Dewatering and Basin Draining.................................................................................................................................8  \n11.1 Inspections and Maintenance...................................................................................................................................9  \n12.1 Pollution Prevention Management Measures ........................................................................................................10  \n13.1 Permit Termination Conditions...............................................................................................................................10  \n14.1 Temporary Sediment Basins ...................................................................................................................................11  \n15.1 Permanent Stormwater Treatment System...............................................................................................","cbCaipJ7owK78qm4","https://ap.wps.com/l/cbCaipJ7owK78qm4","pdf",379569,"English","# Permit Coverage\n# Prohibitions and Limitations of Coverage\n# Application and Coverage Effective Date\n# Termination of Coverage\n# Stormwater Pollution Prevention Plan (SWPPP) Content\n# SWPPP Amendments\n# BMP Selection and Stormwater Management\n# Erosion Prevention Practices\n# Sediment Control Practices\n# Dewatering and Basin Draining\n# Inspections and Maintenance\n# Pollution Prevention Management Measures\n# Permit Termination Conditions\n# Temporary Sediment Basins\n# Permanent Stormwater Treatment System\n# Infiltration Systems\n# Filtration Systems\n# Wet Sedimentation Basin\n# Regional Wet Sedimentation Basins\n# SWPPP Availability\n# Training Requirements\n# Requirements for Discharges to Wetlands\n# Additional Requirements for Discharges to Special and Impaired Waters\n# General Provisions\n# Definitions","[{\"question\":\"What does this authorization permit cover?\",\"answer\":\"It authorizes permittees to discharge stormwater associated with construction activity to waters of Minnesota under the NPDES/SDS general permit requirements.\"},{\"question\":\"What are the effective and expiration dates for MNR100001?\",\"answer\":\"The permit is effective August 1, 2023 and expires at midnight on July 31, 2028.\"},{\"question\":\"What stormwater planning and control requirements must be implemented?\",\"answer\":\"The permit requires a Stormwater Pollution Prevention Plan (SWPPP), BMP selection for stormwater management, and related practices such as erosion and sediment controls, along with inspection, maintenance, and training requirements.\"}]","AUTHORIZATION TO DISCHARGE - STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY - UNDER NPDES/SDS PROGRAM - MNR100001 | PDF",1790691590]