[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-385976-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-385976-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","asa-messer-west-broadway-prek-8-construction-plan-faqs","Asa Messer-West Broadway PreK-8 Construction Plan FAQs","","FAQs outlining the construction plan for Asa Messer Elementary School as part of a district strategic buildings initiative to create new or like-new schools by 2030. The document explains the investment rationale, project funding approach, and how the school will be rebuilt into a shared Pre-K through Grade 8 campus combining Asa Messer and West Broadway Middle School. It also covers transition logistics during construction, including the two-year swing space timeline, support for specialized student populations, family tours of the Lauro building, and related operational plans.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/asa-messer-west-broadway-prek-8-construction-plan-faqs/385976/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/asa-messer-west-broadway-prek-8-construction-plan-faqs/385976.png","ImageObject",300,407,{"name":42,"@type":43},"BigDaveOnline","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-11-21","2026-09-24",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",9,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What is the plan for Asa Messer Elementary School?","Question",{"text":63,"@type":64},"The City and District are investing $62.5 million to rebuild Asa Messer Elementary School and bring together Asa Messer and West Broadway Middle School into one shared campus. The new school will be built on the current Asa Messer Pre-K to Grade 4 site as a Pre-K through Grade 8 school.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"Where will students go during construction, and what is the timeline?",{"text":68,"@type":64},"Asa Messer students will temporarily relocate to swing space for two years, from Fall 2025 through Spring 2027. The identified swing space is the former Lauro Elementary School at 99 Kenyon Street, Providence, RI 02903.",{"name":70,"@type":61,"acceptedAnswer":71},"How will the transition support pre-kindergarten and special education students?",{"text":72,"@type":64},"As work improves Lauro as swing space, accessibility upgrades such as an exterior ramp will be included. In addition, the plan likely involves temporarily relocating five pre-kindergarten and special education classrooms to the newly renovated Narducci Learning Center during construction, with updates expected in the coming weeks.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},385976,1792168134,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,106,111,115,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":102,"doc_module":4,"doc_module_name":25,"category_name":103,"show_sort_weight":104,"slug":105},6,"Technology",50,"technology",{"id":107,"doc_module":4,"doc_module_name":25,"category_name":108,"show_sort_weight":109,"slug":110},7,"Healthcare",40,"healthcare",{"id":112,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":113,"slug":114},8,30,"research-report",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":97,"slug":129},19,"General","general",{"code":4,"msg":82,"data":131},{"doc_id":79,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":112,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":33,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":143,"read_time":123,"preview_page_count":33,"preview_urls":144},962090896214,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","Asa Messer-West Broadway PreK-8 Construction Plan FAQs  \nOverview  \n1. What is the plan for Asa Messer Elementary School?  \n2. How was Asa Messer identified for this investment? How is it funded?  \nThe Transition Plan during Construction  \n1. Where will Asa Messer students go during construction?  \n2. What is being done to support specialized student populations (e.g., pre-kindergarten, special education) during this transition?  \n3. Will families be able to see the Lauro building prior to students moving in?  \n4. What work is planned for the Lauro building to ensure it is ready to welcome Messer students in Fall 2025? What is the current condition of the former Lauro Elementary building?  \n5. Is Lauro the closest facility that there is for students who live around Messer? Is there another option other than Lauro?  \n6. What is the status of the request for proposal ( RFP) with the City of Providence for the Lauro building?  \n7. How can families and teachers weigh in on priorities for Lauro renovations? Will families be able to see the building prior to students moving in?  \n8. Will students receive transportation while the school is in swing space?  \n9. What is the plan for food services at Messer?  \nThe future Asa Messer PreK-8 School  \n1. Why start construction now?  \n2. What are the benefits of a PreK-8 school model?  \n3. Will Pre-K-8 schools have the same start and end times?  \n4. Will class sizes increase in the new PreK-8 model? How many students will be at the new Messer / West Broadway PreK-8?  \n5. Will parents and staff be able to provide input into the facility construction plans?  \n6. How are you going to incorporate safety measures with children that are much older than the younger children? How are you considering outdoor play areas?  \n7. If we knew Asa Messer was going to be renovated from 2023, why did you make renovations such as the new library, roof, and boiler system?  \nOverview  \nQ1. What is the plan for Asa Messer Elementary School?  \nA. As part of the District’s strategic buildings plan to have new or like-new buildings for all students by 2030, the City and District are investing $62 .5 Million in a rebuild of Asa Messer Elementary School to bring together both Asa Messer and West Broadway Middle School into one shared campus as a Pre-K through Grade 8 school. The school will be constructed at the site of the current Asa Messer Pre-K to Grade 4 Elementary School.  \n[See construction plans and progress at ](See construction plans and progress at www.rebuildpvdschools.org)[www.rebuildpvdschools.org](See construction plans and progress at www.rebuildpvdschools.org)  \nAsa Messer-West Broadway PreK-8 Construction Plan FAQs  \n\n| Q3. How was Asa Messer identified for this investment? How is it funded?\u003Cbr>A. The District is in the process of a district-wide capital plan with a goal of having enough seats in new or like new schools by 2030. As part of that plan and in response to community listening sessions and the District’s Turnaround Action Plan, key goals of the capital plan are to expand access to high quality pre-kindergarten and to reimagine the middle school experience by expanding the number of schools with Pre-K through grade 8 options. Projects in the capital plan have been approved by the City Council, Providence School Building Committee, and Rhode Island School Building Authority. Messer and West Broadway were identified as a priority for the next phase of construction based on the quality of West Broadway’s current facility, current enrollment and a strong feeder pattern between Asa Messer and West Broadway, and the ability to use the existing Asa Messer site for a Pre-K through 8 school. |\n| --- |\n| The Transition Plan during Construction\u003Cbr>Q1. Where will Asa Messer students go during construction? What is the timeline for construction and for moving to swing space?\u003Cbr>A. Asa Messer students will temporarily relocate to a swing space for two years, Fall 2025 through Spring 2027. The swing space ","cbCainlJkAHABFDc","https://ap.wps.com/l/cbCainlJkAHABFDc","pdf",211243,"English","# Overview\n## Plan for Asa Messer Elementary School\n## Investment identification and funding\n# The Transition Plan during Construction\n## Student relocation and timeline\n## Support for specialized student populations\n## Family tours of the Lauro building\n## Planned Lauro work for Fall 2025\n# The future Asa Messer PreK-8 School\n## Rationale for starting construction now\n## Benefits of the PreK-8 model\n## Scheduling and class sizes\n## Incorporating safety and outdoor play\n## Input from parents and staff","[{\"question\":\"What is the plan for Asa Messer Elementary School?\",\"answer\":\"The City and District are investing $62.5 million to rebuild Asa Messer Elementary School and bring together Asa Messer and West Broadway Middle School into one shared campus. The new school will be built on the current Asa Messer Pre-K to Grade 4 site as a Pre-K through Grade 8 school.\"},{\"question\":\"Where will students go during construction, and what is the timeline?\",\"answer\":\"Asa Messer students will temporarily relocate to swing space for two years, from Fall 2025 through Spring 2027. The identified swing space is the former Lauro Elementary School at 99 Kenyon Street, Providence, RI 02903.\"},{\"question\":\"How will the transition support pre-kindergarten and special education students?\",\"answer\":\"As work improves Lauro as swing space, accessibility upgrades such as an exterior ramp will be included. In addition, the plan likely involves temporarily relocating five pre-kindergarten and special education classrooms to the newly renovated Narducci Learning Center during construction, with updates expected in the coming weeks.\"}]","Asa Messer-West Broadway PreK-8 Construction Plan FAQs | PDF",1790271680,[145,149,153,157],{"page_no":22,"url":146,"width":147,"height":148},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/1777e367c2b27a2164d0fb444ee7c176.webp",983,1272,{"page_no":26,"url":150,"width":151,"height":152},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/91d904f60224d561869c263d38e334a0.webp",982,1270,{"page_no":30,"url":154,"width":155,"height":156},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/ba1668c6b258e2eff8e0610e4e901306.webp",981,1269,{"page_no":33,"url":158,"width":159,"height":160},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/25b3abbe623bd9cb839ad2c61b4647ef.webp",980,1268]