[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-662986-105":59,"doc-detail-662986-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","as-built-drawing-general-notes-fire-protection-notes-drainage-notes","AS BUILT DRAWING - General Notes - Fire Protection Notes - Drainage Notes","","As-built drawing notes outlining construction requirements and compliance obligations. Includes general instructions such as not scaling the drawing, using figured dimensions, verifying levels and heights on site, reporting errors to the architect, locating and protecting existing services, and specifying DPCs, brick force, and approved glass. Provides fire protection requirements covering statutory acts, occupancy classification guidance, extinguisher and hose reel installation, escape door locking devices, photoluminescent signage, fire stops, non-combustible ceilings, and structural stability ratings.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/as-built-drawing-general-notes-fire-protection-notes-drainage-notes/662986/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/as-built-drawing-general-notes-fire-protection-notes-drainage-notes/662986.png","ImageObject",300,407,{"name":92,"@type":93},"Ezra","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":14},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What are the general requirements before starting work based on this drawing?","Question",{"text":112,"@type":113},"The drawing must not be scaled; figured dimensions, levels, and measurements should be used. Levels and dimensions must be verified on site and discrepancies reported to the ADA representative immediately.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What fire protection requirements are specified?",{"text":117,"@type":113},"Work must comply with Act 103 of 1977 and SABS 0400-1990. Extinguishers, hose reels, approved locking devices for escape doors, photoluminescent escape and equipment signage, fire stops, non-combustible ceilings, and a minimum 30-minute stability rating are required.",{"name":119,"@type":110,"acceptedAnswer":120},"How are drainage and sanitary fittings addressed in the notes?",{"text":121,"@type":113},"Sanitary fittings must comply with relevant local authority requirements. Drain pipes have defined minimum/maximum falls, waste and soil pipes must be fully accessible, traps and ventilation outlet positioning are specified, and drains under buildings or footings must be encased in minimum 100mm concrete.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},662986,1793224142,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":81},1099514068035,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","􀀔􀀔􀀓􀂑 +'3( )0 &/$66 􀀔􀀙 􀀔0 '((3  \n􀀔􀀔􀀓􀂑 )0 83  \nJOIN INTO EXISTING PIPE  \n1  \n5  \n7  \n8  \n10   \n| | |\n| --- | --- |\n\n\n| | |\n| --- | --- |\n\n| | |\n| --- | --- |\n\nAS BUILT DRAWING  \n| \u003Cbr>REVISIONS |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| Rev.\u003Cbr>No. | Date |  | Int | Description |  |  |  |  |  |  |  |  |  |  |\n| AB | 01-06-2011 |  | TN | AS BUILT DRAWING |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  | \u003Cbr>GENERAL NOTES |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  | THIS DRAWING IS NOT TO BE SCALED.\u003Cbr>FIGURED DIMENSIONS TO BE USED AT ALL TIMES.\u003Cbr>CONTRACTOR IS RESPONSIBLE FOR CORRECT SETTING OUT OF THE BUILDING, ALL EXTERNAL AND INTERNAL WALLS WITH PARTICULAR REFERENCE TO BUILDING LINES, BOUNDARIES, ETC..\u003Cbr>CONTRACTOR TO VERIFY ALL LEVELS, HEIGHTS AND DIMENSIONS ON SITE AND TO CHECK SAME AGAINST THE DRAWING BEFORE PUTTING ANY WORK.\u003Cbr>ALL CONTRACTORS TO CHECK DETAILS SHOWN ON THIS DRAWING FOR COMPLIANCE WITH STANDARDS OF GOOD BUILDING PRACTICE WITH PARTICULAR REFERENCE TO SPECIAL REQUIREMENTS NECESSITATED BY LOCAL AND OR ONSITE CONDITIONS AND REPORT ANY COMMENT TO THE ARCHITECT.\u003Cbr>ANY ERROR, DISCREPANCIES OR OMMISSIONS TO BE REPORTED TO THE ARCHITECT IMMEDIATELY.\u003Cbr>FINAL DIMENSIONS TO BE TAKEN ON SITE BEFORE ORDERING, SUPPLYING AND FIXING PROPRIETARY OR DETAILED FITTINGS.\u003Cbr>CONTRACTORS ARE TO LOCATE AND IDENTIFY EXISTING SERVICES ON SITE AND TO PROTECT THESE FROM DAMAGE THROUGHOUT THE DURATION OF THE WORKS.\u003Cbr>CONTRACTORS ARE TO BUILD IN DPC'S WHETHER OR NOT THESE ARE SHOWN ON DRAWING TO ALL EXTERNAL WALLS, AT EACH FLOOR AND TO ALL WINDOWS,\u003Cbr>DOORS OR OTHER OPENINGS IN EXTERNAL WALLS. CAVITY WALLS TO HAVE STEPPED DPC.S.\u003Cbr>CONTRACTOR TO BUILD IN BRICK FORCE EVERY 5TH COURSE IN BRICK WALLS AND EVERY 2ND COURSE ABOVE WINDOWS, DOORS AND ALL OTHER OPENINGS.\u003Cbr>ALL GLASS TO BE ACCORDING TO N. B. R AND TO BE S.A. B.S APPROVED.\u003Cbr>3mm THICK GLASS FOR 0-0,75 AREA 4mm THICK GLASS FOR 0,75-1,50 AREA 6mm THICK GLASS FOR 1,50-LARGER AREA\u003Cbr>SLIDING DOOR TO HAVE SAFETY GLASS WITH GLAZING INDICATOR.\u003Cbr>ANY QUERIES ARISING FROM ALL THE ABOVE MUST BE REPORTED TO THE ARCHITECT FOR CLARIFICATION BEFORE ANY WORKS ARE PUT IN HAND.\u003Cbr>QUALITY OF ALL MATERIALS AND WORKMANSHIP TO COMPLY WITH THE RELEVANT S.A. B.S AND B.S.S SPECIFICATION |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  | \u003Cbr>FIRE PROTECTION NOTES: |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  | 1.ALL WORK TO COMPLY WITH ACT 103 OF 1977 AND SABS 0400-1990.\u003Cbr>2.OCCUPANCY CLASSIFICATION:\u003Cbr>3a. EXTINGUISHERS TO BE INSTALLED IN ACCORDANCE WITH SABS 0105\u003Cbr>3b. FIRE EXTINGUISHERS TO BE IN ACCORDANCE WITH SABS CODE OF PRACTICE 0400. ALL EXTINGUISHERS TO BE REFILLABLE HAND HELD PROTABLE TYPE, HUNG ON\u003Cbr>APPROPRIATE APPROVED WALL MOUNTED HANGERS AT 1500mm ABOVE FLOOR LEVEL. 4a. HOSE REELS TO BE INSTALLED IN ACCORDANCE WITH SABS 543.\u003Cbr>􀀗E􀀑􀀖􀀓P /21* 􀀕􀀓PP􀂑 ),5( +26(6􀀏 ,1 $&&25'$1&( :,7+ 6$%6 &2'( 2) 35$&7,&( 􀀓􀀗􀀓􀀓􀀏 72 %( ),;(' 72 :$//6 :,7+ 􀀔􀀓􀀓PP􀂑 5$* %2/76􀀏 􀀕􀀔􀀓􀀓PP $%29( )/225 /(9(/ 72 &(175( OF FIRE HOSE REEL.\u003Cbr>5. WATER SUPPLY TO THE FIRE FIGHTING EQUIPMENT TO COMPLY WITH THE ATTACHED RATIONAL DESIGN AND WITH WATER BRANCH BY-LAWS.\u003Cbr>6. EXCAPE DOORS MAY ONLY BE FITTED WITH APPROVED LOCKING DEVICES.\u003Cbr>7. PHOTOLUMINESCENT EXCAPE SIGNS TO BE PROVIDED AND TO COMPLY WITH SABS 1186. PHOTOLUMINESCENT\u003Cbr>PICTORIAL SIGNS INDICATING FIRE EQUIPMENT TO BE PROVIDED AND TO COMPLY WITH SABS 1186.\u003Cbr>8. PORTABEL FIRE EXTINGUISHERS TO BE HUNG ON PURPOSE MADE BOARDS AS INDICATEDON PLAN.\u003Cbr>9. ROOF VOID SUBDIVIDED WITH NON-COMBUSTIBLE FIRE STOPS INTO AREAS NOT EXCEEDING 300sq. m WITH BRICK WALLS.\u003Cbr>10.SUSPENDED CEILINGS AND ITS SUPPORTING MEMBERS SHALL BE OF NON-COMBUSTIBLE MATERIAL.\u003Cbr>11.STRUCTURAL","cbCaigNOME9f73Xg","https://ap.wps.com/l/cbCaigNOME9f73Xg","pdf",755975,"English","# General Notes\n# Fire Protection Notes\n# Drainage Notes\n# Additional Drawing Note","[{\"question\":\"What are the general requirements before starting work based on this drawing?\",\"answer\":\"The drawing must not be scaled; figured dimensions, levels, and measurements should be used. Levels and dimensions must be verified on site and discrepancies reported to the ADA representative immediately.\"},{\"question\":\"What fire protection requirements are specified?\",\"answer\":\"Work must comply with Act 103 of 1977 and SABS 0400-1990. Extinguishers, hose reels, approved locking devices for escape doors, photoluminescent escape and equipment signage, fire stops, non-combustible ceilings, and a minimum 30-minute stability rating are required.\"},{\"question\":\"How are drainage and sanitary fittings addressed in the notes?\",\"answer\":\"Sanitary fittings must comply with relevant local authority requirements. Drain pipes have defined minimum/maximum falls, waste and soil pipes must be fully accessible, traps and ventilation outlet positioning are specified, and drains under buildings or footings must be encased in minimum 100mm concrete.\"}]","AS BUILT DRAWING - General Notes - Fire Protection Notes - Drainage Notes | PDF"]