[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-664617-105":59,"doc-detail-664617-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","as-built-checklist-redline-drawings-and-project-plans-requirements","As-Built Checklist - Redline Drawings and Project Plans Requirements","","As-Built Checklist provides detailed requirements for preparing construction record drawing packages, including handling redline changes, verifying sheet counts, and updating title block information with “AS-BUILT” markers and responsible initials. It specifies how to add contractor and inspector data, populate cover-sheet material summaries for water and sewer systems, cloud and delta revisions, and correctly label additive alternates. It also directs removal or cross-out of unbuilt work and the revision of proposed “PIPE” notes to actual constructed or rehabilitated materials, plus supporting stationing and service/lateral details.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/as-built-checklist-redline-drawings-and-project-plans-requirements/664617/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/as-built-checklist-redline-drawings-and-project-plans-requirements/664617.png","ImageObject",300,407,{"name":92,"@type":93},"supergirl","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":102,"interactionType":103,"userInteractionCount":19},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What does the checklist require for redline drawings delivery?","Question",{"text":112,"@type":113},"The checklist requires providing the project management team the entire set of redlines and ensuring the redline changes are incorporated into the As-Built drawing file with clouding and numbered delta △ symbols.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How should the “AS-BUILT” information be entered on the title block?",{"text":117,"@type":113},"It must be added under the “ORIGINAL” section as “AS-BUILT,” with a delta △ next to it on sheets that have redline changes, and it should include PE and drafter initials under “BY” near “AS-BUILT.”",{"name":119,"@type":110,"acceptedAnswer":120},"How are unbuilt work and additive alternates handled on the As-Built sheets?",{"text":121,"@type":113},"If an entire sheet was not built, cross out the entire page with a thick line weight and add “NOT IN CONTRACT” above the title block without deleting the page. For additive alternates, add “ADDITIVE ALTERNATE CONSTRUCTED” if built, or “ADDITIVE ALTERNATE NOT CONSTRUCTED” if not built.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},664617,1793262717,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":19,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":29,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":143},962088121634,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","As-Built Checklist  \nAs-Built Checklist  \nProject Name:   WBS\\#:   D-Sheet \\#:   Project Engineer (PE):   Date:   Resident Engineer (RE):   Date:    \n\n| REDLINE DRAWINGS |  |  |\n| --- | --- | --- |\n| RE |  | COMMENTS |\n| | Provide Project Management Team entire set of Redlines. |  |\n\n\n| TITLE BLOCK (FOR ALL SHEETS) |  |  |\n| --- | --- | --- |\n| PE ITEMS COMMENTS |  |  |\n| | Verify sheet count and sheet totals are correct and are consistent with Sheet Index. |  |\n| | Under “DESCRIPTION” add “AS-BUILT”(this should be under“ORIGINAL”).\u003Cbr>Add a delta △ next to “AS-BUILT” on sheets with redline changes. |  |\n| | Add Project Engineer and Drafter initials under “BY”, next to “AS-BUILT”. |  |\n| | Add Contractor Name, Inspector Name, Date Started, and Date Finished.\u003Cbr>Date Started is the Notice to Proceed date. Date Finished is the Notice of Completion date. |  |\n| | Add “AS-BUILT in the bottom page boarder under the title block. |  |\n\n\n| PROJECT PLANS |  |  |\n| --- | --- | --- |\n| PE ITEMS COMMENTS |  |  |\n| | On the Cover Sheet, in the Sheet Index under \"MATERIAL\" add the type of material that was used for the construction of water and sewer pipelines. |  |\n| | On the Cover Sheet, add the following to the cover sheet using City Notes Cell Library:\u003Cbr>WHERE THIS AS-BUILT DRAWING\u003Cbr>INDICATES THE PRESENCE OF UTILITIES NOT OWNED OR OPERATED BY THE CITY OF SAN DIEGO, SUCH INDICATIONS SHALL MERELY REFLECT A NOTED ENCOUNTER WITH THOSE UTILITIES DURING THE COURSE OF PROJECT\u003Cbr>CONSTRUCTION. THE CITY OF SAN DIEGO MAKES NO WARRANTIES OR REPRESENTATIONS WITH RESPECT TO THE ACCURACY OF THIS INFORMATION AND NO SUBSEQUENT USERS MAY RELY\u003Cbr>THEREON FOR ANY PURPOSE WHATSOEVER. |  |\n| | On the Cover Sheet, in the “AS-BUILT INFORMATION” area next to the title block, add the materials that were used (water/sewer pipe types, rehab liner, manholes, valves, fire hydrants) and their respective manufactures. |  |\n| | On all sheets, add all changes from the redlines into the As-Built drawing file. Cloud all changes made and put a numbered delta △ next to the clouds. |  |\n| | On all sheets, add any clarifications to the As-Built where appropriate (such as whether Additive Alternatives were constructed) .\u003Cbr>For work not built during construction:\u003Cbr>If entire sheet was not built: X-out the entire page using a thick line weight and add “NOT IN CONTRACT” above the title block. Do not delete the page.\u003Cbr>If just a part of the sheet was not built: Remove work not completed and put a cloud and delta in its place.\u003Cbr>For Additive Alternates:\u003Cbr>If Additive Alternate was built: Add “ADDITIVE ALTERNATE CONSTRUCTED” above the title block.\u003Cbr>If Additive Alternat was not built: Add “ADDITIVE ALTERNATE NOT CONSTRUCTED”above the title block. |  |\n| | On all sheets, on plan and profiles, change proposed “PIPE” to the material that the pipe was constructed or rehabbed with.\u003Cbr>For example, the plan and profile of a design sheet before As-Built might say “12”PIPE”. When drafting this As-Built, this would get revised to “12” PVC”, assuming PVC was the material the pipe was constructed with. |  |\n| | On all sheets, add water service and sewer lateral material if different from proposed main pipe material. |  |\n| | On all sheets, add water service and sewer lateral stationing. |  |\n\nSample As-Built Title Blocks  \n| CHANGE | G)\u003Cbr>@@\u003Cbr>G\u003Cbr>®\u003Cbr>©\u003Cbr>Q)\u003Cbr>@\u003Cbr>®@\u003Cbr>®®\u003Cbr>®\u003Cbr>®\u003Cbr>®\u003Cbr>@)\u003Cbr>®\u003Cbr>®@\u003Cbr>®\u003Cbr>@\u003Cbr>@\u003Cbr>@ | COVER SHEET TITLE BLOCK-PROJECT TITLE FOR CIP PROJECTS SHALL BE THE SAME AS THE TITLE OF THE PROJECT IN THE C. I. P. BUDGET BOOK\u003Cbr>DISCIPLINE DESIGNATORS-OPTIONAL, AS SHOWN ON THE COVER SHEET\u003Cbr>SHEET XX OF YY SHEET-XX REPRESENTS THE INDIVIDUAL SHEET AND YY REPRESENTS THE TOTAL NUMBER OF SHEETS\u003Cbr>WORK BREAKDOWN STRUCTURE (WBS) -OBTAIN AND PLACE THE (WBS)(S) IN THE APPROPRIATE BLOCK AS SHOWN\u003Cbr>PROJECT MANAGER-NAME OF THE PROJECT MANAGER\u003Cbr>PRIVATE PROJECT PLANS: NIA\u003Cbr>PROJECT ENGINEER-NAME OF THE PROJECT ENGINEER\u003Cbr>PRIVATE PROJECT PLANS: NIA\u003Cbr>CCS27 ","cbCainPfseuLEqf6","https://ap.wps.com/l/cbCainPfseuLEqf6","pdf",2058111,"English","# As-Built Checklist\n## Redline Drawings\n## Title Block (For All Sheets)\n## Project Plans\n## Sample As-Built Title Blocks","[{\"question\":\"What does the checklist require for redline drawings delivery?\",\"answer\":\"The checklist requires providing the project management team the entire set of redlines and ensuring the redline changes are incorporated into the As-Built drawing file with clouding and numbered delta △ symbols.\"},{\"question\":\"How should the “AS-BUILT” information be entered on the title block?\",\"answer\":\"It must be added under the “ORIGINAL” section as “AS-BUILT,” with a delta △ next to it on sheets that have redline changes, and it should include PE and drafter initials under “BY” near “AS-BUILT.”\"},{\"question\":\"How are unbuilt work and additive alternates handled on the As-Built sheets?\",\"answer\":\"If an entire sheet was not built, cross out the entire page with a thick line weight and add “NOT IN CONTRACT” above the title block without deleting the page. For additive alternates, add “ADDITIVE ALTERNATE CONSTRUCTED” if built, or “ADDITIVE ALTERNATE NOT CONSTRUCTED” if not built.\"}]","As-Built Checklist - Redline Drawings and Project Plans Requirements | PDF",15]