[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-514500-105":59,"doc-detail-514500-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","architectural-review-committee-hoosegow-park-landscape-renovation-project-13-005-staff-recommendation-and-financialaccessplanting-impact","ARCHITECTURAL REVIEW COMMITTEE - HOOSEGOWPARK LANDSCAPE RENOVATION PROJECT 13-005 - Staff Recommendation and Financial/Access/Pl anting Impact","","Memorandum for the Architectural Review Committee evaluating Hoosegow Park landscape and accessibility renovations for Project 13-005. Staff recommends ARC review of proposed landscape improvements and a recommendation to the City Council on using CDBG funds for the accessibility component. The plan outlines funding through volunteer labor, material donations, and $23,000 in 2013 CDBG funds, describes a compliant ADA travel path, and specifies planting changes to improve access, reduce water use, control shortcuts, and address community privacy and noise concerns.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/architectural-review-committee-hoosegow-park-landscape-renovation-project-13-005-staff-recommendation-and-financialaccessplanting-impact/514500/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/architectural-review-committee-hoosegow-park-landscape-renovation-project-13-005-staff-recommendation-and-financialaccessplanting-impact/514500.png","ImageObject",300,407,{"name":92,"@type":93},"Eliana","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-10","2026-10-06",true,{"@type":102,"interactionType":103,"userInteractionCount":39},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What action does staff recommend the Architectural Review Committee take?","Question",{"text":112,"@type":113},"Staff recommends that the ARC review the proposed landscape improvements and make a recommendation to the City Council for the use of CDBG funds for the accessibility component.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How will the renovation project be funded?",{"text":117,"@type":113},"The project will be supported through cost sharing contributions including volunteer labor, material donations, and cash funds. The City contribution is an allocation of 2013 CDBG funds of approximately $23,000 toward construction of the accessible path.",{"name":119,"@type":110,"acceptedAnswer":120},"What changes are proposed to improve accessibility and visitor experience?",{"text":121,"@type":113},"The plan creates an ADA accessible path of travel from disabled parking across Le Point Street to a signed entrance, continuing up via a 5% or less concrete ramp toward the Hoosegow plaza, with stairs providing access from the upper side. Landscape improvements include turf removal, seating around the plaza, drought-tolerant plantings, and privacy screening along the upper boundary.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},514500,1791416310,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":39,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":52,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":143,"read_time":144,"preview_page_count":19,"preview_urls":145},4398048949847,"https://ap-avatar.wpscdn.com/avatar/400002536579ef2da7f?_k=1778318612642679267","MEM ORANDUM  \n# ARCHITECTURAL REVIEW COMMITTEE\n\nTO:  \nFROM:AILEEN NYGAARD,ASSISTANT PLANNER  \nSUBJECT:HOOSEGOWPARK    LANDSCAPE  \nRENOVATION PROJECT 13-005;LOCATION-LE POINT STREET;APPLICANT-CITY OF ARROYO GRANDE  \nDECEMBER 2,2013  \nDATE:  \nRECOMMENDATION:  \nStaff recommends that the ARC review the proposed landscape improvements andmake a recommendation to the City Council for the use of CDBG funds for theaccessibility component.  \n## FINANCIAL IMPACT:\n\nThe renovation project will be funded by cost sharing contributions from various groupsin the form of volunteer labor,material donations,and cash funds.Participants include:Rotary Club,Arroyo Grande in Bloom,South County San Luis Obispo HistoricalSociety,private donor,and the City.The City contribution will be an allocation of 2013CDBG funds in the approximate amount of $23,000 to contribute toward construction ofthe accessible path.  \n## BACKGROUND:\n\nOn February 15,2013 an informal group of City staff and community members met todiscuss the possibility of initiating a renovation project for Hoosegow Park.HoosegowPark is located on Le Point Street between Miller Way and Nevada Street and is shownbelow,highlighted in red.Cal Poly Landscape Architecture students presentedconceptual design plans to the Commission in June,2013.  \nA single conceptual design plan was formulated by the renovation committee basedupon ideas presented by the students and comments from members on the participatingorganizations.The Parks and Recreation Commission reviewed the project onNovember 13,2013 and approved the design as proposed.  \nARCHITECTURAL REVIEW COMMITTEESTF 13-005DECEMBER 2,2013PAGE 2  \n## ANALYSIS OF ISSUES:\n\nHoosegow Park is a City maintained facility that is generally under-utilized and is notwell known in the community due to its location behind the Village core and itsinaccessibility,both visually and physically.The park contains the historic Hoosegow,ajail facility that was built around 1906 and used for several decades based on scantreferences gleaned from a search of newspaper records.The jail was a short termholding facility prior to transferring prisoners to the County seat in San Luis Obispo.  \nThe renovation project will emphasize this resource as the focal point of the design bycreating a plaza with seating around the Hoosegow and in the future providing aneducational display on the interior of the structure.The park is currently listed on theArroyo Grande Village Improvement Association history walk,however,the feature isnot often visited due to lack of visible connection to the Village core.The plantingrenovation will provide color accents to draw visitor's eyes to the location and newvegetation will physically open the site to views from the street.In addition,physicalaccess improvements will provide an important function by creating a new invitingentrance both visually and physically  \n## Access Improvements:\n\nCurrently,the park is accessed from Le Point Street below and above the park.Le PointStreet has no sidewalk access on the park side of the street and visitors are currentlyrequired to walk across the unmarked street to an indiscreet set of wood steps oraccess the park from above through a public easement on a drive signed as private.Both access points are narrow,uneven and not currently accessible by individuals usingwheelchairs.The proposed renovation project will provide a path of travel from adisabled parking space in the Le Point Street parking lot,across Le Point Street to anew signed entrance and continue up into the park by an ADA accessible concreteramp cut into the front slope.The path will continue to ramp up toward the Hoosegowplaza at 5%or less.A transition to decomposed granite treated with soil binders willoccur halfway through.Access from the upper side willbe provided by new stairs.  \n## Landscape lmprovements:\n\nTypically,removal of turf would change the activity use of the park from active topassive.However,the current lawn area does not appear to b","cbCaiqkEexYhRVyT","https://ap.wps.com/l/cbCaiqkEexYhRVyT","pdf",1717698,"English","# Architectural Review Committee Memorandum\n## Financial Impact\n## Background\n## Analysis of Issues\n## Access Improvements\n## Landscape Improvements\n## Advantages\n## Disadvantages","[{\"question\":\"What action does staff recommend the Architectural Review Committee take?\",\"answer\":\"Staff recommends that the ARC review the proposed landscape improvements and make a recommendation to the City Council for the use of CDBG funds for the accessibility component.\"},{\"question\":\"How will the renovation project be funded?\",\"answer\":\"The project will be supported through cost sharing contributions including volunteer labor, material donations, and cash funds. The City contribution is an allocation of 2013 CDBG funds of approximately $23,000 toward construction of the accessible path.\"},{\"question\":\"What changes are proposed to improve accessibility and visitor experience?\",\"answer\":\"The plan creates an ADA accessible path of travel from disabled parking across Le Point Street to a signed entrance, continuing up via a 5% or less concrete ramp toward the Hoosegow plaza, with stairs providing access from the upper side. Landscape improvements include turf removal, seating around the plaza, drought-tolerant plantings, and privacy screening along the upper boundary.\"}]","ARCHITECTURAL REVIEW COMMITTEE - HOOSEGOWPARK LANDSCAPE RENOVATION PROJECT 13-005 - Staff Recommendation and Financial/Access/Pl anting Impact | PDF",1791300143,25,[146,150,154,158],{"page_no":8,"url":147,"width":148,"height":149},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/85008a46bec29dc0e777ab61c3a964c9.webp",983,1272,{"page_no":14,"url":151,"width":152,"height":153},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/b876e360d22af9ddd35701833a3a179c.webp",982,1270,{"page_no":81,"url":155,"width":156,"height":157},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/67745a0d6e19009d0f250074ac318137.webp",981,1269,{"page_no":19,"url":159,"width":160,"height":161},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/82b7991c0dc3e7cd7d06b49ca8a3c191.webp",980,1268]