[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-662616-105":59,"doc-detail-662616-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","architectural-drawings-volume-4-drawings","ARCHITECTURAL DRAWINGS - Volume 4 - Drawings","","Architectural drawing package for the refurbishment of ablution facilities at or Tambo International Airport, including bathroom indicative location layout and detailed finish specifications. The sheets cover issued-for-tender documentation dated 2019.11.01 with scale notes and compliance references. It provides wall and ceiling void preparation instructions, epoxy and tile finish systems, trim and cove details, baffle panel spacing, and corner protector requirements, with keynotes and revision tracking for construction coordination.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/architectural-drawings-volume-4-drawings/662616/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/architectural-drawings-volume-4-drawings/662616.png","ImageObject",300,407,{"name":92,"@type":93},"Fishy","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":8},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What is the project covered by these architectural drawings?","Question",{"text":112,"@type":113},"These drawings relate to the refurbishment project for ablutions at or Tambo International Airport.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What instructions are given for using the drawings and applying finishes?",{"text":117,"@type":113},"The drawings specify that they are not to be scaled, figured dimensions must be used, and dimensions and levels must be checked on site before work proceeds.",{"name":119,"@type":110,"acceptedAnswer":120},"Which types of wall finishes and details are included?",{"text":121,"@type":113},"The package includes epoxy wall finish and trim details, tiled wall finish trim details, ceiling void and paint preparation notes, and corner protector plan/capping details.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},662616,1793220828,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":8,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":129,"read_time":144},14431098389841,"https://eur-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","ARCHITECTURAL DRAWINGS  \n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| | copyright | general notes | project details | drawing title | revisions |  |  |  | | issued for TENDER | drawing info |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  | DRAWN CHECKED DATE SIZE - - 2019.11.01 SCALE: 1 : 100 @ A1\u003Cbr>drawing number |  |  |  |  |  |\n|  | In accordance with the relevant clauses of the Copyright Act 1978 (Act 98 of 1978) relating to assignment, all documents prepared by The Agent in connection with the project remain the property and copyright of The Agent, subject to their use by the client for the particular project to which this document relates, and the client shall not beentitled, either directly or indirectly, to make use of the document(s) for the carrying out of any additional or similar works or publish the same except with the prior consent from The Agent. | 1. All work is to be done in accordance with the National Building Regulations.\u003Cbr>2. All materials and workmanship are to comply with the [relevant S.A.N.S. codes](relevant S.A.N.S. codes).\u003Cbr>3. This drawing is not to be scaled. Figured dimensions to be used.\u003Cbr>4. This drawing must be read in conjunction with all the relevant drawings and specifications issued by qualified architects, engineers, and other consultants.\u003Cbr>5. All dimensions and levels must be checked on site by the contractor before putting work in hand. | THE REFURBISHMENT PROJECT FOR ABLUTIONS AT OR TAMBO INTERNATIONAL AIRPORT\u003Cbr>Witkoppie 64, Johannesburg, International Air, Kempton Park. 1627,GT\u003Cbr>Airports Company South Africa | BATHROOM INDICATIVE LOCATION LAYOUT | Number | Revision Description | Date | Issued by |  |  |  |  |  |  |  |  |\n|  |  |  |  |  | A | ISSUED FOR TENDER | 2019.11.01 |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  | PROJECT\u003Cbr>NUMBER | SHEET NUMBER | PROJECT\u003Cbr>STAGE | REVISION |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  | 304 | DS05 | T | A |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n\n\n| 2700\u003Cbr>\u003Cbr>\u003Cbr>150 2550\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>Prepare and paint existing ceiling void, existing and new services\u003Cbr>\u003Cbr>~~ ~~ Aluminium Straight Edge Trim Colour : Natural Anodized\u003Cbr>Keynote : TRM-613\u003Cbr>bottom of ceiling\u003Cbr>\u003Cbr>Flowcrete Peran STB Epoxy Resin Colour : TBC Keynote : PNT-451 \u003Cbr>\u003Cbr>~~ ~~ Flowcrete Epoxy Resin Cove\u003Cbr>\u003Cbr>Colour : TBC\u003Cbr>Keynote : SKR-421\u003Cbr>\u003Cbr>~~ ~~ Aluminium Straight Edge Trim Colour : Natural Anodized\u003Cbr>Keynote : TRM-613\u003Cbr>2700\u003Cbr>\u003Cbr>\u003Cbr>150 2550\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>Note:\u003Cbr>Please refer to detail 3 for cove detail\u003Cbr>DETAIL 1-Wall Finish Details\u003Cbr>Scale- 1 : 20\u003Cbr>Paint wall above epoxy finish . Cei l ing void to be \u003Cbr>\u003Cbr>\u003Cbr>painted including services . Colour T . B .C\u003Cbr>\u003Cbr> Hunter Douglas Luxalon® V100 Baffle panels.\u003Cbr>\u003Cbr>Panels to be spaced @ 100mm centres. Colour T. B.C. Ceiling height to be 2700mm AFFL.\u003Cbr>Keynote : CLG-541\u003Cbr> Kirk Marketing aluminium straight edge trim, Code\u003Cbr>ASE060 or similar approved Keynote : TRM-613\u003Cbr> Plaster to wall to take new epoxy wall finish. Wall\u003Cbr>prep to be inspected and accepted prior to finish being applied. Keynote : PLS-141\u003Cbr> Flowcrete Peran STB Epoxy resin wall finish,\u003Cbr>installation as per approved installer. Colour : T. B.C\u003Cb","cbCaisnSqLljQ1oy","https://ap.wps.com/l/cbCaisnSqLljQ1oy","pdf",10465856,41,"English","# General Notes and Copyright\n## Issued for Tender and Project Information\n# Finish Details\n## Wall Finish Details\n## Epoxy Wall Finish Trim\n## Tiled Wall Finish Trim\n## Corner Protector\n## Plan and Capping Details","[{\"question\":\"What is the project covered by these architectural drawings?\",\"answer\":\"These drawings relate to the refurbishment project for ablutions at or Tambo International Airport.\"},{\"question\":\"What instructions are given for using the drawings and applying finishes?\",\"answer\":\"The drawings specify that they are not to be scaled, figured dimensions must be used, and dimensions and levels must be checked on site before work proceeds.\"},{\"question\":\"Which types of wall finishes and details are included?\",\"answer\":\"The package includes epoxy wall finish and trim details, tiled wall finish trim details, ceiling void and paint preparation notes, and corner protector plan/capping details.\"}]","ARCHITECTURAL DRAWINGS - Volume 4 - Drawings | PDF",103]