[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-662491-105":59,"doc-detail-662491-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","architectural-drawings-3-tender-drawings-zawayda-demolition-work-plan","Architectural Drawings - 03 - Tender Drawings (Zawayda) - Demolition Work Plan","","Architectural drawing index and demolition work plan for the Zawayda Drinking Water Access Project. The drawings list multiple architectural sheets with numbering such as A01-10 through A12-10, including existing building, demolition plan, layout, plans, sections, and elevations. The DEMOLITION WORK PLAN outlines approval of methods before start, execution of demolition and alterations per bill of quantities, daily removal and disposal of debris, and dust control during demolition, while maintaining protection of the existing water well and adjacent properties. It also includes traffic circulation measures, salvage handling, shoring/bracing requirements, and diesel generator dismantling, storage, reinstallation, and contractor responsibility for any damage.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/architectural-drawings-3-tender-drawings-zawayda-demolition-work-plan/662491/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/architectural-drawings-3-tender-drawings-zawayda-demolition-work-plan/662491.png","ImageObject",300,407,{"name":92,"@type":93},"Kyle","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":24},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What approvals are required before demolition starts?","Question",{"text":112,"@type":113},"The contractor must submit proposed methods and operations to the Engineer for approval prior to starting work, including a detailed sequence for demolition and debris/removal and salvage handling.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How should debris, rubbish, and salvageable items be handled during demolition?",{"text":117,"@type":113},"Remove and legally dispose of all rubbish, debris, and salvageable items from the site on a daily basis. Salvageable items should be transported off-site at the end of each day and stored safely with coordination with the municipal engineer.",{"name":119,"@type":110,"acceptedAnswer":120},"What protections must be maintained during demolition?",{"text":121,"@type":113},"Protect the existing water well throughout the work to prevent any damage, maintain protection of persons and adjacent properties, incorporate dust control measures during demolition, and ensure safe working conditions while minimizing dust spread.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},662491,1793218463,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":24,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":129,"read_time":144},3985741905716,"https://ap-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","| Architectural Drawings   |\n| --- |\n\nList of DraWIngs  \n|  | No.   | Description   |  |\n| --- | --- | --- | --- |\n|  | A01-10   | Existing Building   |  |\n|  | A02-10   | Demolition Plan   |  |\n|  | A03-10   | General Layout   |  |\n|  | A04-10   | Ground Floor Plan   |  |\n|  | A05-10   | Roof Floor Plan   |  |\n|  | A06-10   | Sections   |  |\n|  | A07-10   | Elevations   |  |\n|  | A08-10   | Elevations   |  |\n|  | A09-10   | Metal Windows Details   |  |\n|  | A10-10   | Metal Doors Details   |  |\n|  | A11-10   | Wooden Door Details   |  |\n|  | A12-10   | Aluminum Window Details   |  |\n\n\n| PROJECT:  \u003Cbr>Zawayda Drinking  \u003Cbr>Water Access Project   |  |  |\n| --- | --- | --- |\n| DRAWING No.A00-10   |  |  |\n| DRAWING NAME:   |  |  |\n| SCALE:   |  | PAPER SIZE:   |\n| 1:100   |  | A3   |\n| DESIGNED BY:   | ENFRA CONSULTANTS   |  |\n| DRAWN BY:   | ENFRA CONSULTANTS   |  |\n| CHECKED BY:   | ENFRA CONSULTANTS   |  |\n| APPROVED BY   | ENFRA CONSULTANTS   |  |\n| Engincering.Management &Infrastructure Consultants  \u003Cbr>Gaza Remal Neama Tower Fax.2840580 Tel.2836155.   |  |  |\n\n\n|  |  |  |  |\n| --- | --- | --- | --- |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n| MERCY  \u003Cbr>CORPS   |  |  |  |\n| PROJECT:  \u003Cbr>Zawayda Drinking  \u003Cbr>Water Access Project   |  |  |  |\n| DRAWING No.:A01-10   |  |  |  |\n| DRAWING NAME:  \u003Cbr>Existing Building   |  |  |  |\n| SCALE:   |  | PAPER SIZE:   |  |\n| 1:100   |  | A3   |  |\n| DESIGNED BY:   | ENFRA CONSULTANTS   |  |  |\n| DRAWN BY:   | ENFRA CONSULTANTS   |  |  |\n| CHECKED BY:   | ENFRA CONSULTANTS   |  |  |\n| APPROVED BY:   | ENFRA CONSULTANTS   |  |  |\n| Engincering.Managcment &Infrastructure Consultants  \u003Cbr>Gaza Remal Neama Tower Fax.2840580 Tel.2836155.   |  |  |  |\n\nExisting Building  \n# DEMOLITION WORK PLAN:\n\n)1 Submit proposed methods and operations to the Engineer for approvalprior to start of the Work.Include in schedule,and provide a detailedsequence of demolition and the removal of debris and the salvaged items.  \n)2 The complete demolition and alteration items and other item as indicated inthe bill of quantities.  \n)3 Remove from the site and legally dispose off the site on daily basis,allrubbish,debris,salvageable items,etc.,resulting from the work of thissection.  \n)4 Maintain protection of the existing water wellto prevent any damagethroughout the progress of the work.Incorporate dust control measuresduring demolition.  \n)5 Accomplish all demolition and alteration items as indicated in the B.0.Qwithout damaging existing adjacent properties.  \n)6 The contractor shall ensure the continuous operation of the water wellthroughout the demolition and construction period without interruption,according to the municipality's program.  \n\n| PROJECT:  \u003Cbr>Zawayda Drinking  \u003Cbr>Water Access Project   |  |  |\n| --- | --- | --- |\n| DRAWING No.A02-10   |  |  |\n| DRAWING NAME:  \u003Cbr>DEMOLITION PLAN   |  |  |\n| SCALE:   |  | PAPER SIZE:   |\n| 1:100   |  | A3   |\n| DESIGNED BY:   | ENFRA CONSULTANTS   |  |\n| DRAWN BY:   | ENFRA CONSULTANTS   |  |\n| CHECKED BY:   | ENFRA CONSULTANTS   |  |\n| APPROVED BY   | ENFRA CONSULTANTS   |  |\n| Engincering.Management &Infrastructure Consultants  \u003Cbr>Gaza Remal Neama Tower Fax.2840580 Tel.2836155.   |  |  |\n\n)7 Maintain circulation of traffic within and around the area at all times duringand after demolition operations.Where necessary install and maintainlights,barriers,and temporary passageways for free and safe access.  \n)8 Grade areas left open as a result of an item being removed during the courseof work.Grade such areas to generally conform to the required proposednew levels as indicated on the relevant drawings.  \n)9 Salvageable items:Transport salvageable items off the site at the end ofeach day.And store it at a safe place with the coordination with themunicipal engineer.  \n)10Unsalvageable Items:  \n)11Haul materials to be removed to disposal area off the site daily,the on sitepiling of demolished materials shall not be allowed.  \n)12Maintain protection of persons and ad","cbCaidqkQRfelXJQ","https://ap.wps.com/l/cbCaidqkQRfelXJQ","pdf",35687300,63,"English","# List of Drawings\n## Existing Building (A01-10)\n## Demolition Plan (A02-10)\n## General Layout (A03-10)\n## Ground Floor Plan (A04-10)\n## Roof Floor Plan (A05-10)\n## Sections (A06-10)\n## Elevations (A07-10, A08-10)\n## Metal Windows Details (A09-10)\n## Metal Doors Details (A10-10)\n## Wooden Door Details (A11-10)\n## Aluminum Window Details (A12-10)\n# DEMOLITION WORK PLAN","[{\"question\":\"What approvals are required before demolition starts?\",\"answer\":\"The contractor must submit proposed methods and operations to the Engineer for approval prior to starting work, including a detailed sequence for demolition and debris/removal and salvage handling.\"},{\"question\":\"How should debris, rubbish, and salvageable items be handled during demolition?\",\"answer\":\"Remove and legally dispose of all rubbish, debris, and salvageable items from the site on a daily basis. Salvageable items should be transported off-site at the end of each day and stored safely with coordination with the municipal engineer.\"},{\"question\":\"What protections must be maintained during demolition?\",\"answer\":\"Protect the existing water well throughout the work to prevent any damage, maintain protection of persons and adjacent properties, incorporate dust control measures during demolition, and ensure safe working conditions while minimizing dust spread.\"}]","Architectural Drawings - 03 - Tender Drawings (Zawayda) - Demolition Work Plan | PDF",159]