[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-649732-105":59,"doc-detail-649732-en":129},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":122,"head_meta":124,"extra_data":126,"updated_unix":128},105,"en","architectural-drawings-1-of-3-renovations-elevations","Architectural Drawings 1 of 3 - Renovations Elevations","","Architectural drawings set covering renovations, elevations, and related gate and demolition details for the Thohoyandou Botanical Gardens and National Zoological Garden campuses. The sheets specify North, South and West elevations, roof and wall works including new Harvey tile roof and plaster repair and repainting, as well as fencing and pedestrian gate elements. Additional content includes issued-for-tender documentation, door schedules with ironmongery notes, and a demolition plan at 1:100 scale with items to remove and replace.",{"@graph":69,"@context":121},[70,84,104],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/architectural-drawings-1-of-3-renovations-elevations/649732/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":98,"encodingFormat":97,"isAccessibleForFree":99,"interactionStatistic":100},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/architectural-drawings-1-of-3-renovations-elevations/649732.png","ImageObject",300,407,{"name":92,"@type":93},"Aria","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-24",true,{"@type":101,"interactionType":102,"userInteractionCount":14},"InteractionCounter",{"@type":103},"ViewAction",{"@type":105,"mainEntity":106},"FAQPage",[107,113,117],{"name":108,"@type":109,"acceptedAnswer":110},"What renovations are specified in the elevations drawings?","Question",{"text":111,"@type":112},"The elevations call for a new Harvey tile roof, plaster repair and repainting, and preparation such as cleaning contaminants and sealing stonework with a stone sealer liquid.","Answer",{"name":114,"@type":109,"acceptedAnswer":115},"What details are included for the gate and fencing elements?",{"text":116,"@type":112},"The drawings include a Clear Vu fence and notes for a pedestrian gate, including installation on existing dwarf wall height and associated gate/fence arrangements.",{"name":118,"@type":109,"acceptedAnswer":119},"What information is provided in the door schedules and demolition plan?",{"text":120,"@type":112},"The document provides a door schedule with key, frame and glazing/finish notes plus ironmongery details, and a demolition plan listing items to remove and replace such as door frames, tiles, timber windows, ceilings, and security fence elements.","https://schema.org",{"og:url":83,"og:type":123,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":125,"canonical":83},"index,follow",{"doc_id":127,"site_id":62},649732,1792857758,{"code":4,"msg":5,"data":130},{"doc_id":127,"user_id":131,"nickname":92,"user_avatar":132,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":133,"file_id":134,"file_url":135,"file_type":136,"file_size":137,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":41,"language":138,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":139,"faqs":140,"seo_title":141,"seo_description":67,"update_tm":142,"read_time":143},2336464648322,"https://ap-avatar.wpscdn.com/avatar/2200025388227c56fec?_k=1778556882303663488","|  |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n|  | New Clear Vu Fence Pedestrian Gate New Clear Vu Fence Gate |  |  | Repair plaster andrepaint walls | NOTES |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |\n|  | NORTH ELEVATION\u003Cbr>New Harvey\u003Cbr>tile roof\u003Cbr>Repair plaster and\u003Cbr>repaint walls\u003Cbr>clean off all contaminates and seal of stone work with stone sealer liquid\u003Cbr>SOUTH ELEVATION\u003Cbr>New Harvey\u003Cbr>tile roof\u003Cbr>Repair plaster and repaint walls\u003Cbr>WEST ELEVATION | 1500 227\u003Cbr> 2 100 \u003Cbr>| 6 140\u003Cbr>New Clear Vu Fence Pedestrian Gate New Clear Vu Fence Gate | \u003Cbr>THOHOYANDOU BOTANICAL GARDENS\u003Cbr>1.2m high Clear Vu Fence fixed on exist dwarf wall at\u003Cbr>  1 180   height of 1.1 m\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>2 055 |  |  |  |  |  |\n|  |  |  |  |  | CLIENT |  |  |  |  |\n|  |  |  |  |  | SOUTH AFRICAN NATIONAL BIODIVERSITY INSTITUTE\u003Cbr>|  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  | R00 | 2018-12-21 | ISSUED FOR REVIEW. |  |  |\n|  |  |  |  |  | REV NO. | DATE | DESCRIPTION |  |  |\n|  |  |  |  |  | REVISIONS |  |  |  |  |\n|  |  |  |  |  | PROJECT CONSULTANT |  |  |  |  |\n|  |  | New Harvey tile roof\u003Cbr>1 200 1 200  \u003Cbr>EAST ELEVATION |  |  | PROJECTNEERS CONSULTING ENGINEERS & PROJECT MANAGERS\u003Cbr>\u003Cbr>PROJECTNEERS CONSULTING ENGINEERS & PROJECT MANAGERS\u003Cbr>BUILDING 2 , 1ST FLOOR , THORNHILL OFFICE PARK\u003Cbr>94 BEKKER ROAD, MIDRAND, 1685\u003Cbr>+27 11 043 1307\u003Cbr>[technical@projectneers.com](technical@projectneers.com)[ ](technical@projectneers.com)[www.projectneers.com](www.projectneers.com)\u003Cbr>DRAWING CHECKS |  |  |  |  |\n|  |  |  |  |  | DESIGNED BY  DESIGN CHECKED BY\u003Cbr>N. K. MPOFU B.TSHUMA\u003Cbr>DRAWN BY\u003Cbr>DRAWING CHECKED BY\u003Cbr>S. ZUNGU J. DAVIDSON\u003Cbr>APPROVAL CONSULTANT |  |  |  |  |\n|  |  |  |  |  | N. K. MPOFU |  |  |  |  |\n|  |  |  |  |  | DATE\u003Cbr>2018-12-21\u003Cbr>PROF . REG . NO .\u003Cbr>24750099\u003Cbr>THE MASTER HELD ATTHE PROJECTNEERS CONSULTING MIDRAND OFFICE BEARS THE ORIGINAL SIGNATURE OF APPROVAL\u003Cbr>PROJECT NAME |  |  |  |  |\n|  |  |  |  |  | ASSESSMENT, DESIGN & PROJECT MANAGEMENT OF REQUIRED NEW BUILDINGS & REPAIRS, RENOVATIONS & UPGRADES TO VARIOUS INFRASTRUCTURE ASSETS IN THE THOHOYANDOU BOTANICAL GARDEN, THOHOYANDOU, & NATIONAL ZOOLOGICAL GARDEN CAMPUSES BASED IN PRETORIA & MOKOPANE\u003Cbr>SITE |  |  |  |  |\n|  |  |  |  |  | THOHOYANDOU BOTANICAL GARDENS\u003Cbr>SHEET TITLE |  |  |  |  |\n|  |  |  |  |  | RENOVATIONS ELEVATIONS\u003Cbr>DISCIPLINE |  |  |  |  |\n|  |  |  |  |  | ARCHITECTURAL\u003Cbr>CONTRACT NUMBER |  |  |  |  |\n|  | \u003Cbr>ISSUED FOR TENDER |  |  |  | G306/2018\u003Cbr>FILE NUMBER |  |  |  |  |\n|  |  |  |  |  | ZA2018_2008\u003Cbr>DRAWING NUMBER |  |  |  |  |\n|  |  |  |  |  | ORG  STATE  YEAR  PROJ . NO .  CLIENT  SITE  ROLE  SERIAL NO .  REV\u003Cbr>PJN_ZA_2022_2002_SANBI_TBG_ARC_20010 |  |  | SHEET SIZE\u003Cbr>A0 |  |\n|  |  |  |  |  |  |  |  |  |  |\n\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n|  | STOEP\u003Cbr>A |  |  |  |  | OUT\u003Cbr>SLIDING GATE\u003Cbr>IN | |  |  |  |  |  | NOTES |  |  |  |  |\n|  | Wc |  |  | GUARD ROOM |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  | Whb\u003Cbr>Exist Plan Scale 1:100 |  |  |  |  A \u003Cbr>|  |  |  |  |  |  |  |  |  |  |  |  |\n|  | DOOR SCHEDULES |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  | KEY |  | |  |  |  |  | DOOR DRAWING TTL FRAME GLAZING/ FINISH NOTES IRON\u003Cbr>MONGERY D01 \u003Cbr>2 100 1 Steel Frame Solid Timber Doors external quality Steel bed fixing. Union Chubb universal lockset Iron mongery by specialist D02 \u003Cbr>2 100 1 Steel Frame Semi Solid Timber Doors internal quality Steel bed fixing. Union Chubb universal lockset Iron mongery by specialist |  |  |  |  |  |  |  |  |  |\n|  | \u003Cbr>\u003Cbr>\u003Cbr>| -Remove 2.1m ","cbCaif2eXz9xPhS5","https://ap.wps.com/l/cbCaif2eXz9xPhS5","pdf",9443429,"English","# Renovations Elevations\n## North, South and West Elevations\n## Fence and Pedestrian Gate Notes\n# Door Schedules\n## Key, Drawings and Ironmongery Notes\n# Demolition Plan\n## Scale 1:100 Demolition Items","[{\"question\":\"What renovations are specified in the elevations drawings?\",\"answer\":\"The elevations call for a new Harvey tile roof, plaster repair and repainting, and preparation such as cleaning contaminants and sealing stonework with a stone sealer liquid.\"},{\"question\":\"What details are included for the gate and fencing elements?\",\"answer\":\"The drawings include a Clear Vu fence and notes for a pedestrian gate, including installation on existing dwarf wall height and associated gate/fence arrangements.\"},{\"question\":\"What information is provided in the door schedules and demolition plan?\",\"answer\":\"The document provides a door schedule with key, frame and glazing/finish notes plus ironmongery details, and a demolition plan listing items to remove and replace such as door frames, tiles, timber windows, ceilings, and security fence elements.\"}]","Architectural Drawings 1 of 3 - Renovations Elevations | PDF",1792805206,76]