[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-664860-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-664860-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","architectural-demolition-plans-addendum-4","ARCHITECTURAL DEMOLITION PLANS - Addendum 4","","Architectural demolition plan drawings for the WSU-DETROITUGL-W360 Academic Engagement Hub (Detroit, MI). The set includes addendum revisions (ADDENDUM #1, #4) dated 09.15.23, 09.28.23, and 10.11.23, prepared under issued-for-bids status. Notes specify contractor responsibilities for painting and patching damaged walls and ceilings in existing areas, general precautions to minimize disruption, coordination of demolition impacts with the owner, surface preparation for new work, and demolition plan-level requirements for stability and temporary bracing. Intellectual property rights and reproduction restrictions are stated by Stucky Vitale Architects.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/architectural-demolition-plans-addendum-4/664860/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/architectural-demolition-plans-addendum-4/664860.png","ImageObject",300,407,{"name":42,"@type":43},"dbqoiu","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":52,"interactionType":53,"userInteractionCount":33},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What does the contractor note require regarding damaged existing areas?","Question",{"text":62,"@type":63},"The contractor is responsible for painting and patching walls and ceilings in existing areas within the scope of work that are damaged.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"How should demolition activities be coordinated to minimize building impact?",{"text":67,"@type":63},"Demolition work must be coordinated with the owner to ensure impacts on the balance of the building are held to a minimum.",{"name":69,"@type":60,"acceptedAnswer":70},"What are the plan-level requirements for stability during demolition?",{"text":71,"@type":63},"The contractor shall design, provide, install, and maintain temporary bracing and an architectural demolition plan-level setup required to ensure the stability of the building assembly and related systems until they are complete and self-supporting.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},664860,1793276545,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":33,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":33,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":79,"read_time":123},3985747862462,"https://ap-avatar.wpscdn.com/davatar_3d24733baf745e90a7e4bdd5f77d97b2","|  | \u003Cbr>\u003Cbr>12  ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~   ~~ ~~ ~~ ~~ ~~ ~~\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>14  ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~   ~~ ~~ ~~ ~~ ~~ ~~\u003Cbr>\u003Cbr>\u003Cbr>16  ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~  ~~ ~~ ~~ ~~ ~~ ~~   ~~ ~~ ~~ ~~ ~~ ~~\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>NOTE:\u003Cbr>\u003Cbr>CONTRACTOR RESPONSIBLE FOR PAINTING AND PATCHING WALLS\u003Cbr>AND CEILINGS IN EXISTING AREAS WITHIN SCOPE OF WORK THAT ARE\u003Cbr>\u003Cbr>DAMAGED.\u003Cbr>\u003Cbr>DEMO 2 HOUR FIRE SEPARATION\u003Cbr>DEMO 3 HOUR FIRE SEPARATION DEMO METAL STUD PARTITION\u003Cbr>DEMO CMU PARTITION DEMO CONCRETE WALL\u003Cbr>DEMO DOOR\u003Cbr>11. GENERAL PRECAUTIONS SHALL BE TAKEN AS NECESSARY TO HOLD ALL DISRUPTION, DUST, DIRT, NOISE, AND DEBRIS TO A MINIMUM.\u003Cbr>12. THE CONTRACTOR SHALL COORDINATE DEMOLITION WORK WITH OWNER TO ENSURE THAT IMPACTS ON THE BALANCE OF THE BUILDING ARE HELD TO A MINIMUM.\u003Cbr>13. PREPARE ALL SURFACES TO RECEIVE THE NEW WORK AND FINISHES OF THE CONTRACT.\u003Cbr>14. THE CONTRACTOR SHALL DESIGN, PROVIDE, INSTALL AND MAINTAIN ANY\u003Cbr>\u003Cbr> 1 ARCHITECTURAL DEMOLITION PLAN-LEVEL 1  AD100 1/8\" = 1'-0\"\u003Cbr>\u003Cbr>AND ALL TEMPORARY BRACING AS REQUIRED TO ENSURE THE STABILITY OF THE BUILDING ASSEMBLY AND/OR ANY SYSTEMS AND/OR SUBASSEMBLIES AND/OR SYSTEMS APPURTENANT THERETO UNTIL SAID ASSEMBLY AND/OR SUB-ASSSEMBLIES ARE COMPLETE, SELF-SUPPORTING AND/OR STABLE. | DO NOT SCA LE DRAWINGS | © 2022 S tuck y V i ta le Architects | \u003Cbr>STUCKY VITALE ARCHITECTS 27172 WOODWARD AVENUE ROYAL OAK, MI 48067-0925 P. 248.546.6700\u003Cbr>F. 248.546.8454 WWW.STUCKYVITALE.COM STATEMENT OF INTELLECTUAL PROPERTY:\u003Cbr>THE IDEAS, CONCEPTS, DRAWINGS AND THOUGHTS CONVEYED HEREIN ARE THE INTELLECTUAL PROPERTY OF STUCKY VITALE ARCHITECTS. THIS SET OF DRAWINGS, IN WHOLE OR IN PART, MAY NOT BE REPRODUCED, WITHOUT THE WRITTEN CONSENT OF STUCKY VITALE ARCHITECTS. THIS INFORMATION IS PROTECTED UNDER U.S. COPYRIGHT LAW, ALL RIGHTS RESERVED\u003Cbr>Consultants\u003Cbr>Seal: Project : WSU-DETROITUGL-W360 ACADEMIC ENGAGEMENT HUB\u003Cbr>5155 GULLEN MALL DETROIT, MI 48202\u003Cbr>Key Plan: Issued for |  |\n| --- | --- | --- | --- | --- | --- |\n|  |  |  |  | BIDS\u003Cbr>ADDENDUM \\#1\u003Cbr>ADDENDUM \\#4 | 09.15.23\u003Cbr>09.28.23 10.11.23 |\n|  |  |  |  | Drawn by :\u003Cbr>JML,CRB\u003Cbr>Checked by :\u003Cbr>ARR\u003Cbr>Sheet Title :\u003Cbr>ARCHITECTURAL DEMOLITION PLANS\u003Cbr>|  |","cbCaiaLITbiAhA1i","https://ap.wps.com/l/cbCaiaLITbiAhA1i","pdf",3256081,"English","# Notes and Contractor Responsibilities\n## General Precautions and Coordination\n## Surface Preparation and Stability Requirements\n# Document Information","[{\"question\":\"What does the contractor note require regarding damaged existing areas?\",\"answer\":\"The contractor is responsible for painting and patching walls and ceilings in existing areas within the scope of work that are damaged.\"},{\"question\":\"How should demolition activities be coordinated to minimize building impact?\",\"answer\":\"Demolition work must be coordinated with the owner to ensure impacts on the balance of the building are held to a minimum.\"},{\"question\":\"What are the plan-level requirements for stability during demolition?\",\"answer\":\"The contractor shall design, provide, install, and maintain temporary bracing and an architectural demolition plan-level setup required to ensure the stability of the building assembly and related systems until they are complete and self-supporting.\"}]","ARCHITECTURAL DEMOLITION PLANS - Addendum 4 | PDF"]