[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-649403-105":59,"doc-detail-649403-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","application-for-construction-of-onshore-heliport-rev-3-application-form","Application for Construction of Onshore Heliport - Rev. 3 - Application Form","","Application form for notifying and applying to the QCAA for construction of an onshore heliport, including requirements for purpose, heliport type and key heliport data. It collects details such as intended use (international or domestic public/private), construction start and completion dates, municipality location, proposed heliport name, reference-point coordinates, elevation, and dimensions of FATO, TLOF, and safety areas. It also requests operational data (design helicopter, landing frequency, performance class, day/night use, IFR anticipation) and supporting documents for both surface-level and elevated heliports, ending with a declaration, signature, contact, and date.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/application-for-construction-of-onshore-heliport-rev-3-application-form/649403/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/application-for-construction-of-onshore-heliport-rev-3-application-form/649403.png","ImageObject",300,407,{"name":92,"@type":93},"Aurelia","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-23",true,{"@type":102,"interactionType":103,"userInteractionCount":8},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What notification timing is required before heliport construction or status changes?","Question",{"text":112,"@type":113},"Notify the QCAA at least 90 days before any construction, alteration, activation, deactivation, or change to the status or use of a civil heliport.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What key heliport location and geometry details must be provided?",{"text":117,"@type":113},"Provide the associated municipality, the proposed heliport name, WGS-84 coordinates of the heliport reference point, elevation (QND), and dimensions for FATO, TLOF, and the safety area.",{"name":119,"@type":110,"acceptedAnswer":120},"How are use type and operational expectations specified in the form?",{"text":121,"@type":113},"Select the type of use as International, Domestic Public-use, or Domestic Private-use, and provide operational data such as design helicopter characteristics, performance class (PC1/PC2/PC3), day/night use, and whether IFR procedures are anticipated.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},649403,1792799672,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":8,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":14,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":24},1099514068365,"https://ap-avatar.wpscdn.com/avatar/10000253d8d9f28188e?_k=1776742907772140068","| Individual or Organization Filling this Form (Name, Postal Address & Location Address) |  |  | Heliport Owner (Name, Postal Address & Location Address) |  |  |\n| --- | --- | --- | --- | --- | --- |\n| A. Purpose |  |  |  |  |  |\n| 1. Type of Use\u003Cbr>⃞ International ⃞ Domestic Public-Use ⃞ Domestic Private-Use |  |  | 2. Construction Start Date |  |  |\n|  |  |  | 3. Estimated Construction Completion Date |  |  |\n| B. Heliport Data |  |  |  |  |  |\n| 1. Associated Municipality (Physical Location of Heliport) |  |  |  |  |  |\n| 2. Name of Proposed Heliport |  |  |  |  |  |\n| 3. Coordinates of the Heliport Reference Point (DD MM SS.SS) |  |  | Latitude : ° ’ ” N\u003Cbr>Longitude: ° ’ ” E |  |  |\n| 4. Elevation (QND) |  |  |  |  |  |\n| 5. Heliport Type |  |  | ⃞ Surface level heliport ⃞ Elevated heliport |  |  |\n| 6. Dimensions of Final Approach and Take off Area (FATO) in metres |  |  |  |  |  |\n| 7. Dimensions of Touchdown and Lift-Off Area (TLOF) in metres |  |  |  |  |  |\n| 8. Dimensions of Safety Area |  |  |  |  |  |\n| 9. Direction of Prevailing Wind |  |  |  |  |  |\n| 10. Orientation of approach and departure paths (Approach and Take-off climb surface) |  |  |  |  |  |\n| 11. Maximum allowable take-off mass (kg) |  |  |  |  |  |\n| C. Operational Data |  |  |  |  |  |\n| 1. Design Helicopter | Largest Overall Dimension, D (m): |  | Rotor Diameter, RD (m): |  |  |\n|  | Undercarriage Width, UCW (m): |  | Maximum Take-off Mass (kg): |  |  |\n| 2. Average Monthly Landing of Helicopters |  |  |  |  |  |\n| 3. Performance Class of Operations |  | ⃞ PC1 ⃞ PC2 ⃞ PC3 |  |  |  |\n| 4. Times of Operations |  | ⃞ Day use only ⃞ Day and night use |  |  |  |\n| 5. Are IFR Procedures for The Heliport Anticipated? |  | ⃞ No ⃞ Yes\u003Cbr>If Yes; Within   years Navaid Type: |  |  |  |\n| D. Supporting Documents |  |  |  |  |  |\n| The following documents shall be attached to this application form:\u003Cbr>⃞ Heliport Project Exposition & Design Report ⃞ Heliport Layout Plan & Visual Aids Drawings ⃞ Heliport Airspace Drawing\u003Cbr>For elevated heliports, the following form shall also be attached to this application form:\u003Cbr>⃞ Completed QCAA Form QCAA.AGA. HP.002 (Attestation of Load Bearing Capacity for Elevated Heliport) |  |  |  |  |  |\n| E. Declaration |  |  |  |  |  |\n| I hereby certify that all of the above statements made by me are true and complete to the best of my knowledge. |  |  |  |  |  |\n| Name, title (and address if different than above) of person filing this notice (type or print) |  |  | Signature | Date of Signature |  |\n|  |  |  | Telephone No. | E-mail address: |  |\n\nINSTRUCTIONS FOR COMPLETING THE APPLICATION FORM  \nAs used herein, the term “Heliport” means Surface level heliport or Elevated heliport on land  \nIt is required for all persons to notify the QCAA at least 90 days before any construction, alteration, activation, deactivation, or change to the status or use of a civil heliport. It will take at least 30 working days to process the application, starting from the date of the receipt of complete and accurate information.  \nSection A-Purpose  \nITEM \\#1 . Check “International” if the heliport will be designated by the State for the arrival and departure of international air traffic where the formalities incident to customs, immigration, public health, quarantine (animal and plant) and similar procedures are carried out.  \nCheck “Domestic Public-use” if the heliport will be used by civil flights that originate or terminate within the State of Qatar and if it will be available on equal terms and conditions to all civil aviation users.  \nCheck “Domestic Private-use” if the heliport will be used by civil flights that originate or terminate within the State of Qatar and if it will be available only to persons authorised by the heliport owner.  \nITEM \\#2 Self-explanatory.  \nITEM \\#3 . Self-explanatory.  \nSection B-Heliport Data  \nITEM \\#1 . Self-explanatory.  \nITEM \\#2 . Name of the heliport could be changed during registration phase. At this stage, ","cbCaivdku4MHqh3c","https://ap.wps.com/l/cbCaivdku4MHqh3c","pdf",1951748,"English","# A. Purpose\n## 1. Type of Use\n## 2. Construction Start Date\n## 3. Estimated Construction Completion Date\n# B. Heliport Data\n## 1. Associated Municipality\n## 2. Name of Proposed Heliport\n## 3. Coordinates of the Heliport Reference Point\n## 4. Elevation (QND)\n## 5. Heliport Type\n## 6. Dimensions of FATO\n## 7. Dimensions of TLOF\n## 8. Dimensions of Safety Area\n## 9. Direction of Prevailing Wind\n## 10. Orientation of Approach and Departure Paths\n## 11. Maximum Allowable Take-off Mass\n# C. Operational Data\n## 1. Design Helicopter\n## 2. Average Monthly Landing of Helicopters\n## 3. Performance Class of Operations\n## 4. Times of Operations\n## 5. Are IFR Procedures Anticipated?\n# D. Supporting Documents\n# E. Declaration\n## Certification and Contact Details","[{\"question\":\"What notification timing is required before heliport construction or status changes?\",\"answer\":\"Notify the QCAA at least 90 days before any construction, alteration, activation, deactivation, or change to the status or use of a civil heliport.\"},{\"question\":\"What key heliport location and geometry details must be provided?\",\"answer\":\"Provide the associated municipality, the proposed heliport name, WGS-84 coordinates of the heliport reference point, elevation (QND), and dimensions for FATO, TLOF, and the safety area.\"},{\"question\":\"How are use type and operational expectations specified in the form?\",\"answer\":\"Select the type of use as International, Domestic Public-use, or Domestic Private-use, and provide operational data such as design helicopter characteristics, performance class (PC1/PC2/PC3), day/night use, and whether IFR procedures are anticipated.\"}]","Application for Construction of Onshore Heliport - Rev. 3 - Application Form | PDF"]