[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-664023-105":59,"doc-detail-664023-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","appendix-e-boq-20230810-bills-of-quantities-electrical-installation","Appendix E - BOQ 2023.08.10 - Bills of Quantities Electrical Installation","","Bills of Quantities for Electrical Installation detailing compliance and provisional allowances for nominated subcontract requirements, principal contract extracts, contract conditions compliance, performance surety and insurance coverage, site establishment, transport and off-loading of materials and personnel, and enumerated incidental costs including insurance, workman compensation, safety induction and equipment management, consumables, and training of local residents. Further items cover guarantee and maintenance periods, commissioning and testing, submission and approval of drawings and shop drawings, compilation of as-built drawings, sample approvals, and other necessary works to complete and hand over electrical installation in line with drawings, specifications and relevant codes.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/appendix-e-boq-20230810-bills-of-quantities-electrical-installation/664023/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/appendix-e-boq-20230810-bills-of-quantities-electrical-installation/664023.png","ImageObject",300,407,{"name":92,"@type":93},"Noah","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":102,"interactionType":103,"userInteractionCount":24},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What compliance and provisional allowances are included in the BOQ electrical installation?","Question",{"text":112,"@type":113},"The BOQ includes compliance with nominated/selected subcontract agreements, allowances for principal contract preliminaries, net price compliance with contract conditions and specifications, surety and insurance provisions, site establishment, transport, and incidental costs such as insurance, workman compensation, safety requirements, equipment management, consumables, and local resident training.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How long are the guarantee and maintenance periods for the electrical works?",{"text":117,"@type":113},"The document states a 12-month guarantee period for electrical works performed and equipment installed, and a 12-month maintenance period for defects in equipment, material, workmanship, wear and tear, plus normal maintenance. LED guarantees are required to be at least 5 years.",{"name":119,"@type":110,"acceptedAnswer":120},"What drawings, testing, and documentation tasks are required before handover?",{"text":121,"@type":113},"Contractor tasks include supplying test equipment and labour for commissioning and adjustment, submitting shop drawings for engineer approval before installation, and compiling as-built drawings for the complete electrical installation and existing site services. Samples must be approved before any equipment is paid.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},664023,1793236689,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":24,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":52,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":143},8796095462418,"https://ap-avatar.wpscdn.com/avatar/80000253c1241d02b47?x-image-process=image/resize,m_fixed,w_180,h_180&k=1778826106357471780","Bills of Quantities Electrical Installation  \n\n| Item | Description | Unit | Qty | Rate | Cost |\n| --- | --- | --- | --- | --- | --- |\n| 1 | Bill No. 1\u003Cbr>Compliance for electrical installation\u003Cbr>NOMINATED/SELECTED SUBCONTRACT AGREEMENT Compliance with Nominated/Selected Subcontract Agreement, JBCC | Sum | 1 |  |  |\n| 2 | EXTRACTS FROM THE PRINCIPAL CONTRACTOR Allowance for any costs associated with the requirements of the Principal Contract preliminaries which may affect the selected sub-contract. | Sum | 1 |  |  |\n| 3 | COMPLIANCE WITH CONDITIONS\u003Cbr>Nett price for compliance with the Conditions of Contract, the Special Conditions of Contract, and various specifications, which costs are not specifically covered elsewhere or by unit rates | Sum | 1 |  |  |\n| 4 | SURETY\u003Cbr>Allow for the provision of a performance guarantee for the contract value-refer to the main contract preliminaries attached thereof. Allow cover insurance for all equipment that are on site | Sum | 1 |  |  |\n| 5 | SITE ESTABLISHMENT\u003Cbr>Allow for the electrical site establishment, all associated services and for storage of plants, materials and equipment including protection and security. | Sum | 1 |  |  |\n| 6 | TRANSPORT\u003Cbr>Provide and arrange for transport and off loading of all electrical material and equipment to site as well as workmen and staff | Sum | 1 |  |  |\n| 7 | Allow for all incidental costs uniquely attached to the execution of the electrical works but not measured separately:\u003Cbr>Insurance Workman's Compensation\u003Cbr>Safety ( Induction) & Safety Requirements Personnel Protection Equipment Management, Tools & Consumables Value-adjustable Items\u003Cbr>Time-adjustable Items\u003Cbr>Training of local residents re: electrical installation, etc. | Item\u003Cbr>Item\u003Cbr>Item\u003Cbr>Item\u003Cbr>Item\u003Cbr>Item\u003Cbr>Item | 1\u003Cbr>1 1\u003Cbr>1 1\u003Cbr>1 1 |  |  |\n| TOTAL CARRIED FORWARD |  |  |  |  |  |\n\nBill No. 01 Compliance Page 1 of 10  \nBills of Quantities Electrical Installation  \n\n| Item | Description | Unit | Qty | Rate |  |\n| --- | --- | --- | --- | --- | --- |\n| TOTAL BROUGHT FORWARD |  |  |  |  |  |\n| 8 | GUARANTEE PERIOD\u003Cbr>Allow for the guarantee for a period of 12 months for all the electrical works that has been performed on the site and all equipment that has been installed. All the LED Guarantees shall be at least 5 years and the supplier must give us proof of after sales and track records. The guarantees will start from the day of practical handover to the client. | Sum | 1 |  |  |\n| 9 | MAINTENANCE\u003Cbr>Allow for a maintenance period of 12 months for defects in equipment, material, workmanship, wear and tear, and normal maintenance for all the electrical works. Maintenance will start/commence from the day of practical handover to the client. | Sum | 1 |  |  |\n| 10 | COMMISSIONING AND TESTING\u003Cbr>Supply all test equipment and labour for testing, commissioning and adjustment for all the sections of the installation. | Sum | 1 |  |  |\n| 11 | DRAWINGS & SHOP DRAWINGS\u003Cbr>Prior to the contractor starting any installation they will first submit shop drawing for the engineer to approve. Making reference, to other relevant drawings e.g. Civil, Structural, Architectural, existing services, etc. , and their after coordination of these services marking up for the engineer. | Sum | 1 |  |  |\n| 12 | AS BUILT DRAWINGS\u003Cbr>Compilation of as built drawings for the complete electrical installation and the existing services on site | Sum | 1 |  |  |\n| 13 | Samples\u003Cbr>The contractor to make allowance for all the samples of equipment to be used on site. No equipment on site will be paid without a sample approval for that particular equipment. | Sum | 1 |  |  |\n| 14 | OTHER NECESSARY WORKS\u003Cbr>All other works necessary to complete the installation in a satisfactory manner, and in accordance with the drawings, specification, SABS Code of Practice, the Local Authorities requirements, and to the Engineers satisfaction to include for items specified or shown but not itemised in this bill. e.g. stripping o","cbCaidqyVAvoHyij","https://ap.wps.com/l/cbCaidqyVAvoHyij","pdf",421034,"English","# Compliance and Provisional Allowances\n## Guarantee Period and Maintenance\n## Commissioning and Testing\n## Drawings and As-Built Drawings\n## Samples and Other Necessary Works\n# Reticulation and Distribution Boards\n## Cables and Cable Terminations","[{\"question\":\"What compliance and provisional allowances are included in the BOQ electrical installation?\",\"answer\":\"The BOQ includes compliance with nominated/selected subcontract agreements, allowances for principal contract preliminaries, net price compliance with contract conditions and specifications, surety and insurance provisions, site establishment, transport, and incidental costs such as insurance, workman compensation, safety requirements, equipment management, consumables, and local resident training.\"},{\"question\":\"How long are the guarantee and maintenance periods for the electrical works?\",\"answer\":\"The document states a 12-month guarantee period for electrical works performed and equipment installed, and a 12-month maintenance period for defects in equipment, material, workmanship, wear and tear, plus normal maintenance. LED guarantees are required to be at least 5 years.\"},{\"question\":\"What drawings, testing, and documentation tasks are required before handover?\",\"answer\":\"Contractor tasks include supplying test equipment and labour for commissioning and adjustment, submitting shop drawings for engineer approval before installation, and compiling as-built drawings for the complete electrical installation and existing site services. Samples must be approved before any equipment is paid.\"}]","Appendix E - BOQ 2023.08.10 - Bills of Quantities Electrical Installation | PDF",25]