[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-649516-105":59,"doc-detail-649516-en":129},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":122,"head_meta":124,"extra_data":126,"updated_unix":128},105,"en","appendix-d-building-permit-drawing-requirements","Appendix D - Building Permit Drawing Requirements","","Appendix D lists required drawings and supporting documents for different Ontario permit categories, including building permits for residential dwellings (such as detached, semi-detached, triplex, fourplex, townhouses, and duplexes), non-residential projects, alterations, additions, accessory buildings, basement renovations, and change-of-use permits. It also covers demolition permits with approvals, engineering review commitments, and utility clearances, plus pool, sign, and septic system permits. Tables specify site plans, grading plans, architectural and structural drawings, and discipline-specific drawings such as HVAC, plumbing, fire protection, and electrical.",{"@graph":69,"@context":121},[70,84,104],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/appendix-d-building-permit-drawing-requirements/649516/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":98,"encodingFormat":97,"isAccessibleForFree":99,"interactionStatistic":100},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/appendix-d-building-permit-drawing-requirements/649516.png","ImageObject",300,407,{"name":92,"@type":93},"gewufjwa","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-24",true,{"@type":101,"interactionType":102,"userInteractionCount":8},"InteractionCounter",{"@type":103},"ViewAction",{"@type":105,"mainEntity":106},"FAQPage",[107,113,117],{"name":108,"@type":109,"acceptedAnswer":110},"What documents are required for a residential building permit under Appendix D?","Question",{"text":111,"@type":112},"Residential permits require confirmation of compliance with applicable law, designer information, energy efficiency design summary, TARION registration (where applicable), and local approvals such as Town of LaSalle approval when on septic systems. Additional drawings include an approved site plan, approved lot grading plan by a professional engineer, architectural drawings, and structural drawings development approval including fees.","Answer",{"name":114,"@type":109,"acceptedAnswer":115},"Which drawings are listed for non-residential building permits that are new or additions?",{"text":116,"@type":112},"Non-residential new buildings and additions require confirmation of compliance with applicable law, commitments for general reviews by architects and engineers (for Part 3 buildings), energy efficiency design summary, Town of LaSalle approval when on septic tanks, other required authorities, and fire department approval. Required drawings include approved site plans and grading plans, architectural and structural drawings, plus HVAC, plumbing, fire protection, electrical drawings, and as-built drawings.",{"name":118,"@type":109,"acceptedAnswer":119},"What is required for a demolition permit according to Appendix D?",{"text":120,"@type":112},"Demolition permits require confirmation of compliance with applicable law, a commitment to general review by an engineer as required by code, a demolition control agreement when within a demolition control area, and required reports such as designated substance and method of demolition reports. Clearance from utilities including Union Gas, Essex Power, and other utilities is also required.","https://schema.org",{"og:url":83,"og:type":123,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":125,"canonical":83},"index,follow",{"doc_id":127,"site_id":62},649516,1792857783,{"code":4,"msg":5,"data":130},{"doc_id":127,"user_id":131,"nickname":92,"user_avatar":132,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":133,"file_id":134,"file_url":135,"file_type":136,"file_size":137,"view_count":8,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":44,"language":138,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":139,"faqs":140,"seo_title":141,"seo_description":67,"update_tm":142,"read_time":143},3985747882900,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","Appendix D  \n| Row | Class | Documents Required | Drawings Required |\n| --- | --- | --- | --- |\n| 1 | \u003Cbr>Building Permit\u003Cbr>Residential (Part 9 of Buildings)\u003Cbr>• Detached houses\u003Cbr>• Semi Detached houses\u003Cbr>• Triplexes\u003Cbr>• Fourplexes\u003Cbr>• Townhouses\u003Cbr>• Duplexes | a) Confirmation of compliance with applicable law;\u003Cbr>b) Designer Information For;\u003Cbr>c) Energy Efficiency Design Summary;\u003Cbr>d) TARION Registration form;\u003Cbr>e) Town of LaSalle approval (if on septic system); and, f) Others – Essex Region Conservation Authority,\u003Cbr>County roads, and/or Ministry of Transportation where applicable. | a) Approved Site Plan;\u003Cbr>b) Approved Lot Grading Plan (By a Professional Engineer);\u003Cbr>c) Architectural Drawings; and, d) Structural Drawings Development\u003Cbr>Approval including Fees. |\n| 2 | \u003Cbr>Building Permit\u003Cbr>Residential\u003Cbr>• Alterations\u003Cbr>• Additions\u003Cbr>• Accessory Buildings\u003Cbr>• Basement Renovations | a) Confirmation of compliance with applicable law; b) Town of LaSalle approval (if on septic system); and, c) Others – as per Row 1(e) and (f) . | a) Site Plan; b) Architectural Drawings; and c) Structural Drawings. |\n| 3 | \u003Cbr>Building Permit\u003Cbr>Non-Residential and other Residential not provided in Row 1 or 2\u003Cbr>• New Buildings\u003Cbr>• Additions | a) Confirmation of compliance with applicable law;\u003Cbr>b) Commitment to General Reviews by Architect and Engineers (Part 3 Buildings only);\u003Cbr>c) Energy Efficiency Design Summary;\u003Cbr>d) Town of LaSalle approval (if on septic tank);\u003Cbr>e) Other authorities as required; and,\u003Cbr>f) Fire Department approval. | a) Approved Site Plan;\u003Cbr>b) Approved Grading Plan;\u003Cbr>c) Architectural Drawings;\u003Cbr>d) Structural Drawings;\u003Cbr>e) HVAC Drawings;\u003Cbr>f) Plumbing Drawings;\u003Cbr>g) Fire Protection Drawings;\u003Cbr>h) Electrical Drawings; and, |\n\n\n| Row | Class | Documents Required | Drawings Required |\n| --- | --- | --- | --- |\n|  |  |  | i) As Built Drawings. |\n| 4 | \u003Cbr>Building Permit\u003Cbr>Non-Residential\u003Cbr>• Alterations\u003Cbr>• Renovations\u003Cbr>• Tenant Occupancies | a) Confirmation of compliance with applicable law; and,\u003Cbr>b) Commitment to General Reviews by Architect and Engineers (Part 3 Buildings Only) . | a) Location Plan;\u003Cbr>b) Architectural Drawings;\u003Cbr>c) Structural Drawings;\u003Cbr>d) HVAC Drawings;\u003Cbr>e) Plumbing Drawings;\u003Cbr>f) Electrical Drawings; and, g) Fire Protection Drawings. |\n| 5 | \u003Cbr>Building Permit\u003Cbr>• Other than Row 1 to 4 (designated structures under\u003Cbr>2.12 of the Ontario Building Code)\u003Cbr>• Change of use Permits | a) Confirmation of compliance with applicable law; and,\u003Cbr>b) Documents from Rows 1 to 4, or other documents which are applicable to the scope of work proposed. | a) Drawings from Rows 1 to 4 which are applicable to the scope of work proposed. |\n| 6 | \u003Cbr>Demolition Permit | a) Confirmation of compliance with applicable law;\u003Cbr>b) Commitment to General Review by Engineer as required by Code;\u003Cbr>c) Demolition Control Agreement (if demolition is in a Demolition Control Area);\u003Cbr>d) Designated Substance Report and Method of Demolition Report as required; and,\u003Cbr>e) Clearance from Union Gas, Essex Power and other utilities. |  |\n\n\n| Row | Class | Documents Required | Drawings Required |\n| --- | --- | --- | --- |\n| 7 | Pool Permit | a) Site plan; and, |  |\n|  |  | b) Grading Plan as required. |  |\n| 8 | \u003Cbr>Sign Permit | a) Drawing of size, location of sign. |  |\n| 9 | \u003Cbr>Septic System Permit | a) Confirmation of compliance with applicable law;\u003Cbr>b) System Design Calculations;\u003Cbr>c) Design Plans; and,\u003Cbr>d) Indemnity fee. |  |\n\n\n| Item | Drawing Type | Information Required | Class of Permit |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- |\n|  |  |  | PART A ROW NO. |  |  |  |\n|  |  |  | 1 | 2 | 3 | 4 |\n| 1 | Site Plan | a) Legal description, survey property lines, property dimensions, compass orientation, location, name of adjacent roads and easements; | X | X | X | X |\n|  |  | \u003Cbr>b) Outline of all existing and proposed buildings and structures, building dimensions and their di","cbCair4e5VSGOWh5","https://ap.wps.com/l/cbCair4e5VSGOWh5","pdf",541111,"English","# Appendix D\n## Building Permit - Residential (Part 9 of Buildings)\n## Building Permit - Residential Changes\n## Building Permit - Non-Residential and Other Residential\n## Building Permit - Non-Residential (Alterations, Renovations, Tenant Occupancies)\n## Building Permit - Other Designated Structures and Change of Use Permits\n## Demolition Permit\n## Pool, Sign, and Septic System Permits\n## Drawing Types - Information Required by Permit Class","[{\"question\":\"What documents are required for a residential building permit under Appendix D?\",\"answer\":\"Residential permits require confirmation of compliance with applicable law, designer information, energy efficiency design summary, TARION registration (where applicable), and local approvals such as Town of LaSalle approval when on septic systems. Additional drawings include an approved site plan, approved lot grading plan by a professional engineer, architectural drawings, and structural drawings development approval including fees.\"},{\"question\":\"Which drawings are listed for non-residential building permits that are new or additions?\",\"answer\":\"Non-residential new buildings and additions require confirmation of compliance with applicable law, commitments for general reviews by architects and engineers (for Part 3 buildings), energy efficiency design summary, Town of LaSalle approval when on septic tanks, other required authorities, and fire department approval. Required drawings include approved site plans and grading plans, architectural and structural drawings, plus HVAC, plumbing, fire protection, electrical drawings, and as-built drawings.\"},{\"question\":\"What is required for a demolition permit according to Appendix D?\",\"answer\":\"Demolition permits require confirmation of compliance with applicable law, a commitment to general review by an engineer as required by code, a demolition control agreement when within a demolition control area, and required reports such as designated substance and method of demolition reports. Clearance from utilities including Union Gas, Essex Power, and other utilities is also required.\"}]","Appendix D - Building Permit Drawing Requirements | PDF",1792801002,23]