[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-664638-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-664638-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","appendix-b-supply-of-as-constructed-deliverables","Appendix B - Supply of “As Constructed” Deliverables","","Port of Brisbane Pty Ltd requires reliable plan register and GIS records, and this appendix sets acceptable standards and formats for “As Constructed” deliverables. It specifies which works drawings and related coordination, demolition, and alteration drawings are included, how final versions must mark redlined changes, revisions, RFI/AsCon references, and detail callouts. It also defines CAD and GIS application delivery requirements, required external reference resources, GIS file handling, and survey control and datum specification.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/appendix-b-supply-of-as-constructed-deliverables/664638/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/appendix-b-supply-of-as-constructed-deliverables/664638.png","ImageObject",300,407,{"name":42,"@type":43},"RuangKosong","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":52,"interactionType":53,"userInteractionCount":33},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What is the purpose of Appendix B?","Question",{"text":62,"@type":63},"It outlines acceptable standards and formats for “As Constructed” deliverables and provides supplementary advice when not already stipulated in any agreed contract or development application.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"Which drawing types are included as “As Constructed” information?",{"text":67,"@type":63},"Included items cover works drawings/construction sets, services coordination drawings, and demolition and alterations drawings.",{"name":69,"@type":60,"acceptedAnswer":70},"How must “As Constructed” changes be presented on the final plans?",{"text":71,"@type":63},"“As Constructed” changes must be clearly marked in red and clouded, with the revision letter adjacent, and RFI/AsCon numbers displayed next to all changes; additional “Detail A” plans and correct revision status in the title bar are required.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},664638,1793264783,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":33,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":79,"read_time":144},962090883219,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","APPENDIX B  \nSUPPLY OF“AS CONSTRUCTED”  \nDELIVERABLES  \nEdited by: S.Crump Date: 3/05/2019 Revision: B  \nIntroduction  \nPort of Brisbane Pty Ltd (PBPL) has a responsibility to maintain reliable records for their plan register and Geographical Information System (GIS) . This document is an outline of the acceptable standards and formats of the “As Constructed” deliverables. It is to be used as supplementary advice where not already stipulated, in conjunction with any other agreed Contract or Development Application. For information regarding the supply of “As Constructed” data deliverables, please refer to the PBPLADAC standards document “Guidelines for creation and Submission of ADAC XML files”(Appendix Cof the Technical Guidelines)  \nContent of“As Constructed” Information  \nThe documents included, but not limited to, as “As Constructed” information are:  \n1. Works Drawings / Construction Sets;  \n2. Services Coordination drawings;  \n3. Demolition and alterations drawings  \nThe final “As Constructed” versions of these drawings will adhere to these guideline:  \n􀁸 “As Constructed” changes clearly marked in red and‘clouded’, with revision letter adjacent;  \n􀁸 Changes to design or construction as a result of an RFI or discussion to be clearly shown on the face of the plan. RFI numbers or AsCon number to be displayed next to all changes;  \n􀁸 Details to be shown at a larger scale on plan where necessary. If there is insufficient room on the plan, provide additional plans clearly labelled “Detail A”, with the same plan number (see Plan Numbering section);  \n􀁸 Revision status in the title bar shall indicate “As Constructed” issue, and contain the Certification of the Provider. All other references to plan status to be removed;  \n􀁸 All redline mark ups are to be executed in the native CAD file, where possible, and not as comments or edits in the PDF.  \nIf not already defined, details and/or supporting documentation relating to RFIs and AsCon numbers can be via an “As Constructed Register”. A sample of an “As Constructed Register” is shown in“Example A’. A sample of an anticipated final mark up Construction plan is shown in “Example B”. On projects where existing infrastructure and/or utilities are demolished, services realigned, upgraded, changed or abandoned, a detailed drawing (or series of drawings) should be produced to reflect these changes. These drawings will display enough information to identify their location on the Works site, and their relative position to existing services.  \nA plan showing “As Constructed” survey pickups shall also be provided, including horizontal and vertical datum used, date of survey and company/surveyor details. This is in addition to information covered by other plans. All information contained in the survey pickup needs to be detailed on one or more of the other “As Constructed” documents. Where ADAC information has been supplied, this plan(s) will be a representation of the extent of ADAC pickup. In this instance, labelling of content will not be required as it will already be provided as database attributes in the ADAC XML submission.  \nEdited by: S.Crump Date: 3/05/2019 Revision: B  \nDrafting  \nCAD Application  \nAll drawings are to be provided to PBPL in CAD format. These plans, where applicable, shall be on our standard drawing template (see Plan Template ) . Our in‐house CAD package is Bentley Microstation Connect edition( .dgn) . Files are to be provided in this format, or any other suitable CAD format, such as AutoCad ( .dwg) .  \nPlease ensure that all external reference files or images attached to the parent file are also provided. Any resource files such as custom line styles, font libraries, colour tables, ctb, cells, etc, will also need to be provided to ensure there is no loss of data in translation.  \nSeed files containing PBPL standards can be provided on request in Microstation dgn format.  \nGIS Application  \nThe GIS package we use is Bentley Map. It is compatible with other GIS packa","cbCaitYXXTjcrPVX","https://ap.wps.com/l/cbCaitYXXTjcrPVX","pdf",728761,14,"English","# Introduction\n# Content of “As Constructed” Information\n# Drafting\n# CAD Application\n# GIS Application\n# Survey Control and Datum\n# Plan Numbering","[{\"question\":\"What is the purpose of Appendix B?\",\"answer\":\"It outlines acceptable standards and formats for “As Constructed” deliverables and provides supplementary advice when not already stipulated in any agreed contract or development application.\"},{\"question\":\"Which drawing types are included as “As Constructed” information?\",\"answer\":\"Included items cover works drawings/construction sets, services coordination drawings, and demolition and alterations drawings.\"},{\"question\":\"How must “As Constructed” changes be presented on the final plans?\",\"answer\":\"“As Constructed” changes must be clearly marked in red and clouded, with the revision letter adjacent, and RFI/AsCon numbers displayed next to all changes; additional “Detail A” plans and correct revision status in the title bar are required.\"}]","Appendix B - Supply of “As Constructed” Deliverables | PDF",35]