[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-497036-105":59,"doc-detail-497036-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","appeal-for-shoemaker-donnelly-storage","Appeal for Shoemaker Donnelly Storage","","Legal appeal letter seeking review of a Valley County Planning and Zoning Commission denial of an extension for CUP 22-34. The applicant explains the project’s self-storage scope, key dates, and reasons the commission relied on, including lack of action, traffic impact study needs, and stormwater/drainage concerns. The letter argues significant progress, ongoing approvals and attachments, and that traffic study requirements have been addressed, requesting approval of the extension with updated evaluation and mitigation conditions.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/appeal-for-shoemaker-donnelly-storage/497036/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/appeal-for-shoemaker-donnelly-storage/497036.png","ImageObject",300,407,{"name":92,"@type":93},"LangkahRina","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-20","2026-10-02",true,{"@type":102,"interactionType":103,"userInteractionCount":29},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What decision is being appealed in this letter?","Question",{"text":112,"@type":113},"The letter appeals the denial by the Valley County Planning and Zoning Commission of an extension of CUP 22-34, following a public hearing held May 14, 2026.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What project is proposed as part of the CUP extension?",{"text":117,"@type":113},"The applicant proposes an 86,510 sf self-storage facility including RV and boat storage, covered parking, and mini storage, with phase one scheduled for ground breaking in June 2026.",{"name":119,"@type":110,"acceptedAnswer":120},"Why does the applicant say a traffic impact study (TIS) is not required as the commission concluded?",{"text":121,"@type":113},"The letter states the storage use generally does not meet criteria requiring a TIS, and that ITD required traffic-related statements and reports to evaluate the intersection, with updated information provided and further TIS work preliminarily not required.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},497036,1792176139,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":29,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145,"preview_page_count":146,"preview_urls":147},962090893776,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","\\#  \n200w.36th st,boise,idaho 83714·phone 208.475.3204·www.hatchda.com·email info@hatchda.com  \n# Appeal for Shoemaker Donnelly Storage\n\nMay 19,2026  \nValley County Board of County Commissioners219 North Main StreetPO Box 1350Cascade,ID 83611  \n1000.00 pe  \nRE:Appeal for Shoemaker Donnelly Storage13051 Old State Rd,Donnelly,ID 83615  \nDear Valley County Board of County Commissioners,  \nThank you for your consideration on this matter.Hatch Design Architecture(\"Applicant\")andShoemaker Propertied LLC,the property owner,are seeking an appeal of the Valley County Planningand Zoning Commission's(\"Commission\")decision regarding the extension of CUP 22-34(“Application”).On May 14,2026 the Commission held a public hearing,closed the record,and ultimately voted to denythe Application(\"Decision\").  \n## Project Description and Procedural History\n\nThe applicant is proposing a 86,510 sf self-storage facility(Project).The Project will consist of amix of RV and boat storage,covered parking,and mini storage.Phase one which includes Building C andCanopy D is scheduled to break ground in June of 2026.The remaining buildings are scheduled to startconstruction in the spring of 2028.Please see the site plan attached as Exhibit A.  \nOn December 8,2022 the Commission voted to approve CUP 22-34(CUP).Todd Jurdana filed anappeal of the Commission's decision on December 19,2022.On May 23,2023,the Valley County Boardof County Commissioners(Board)entered its Findings of Fact,Conclusions of Law,and Decisionapproving the Applicant's request for a CUP.  \nOn May 9,2024 the Commission approved a two-year extension of the CUP through May 23 of2026.  \n1  \n200 w.36th st,boise,idaho 83714·phone 208.475.3204·www.hatchda.com·email info@hatchda.com  \n## The Appeal\n\nIdaho State Law states the following:  \n“67-6521.Actions by affected persons.  \n(1)(a)As used herein,an affected person shall mean one having a bona fide interest in real propertywhich may be adversely affected by:  \n(i)The approval,denial orfailure to act upon an application for a subdivision,variance,special use permit and such other similar applications required or authorized pursuant to thischapter;\"  \nThe Commission denied the extension on the CUP based on the following criteria:  \n·  Lack of action  \n·  Need for a Traffic Impact Study(TIS)  \n·Stormwater and drainage concerns  \n·The application should meet the standards of the new Valley County Code andComprehensive Plan  \nBelow is an excerpt from Valley Code 9-5H-8.B.3:  \n\"With the extension,impacts can be reevaluated and mitigated with the addition of newconditions of approval.A progress report schedule shall be set,with milestones identified.Thecommission may choose not to approve an extension based upon their reevaluation of theproposed use and lack of activity to complete the project.\"  \nThis is a complex site involving multiple agencies.The additional time taken is to ensure thatground water levels will work with the Project.Also,additional data was needed to finalize the redesignof the Hwy55 and Old State Road intersection.  \nThe fact that the applicant has been diligently working with planning staff,Valley County RoadDept,Central District Health Department(CDHD),ITD,and the County's Engineer was not accounted dfor in the Decision.The County's third-party engineer(Parametrix)has recommended the grading anddrainage plans for approval.The Applicant is waiting for the development agreement(DA)to be drafted.The Project is scheduled to break ground on phase 1 once the DA has been recorded.  \n//  \n200w.36th st.,boise,idaho 83714·phone 208.475.3204·www.hatchda.com·email info@hatchda.com  \n## Reasons to approve this Appeal\n\n### 1.Significant Activity:\n\nSignificant activity has been made on the Project.The Project is a few weeks frombreaking ground on the on the horizontal work.Parametrix has recommended the gradingand drainage plans for approval.Please see the Approval Letter,dated May 4,2026attached as Exhibit B,Approved Grading and Drainage Plans atta","cbCaiflYOcjlkX1Q","https://ap.wps.com/l/cbCaiflYOcjlkX1Q","pdf",24592702,167,"English","# Project Description and Procedural History\n# The Appeal\n# Reasons to approve this Appeal\n## 1. Significant Activity:\n## 2. Need for a TIS:","[{\"question\":\"What decision is being appealed in this letter?\",\"answer\":\"The letter appeals the denial by the Valley County Planning and Zoning Commission of an extension of CUP 22-34, following a public hearing held May 14, 2026.\"},{\"question\":\"What project is proposed as part of the CUP extension?\",\"answer\":\"The applicant proposes an 86,510 sf self-storage facility including RV and boat storage, covered parking, and mini storage, with phase one scheduled for ground breaking in June 2026.\"},{\"question\":\"Why does the applicant say a traffic impact study (TIS) is not required as the commission concluded?\",\"answer\":\"The letter states the storage use generally does not meet criteria requiring a TIS, and that ITD required traffic-related statements and reports to evaluate the intersection, with updated information provided and further TIS work preliminarily not required.\"}]","Appeal for Shoemaker Donnelly Storage | PDF",1790946319,421,17,[148,152,156,160,164,168,172,176,180,184,188,193,198,203,207,212,217],{"page_no":8,"url":149,"width":150,"height":151},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/7fc8d259d68adde4ee161c0fecaef81b.webp",983,1272,{"page_no":14,"url":153,"width":154,"height":155},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/f7eafb6e75295972dd5ee2669b1c05f7.webp",982,1270,{"page_no":81,"url":157,"width":158,"height":159},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/8db25895a67ea571adc9e8a5e6be57a1.webp",981,1269,{"page_no":19,"url":161,"width":162,"height":163},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/1300272291c6d5ad6d58693b68244f5e.webp",980,1268,{"page_no":24,"url":165,"width":166,"height":167},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/3bc88f948fec17994fdcf8bb842cba26.webp",979,1255,{"page_no":29,"url":169,"width":170,"height":171},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/2bfdfd9cd5dc9cd69c4a76b3a04febeb.webp",978,755,{"page_no":34,"url":173,"width":174,"height":175},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/b72c0933ee5559a8fc956acbf60978fa.webp",977,1264,{"page_no":39,"url":177,"width":178,"height":179},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/07dd520aec7e32b33974e30b13f52204.webp",976,1252,{"page_no":44,"url":181,"width":182,"height":183},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/9ef3d24e6f8fab7ed5afef34e284c04f.webp",975,1250,{"page_no":52,"url":185,"width":186,"height":187},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/d3e1a62eea1cb70de9ccebd4ff4b926a.webp",974,752,{"page_no":189,"url":190,"width":191,"height":192},11,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/9b16654c824468ad79456bac5d58ac04.webp",973,1259,{"page_no":194,"url":195,"width":196,"height":197},12,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/30f3b566cf7146b6bcfb3c3ffa9ef978.webp",972,757,{"page_no":199,"url":200,"width":201,"height":202},13,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/9af3122028d6e6b95acb89e53eec4b57.webp",971,749,{"page_no":204,"url":205,"width":206,"height":202},14,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/65bba7f86ddf318fc9137069ce21025a.webp",970,{"page_no":208,"url":209,"width":210,"height":211},15,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/825e09cde7d268fa28e1e014e9ddf974.webp",969,748,{"page_no":213,"url":214,"width":215,"height":216},16,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/67a787f3eed8683aceea5aebf49d053b.webp",968,747,{"page_no":146,"url":218,"width":219,"height":220},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/37c30d2cf4ac39432b5279a9e24f2575.webp",967,1240]