[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-649679-105":59,"doc-detail-649679-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","annexure-ncross-section-drawings","ANNEXURE NCROSS SECTION DRAWINGS","","Annexure NCROSS SECTION DRAWINGS presents engineering cross-section drawing information for a transport infrastructure project. It includes document approval and amendment metadata, designer and checker sign-off fields, and project/client details for TENDELE COAL MINING in the Emalahleni mining areas. The drawings specify longitudinal section ranges and show measured elements such as peg distances, profiles, ground levels, and gradients with defined scales and sheet identification.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/annexure-ncross-section-drawings/649679/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/annexure-ncross-section-drawings/649679.png","ImageObject",300,407,{"name":92,"@type":93},"Mafia Boss","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-24",true,{"@type":102,"interactionType":103,"userInteractionCount":29},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What does this annexure contain?","Question",{"text":112,"@type":113},"It contains cross-section drawing details and longitudinal profile information for a transport engineering project, including measured sections and related parameters.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"Which approval and documentation metadata are shown?",{"text":117,"@type":113},"The page includes symbol, date, description, designer/checker information, and approval date, along with project and drawing identifiers such as drawing number and sheet number.",{"name":119,"@type":110,"acceptedAnswer":120},"What technical elements are included in the sections?",{"text":121,"@type":113},"The drawings list peg distances, profile values, ground levels, and gradients/slopes, typically tied to specified scales for the longitudinal alignment.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},649679,1792803660,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":29,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":129,"read_time":144},962090760730,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","# ANNEXURE NCROSS SECTION DRAWINGS\n\n\n|  |\n| --- |\n\n\n|  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- |\n|  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |\n| A   | 17-07-2023   | FORAPPROVAL-DOT   |  | JS   |  |  |  |\n| Symbol   | Date   | Description   |  | Checked   |  | Signed   |  |\n| AMENDMENTS   |  |  |  |  |  |  |  |\n| AS BUILD  \u003Cbr>Dale  \u003Cbr>SupevisngEgire  \u003Cbr>SupervsingAftorty   |  |  |  |  |  |  |  |\n| Designed By:   |  |  | J.Scaliet   |  |  |  |  |\n| Checked By:   |  |  | C.van Niekerk   |  |  |  |  |\n| Drawn By:   |  |  | H Lubbe   |  |  |  |  |\n| Checked By:   |  |  | J.Scallet   |  |  |  |  |\n| Date of Approval:   |  |  | 17-07-2023   |  |  |  |  |\n| Continued from:   |  |  |  |  |  |  |  |\n| Continued on:   |  |  |  |  |  |  |  |\n| Design Plan No:   |  |  |  |  |  |  |  |\n| Longitudinal Section No:   |  |  |  |  |  |  |  |\n| Survey Plan No:   |  |  |  |  |  |  |  |\n| Client:  \u003Cbr>TENDELE COAL MINING   |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |\n| Designed by:  \u003Cbr>AFRICA ENGINEERS  \u003Cbr>RICHARDS34Y OFFICE,  \u003Cbr>0′2-3621473  \u003Cbr>PRE ORIA  \u003Cbr>21 KRansh reer  \u003Cbr>PO Bax10812  \u003Cbr>Merensee 3901.  \u003Cbr>RIC-ADS AY  \u003Cbr>e~ail bay@l fa.biz  \u003Cbr>Aeb:wwilta.biz  \u003Cbr>CESA  \u003Cbr>DIRECTOR  \u003Cbr>DATE   |  |  |  |  |  |  |  |\n| transport  \u003Cbr>Department:  \u003Cbr>Transport  \u003Cbr>REPUSLIC OF SOUTH AFRICA   |  |  |  |  |  |  |  |\n| Transportation Engineering:Chief Engineer  \u003Cbr>Head:Transport   |  |  |  |  |  |  |  |\n| PROJECT:-  \u003Cbr>TENDELE COAL MINING  \u003Cbr>EMAHLALENI MINING AREAS  \u003Cbr>PROPOSED HAULAGE ROAD UPGRADE  \u003Cbr>TO EMAHLALENI PIT   |  |  |  |  |  |  |  |\n| DESCRIPTION:-  \u003Cbr>PROPOSED HAULAGE ROAD UPGRADE P495  \u003Cbr>(Km 28+500 to Km 30+950)  \u003Cbr>LONGITUDINAL   |  |  |  |  |  |  |  |\n| Project No  \u003Cbr>R23-019-00   |  | Drawing No.::  \u003Cbr>R23-019-00-CS-101   |  |  | Sheet:  \u003Cbr>10F1   |  |  |\n| Date:   |  | 17 NOVEMBER 2023   |  |  |  |  |  |\n| Scale:  \u003Cbr>1:250   |  | Plan No.:-C………   |  |  |  |  |  |\n\n\n| 13   | 0   |  | 1:1.50   | 4.00%   | -4.00%   | 1:1.50-   |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| 12   | 8   |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |\n| L  \u003Cbr>一  \u003Cbr>只  \u003Cbr>只  \u003Cbr>号  \u003Cbr>?  \u003Cbr>只  \u003Cbr>Peg Distance(m)28.960 Km   |  |  |  |  |  |  |  |  |  |\n| -670  \u003Cbr>763  \u003Cbr>570  \u003Cbr>吕   |  |  |  |  |  |  |  |  |  |\n| PROFILE  \u003Cbr>12985  \u003Cbr>12960  \u003Cbr>12905  \u003Cbr>12905  \u003Cbr>12905  \u003Cbr>12905  \u003Cbr>12968   |  |  |  |  |  |  |  |  |  |\n| 200  \u003Cbr>-1190  \u003Cbr>-1368  \u003Cbr>20.00  \u003Cbr>17.56  \u003Cbr>048  \u003Cbr>10.87  \u003Cbr>19.07  \u003Cbr>712  \u003Cbr>1687  \u003Cbr>-1892  \u003Cbr>8  \u003Cbr>030-  \u003Cbr>10.6   |  |  |  |  |  |  |  |  |  |\n| GROUND  \u003Cbr>12946  \u003Cbr>12804  \u003Cbr>12832  \u003Cbr>12935  \u003Cbr>12910  \u003Cbr>12960  \u003Cbr>12941  \u003Cbr>12963  \u003Cbr>12921  \u003Cbr>12811  \u003Cbr>12971  \u003Cbr>13027  \u003Cbr>13011  \u003Cbr>13035  \u003Cbr>128 24  \u003Cbr>129 37  \u003Cbr>129 33  \u003Cbr>13031   |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |\n| 132   |  |  |  |  |  |  |  |  |  |\n| 13   | 0   |  | 1:1.49   | 4.00%   | -4.00%   | 1:1.50   |  |  |  |\n| 12   | 8   |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |\n| L  \u003Cbr>只  \u003Cbr>只  \u003Cbr>号  \u003Cbr>只  \u003Cbr>?  \u003Cbr>Peg Distance(m)28.940 Km   |  |  |  |  |  |  |  |  |  |\n| 器  \u003Cbr>器  \u003Cbr>吕   |  |  |  |  |  |  |  |  |  |\n| PROFILE  \u003Cbr>3  \u003Cbr>13022  \u003Cbr>12942  \u003Cbr>12942  \u003Cbr>12942  \u003Cbr>12942  \u003Cbr>肥83   |  |  |  |  |  |  |  |  |  |\n| -1056  \u003Cbr>-1534  \u003Cbr>-087  \u003Cbr>19.23  \u003Cbr>0.59  \u003Cbr>10.55  \u003Cbr>012  \u003Cbr>20.00  \u003Cbr>948  \u003Cbr>足  \u003Cbr>0002  \u003Cbr>863-   |  |  |  |  |  |  |  |  |  |\n| GROUND  \u003Cbr>88  \u003Cbr>12919  \u003Cbr>12910  \u003Cbr>13022  \u003Cbr>13028  \u003Cbr>13030  \u003Cbr>12980  \u003Cbr>99 6Z  \u003Cbr>13099  \u003Cbr>13095  \u003Cbr>13128  \u003Cbr>12961  \u003Cbr>38   |  |  |  |  |  |  |  |  |  |\n\n| 12  \u003Cbr>12   | 8   |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n|  | 6   |  | 1:1.50   | -4.00%   | -4.00%   |","cbCaisedF4FA8YQc","https://ap.wps.com/l/cbCaisedF4FA8YQc","pdf",14327578,11,"English","# ANNEXURE NCROSS SECTION DRAWINGS","[{\"question\":\"What does this annexure contain?\",\"answer\":\"It contains cross-section drawing details and longitudinal profile information for a transport engineering project, including measured sections and related parameters.\"},{\"question\":\"Which approval and documentation metadata are shown?\",\"answer\":\"The page includes symbol, date, description, designer/checker information, and approval date, along with project and drawing identifiers such as drawing number and sheet number.\"},{\"question\":\"What technical elements are included in the sections?\",\"answer\":\"The drawings list peg distances, profile values, ground levels, and gradients/slopes, typically tied to specified scales for the longitudinal alignment.\"}]","ANNEXURE NCROSS SECTION DRAWINGS | PDF",28]