[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-664807-105":59,"doc-detail-664807-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","annex-b-drawings-frontback-view-3d-floor-plans","Annex B - Drawings - Front/Back View 3D & Floor Plans","","Annex B provides construction drawing sheets for an UNHCR Darfur operation container office at Al Matar area near Saudi Hospital in El-Fasher, North Darfur. The set includes ground floor plan and upper floor plan drawings as well as 3D views (back view and front view). Notes specify metric dimensions in millimeters, a do-not-scale rule with indicated dimensions, curing time for concrete, approval requirements for excavation prior to backfill, concrete encasement for waste water conduits, and antirust painting with smooth, well-filled weld joints.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/annex-b-drawings-frontback-view-3d-floor-plans/664807/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/annex-b-drawings-frontback-view-3d-floor-plans/664807.png","ImageObject",300,407,{"name":92,"@type":93},"Blitz","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":102,"interactionType":103,"userInteractionCount":24},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What are the document’s drawings for?","Question",{"text":112,"@type":113},"They are for the UNHCR Darfur operation container office at Al Matar area near Saudi Hospital in El-Fasher, North Darfur.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What do the notes require regarding dimensions?",{"text":117,"@type":113},"All dimensions are in millimeters, scaling is prohibited, and only the indicated dimensions should be used.",{"name":119,"@type":110,"acceptedAnswer":120},"What construction requirements are stated in the notes?",{"text":121,"@type":113},"Concrete must be cured for at least seven days; excavation must be approved before backfill; waste water conduits must be encased in concrete before backfill; metal surfaces must be painted with antirust paint and weld joints must be smooth and well filled.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},664807,1793273574,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":24,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":29,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":143},24464137899374,"https://us-avatar.wpscdn.com/davatar_3d24733baf745e90a7e4bdd5f77d97b2","ANNEX B: DRAWINGS  \n\n| 11,930\u003Cbr>1,027 1,200 1,734 1,200 839 839 1,200 1,734 1,200 1,027\u003Cbr>\u003Cbr>  2 ,470 \u003Cbr>| | ED-DAEN | | NOTES:\u003Cbr>1. All dimension in mm\u003Cbr>2. Do not scale. Use indicated dimensions\u003Cbr>3. All concrete works must be cured for a minimum of seven days\u003Cbr>4. Excavation works must be approved prior to backfill\u003Cbr>5. All waste water conduits must be encased in concrete before backfill\u003Cbr>6. All metal surfaces MUST be painted with antirust paint. Welding joints must be smooth and well filled\u003Cbr>\u003Cbr>UNHCR DARFUR OPERATION\u003Cbr>AL MATAR AREA\u003Cbr>NEAR SAUDI HOSPITAL\u003Cbr>EL-FASHER, NORTH DARFUR |  |\n| --- | --- | --- | --- | --- | --- |\n|  |  |  |  | CONTAINER OFFICE |  |\n|  |  |  |  | Drawing Name\u003Cbr>PLAN |  |\n|  |  |  |  | Drawing Status\u003Cbr>FOR TENDER |  |\n|  |  |  |  | Designed by\u003Cbr>GHM\u003Cbr>Checked by\u003Cbr>GHM | Date 28/11/2021\u003Cbr>Date |\n|  |  |  |  | Drawing Scale\u003Cbr>AS INDICATED |  |\n| GROUND FLOOR PLAN  UPPER FLOOR PLAN |  |  |  | PROJECT NO:\u003Cbr>ED-2021-008 | Revision |\n\n\n| EDDAEN\u003Cbr>\u003Cbr>PAGE 2/6 | NOTES:\u003Cbr>1. All dimension in mm\u003Cbr>2. Do not scale. Use indicated dimensions\u003Cbr>3. All concrete works must be cured for a minimum of seven days\u003Cbr>4. Excavation works must be approved prior to backfill\u003Cbr>5. All waste water conduits must be encased in concrete before backfill\u003Cbr>6. All metal surfaces MUST be painted with antirust paint. Welding joints must be smooth and well filled |  |\n| --- | --- | --- |\n|  | Revision History\u003Cbr>RevID ChID Change Name Date |  |\n|  | Company Title\u003Cbr>UNHCR DARFUR OPERATION\u003Cbr>AL MATAR AREA\u003Cbr>NEAR SAUDI HOSPITAL\u003Cbr>EL-FASHER, NORTH DARFUR\u003Cbr>CONTAINER OFFICE Drawing Name\u003Cbr>BACK VIEW 3D Drawing Status\u003Cbr>FOR TENDER Designed by\u003Cbr>GHM\u003Cbr>Checked by\u003Cbr>GHM\u003Cbr>28/11/2021\u003Cbr>Date Drawing Scale\u003Cbr>AS INDICATED\u003Cbr>|  |\n|  | PROJECT NO:\u003Cbr>ED-2021-007 | Revision |\n\n\n| ED-DAEN\u003Cbr>\u003Cbr>PAGE 3/6 | NOTES:\u003Cbr>1. All dimension in mm\u003Cbr>2. Do not scale. Use indicated dimensions\u003Cbr>3. All concrete works must be cured for a minimum of seven days\u003Cbr>4. Excavation works must be approved prior to backfill\u003Cbr>5. All waste water conduits must be encased in concrete before backfill\u003Cbr>6. All metal surfaces MUST be painted with antirust paint. Welding joints must be smooth and well filled\u003Cbr>Revision History\u003Cbr>RevID\u003Cbr>ChID\u003Cbr>Change Name\u003Cbr>Date Company Title UNHCR DARFUR OPERATION\u003Cbr>AL MATAR AREA\u003Cbr>NEAR SAUDI HOSPITAL\u003Cbr>EL-FASHER, NORTH DARFUR CONTAINER OFFICE Drawing Name\u003Cbr>BACK VIEW 3D Drawing Status\u003Cbr>FOR TENDER Designed by\u003Cbr>GHM\u003Cbr>Checked by\u003Cbr>GHM\u003Cbr>28/11/2021\u003Cbr>Date Drawing Scale\u003Cbr>AS INDICATED PROJECT NO:\u003Cbr>ED-2021-007 Revision |\n| --- | --- |\n\n\n| 11,930\u003Cbr>839 1,200 1 ,734 1,200 1,027\u003Cbr>6,000\u003Cbr>|  2,600  |  | \u003Cbr>\u003Cbr>1,734 1,200 1,027\u003Cbr>1,825\u003Cbr>11,930\u003Cbr>1,734 1,200 839 839 1,200\u003Cbr>Walkway\u003Cbr>2,219 1,825\u003Cbr>1,511\u003Cbr>1,027 1,200\u003Cbr>1,696\u003Cbr> 2,470  1,247 \u003Cbr>UPPER FLOOR PLAN\u003Cbr>PAGE 4/6 | NOTES:\u003Cbr>1. All dimension in mm\u003Cbr>2. Do not scale. Use indicated dimensions\u003Cbr>3. All concrete works must be cured for a minimum of seven days\u003Cbr>4. Excavation works must be approved prior to backfill\u003Cbr>5. All waste water conduits must be encased in concrete before backfill\u003Cbr>6. All metal surfaces MUST be painted with antirust paint. Welding joints must be smooth and well filled\u003Cbr>\u003Cbr>UNHCR DARFUR OPERATION\u003Cbr>AL MATAR AREA\u003Cbr>NEAR SAUDI HOSPITAL\u003Cbr>EL-FASHER, NORTH DARFUR |  |  |\n| --- | --- | --- | --- | --- | --- | --- |\n|  | | \u003Cbr>\u003Cbr>  1 , 825  \u003Cbr>|  |  |  |  |\n|  |  |  |  | CONTAINER OFFICE |  |  |\n|  |  |  |  | Drawing Name\u003Cbr>PLAN |  |  |\n|  |  |  |  | Drawing Status\u003Cbr>FOR TENDER |  |  |\n|  |  |  |  | Designed by\u003Cbr>GHM\u003Cbr>Checked by\u003Cbr>GHM | Date 28/11/2021\u003Cbr>Date |  |\n|  |  |  |  | Drawing Scale\u003Cbr>AS INDICATED |  |  |\n|  | \u003Cbr>GROUND FLOOR PLAN |  |  |  |  |  |\n|  |  |  |  | PROJECT NO:\u003Cbr>ZLG-2021-002 |  | Revision |\n\n\n| \u003Cbr>ZALINGEI\u003Cbr>PAGE 5/6 | NOTES:\u003Cbr>1. All dimension in mm\u003Cbr>2. Do not scale. Use indicated dimensions\u003Cbr>3. All concrete works must be cured for a minimum of se","cbCaienFd8XsrIst","https://ap.wps.com/l/cbCaienFd8XsrIst","pdf",730490,"English","# Notes\n## Drawings included\n### Ground floor plan\n### Upper floor plan\n### Back view 3D\n### Front view 3D\n## Project information\n### Project numbers and revisions","[{\"question\":\"What are the document’s drawings for?\",\"answer\":\"They are for the UNHCR Darfur operation container office at Al Matar area near Saudi Hospital in El-Fasher, North Darfur.\"},{\"question\":\"What do the notes require regarding dimensions?\",\"answer\":\"All dimensions are in millimeters, scaling is prohibited, and only the indicated dimensions should be used.\"},{\"question\":\"What construction requirements are stated in the notes?\",\"answer\":\"Concrete must be cured for at least seven days; excavation must be approved before backfill; waste water conduits must be encased in concrete before backfill; metal surfaces must be painted with antirust paint and weld joints must be smooth and well filled.\"}]","Annex B - Drawings - Front/Back View 3D & Floor Plans | PDF",15]