[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-664197-105":59,"doc-detail-664197-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","annex-b-building-plan-general-notes","Annex-B - Building Plan - General Notes","","Construction drawings package includes interior design scope and general notes for a building plan, covering submission requirements, design verification, and finishing/installation drawing coordination. It specifies standards such as do not scale drawings, provide finish samples and mock-ups, mount outlets and switches at defined heights, and ensure suspended ceiling or plasterboard wall elements have proper reinforcements. It also outlines waterproofing and flood-testing expectations, patching/repairing damaged surfaces, and coordination with MEPFS provisions for penetrations, ductwork, and acoustic sealing.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/annex-b-building-plan-general-notes/664197/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/annex-b-building-plan-general-notes/664197.png","ImageObject",300,407,{"name":92,"@type":93},"Oliver","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":102,"interactionType":103,"userInteractionCount":14},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What general rules apply to the construction drawings and approvals?","Question",{"text":112,"@type":113},"General notes require reading in conjunction with architectural drawings and specifications, submitting for verification and approval, and not scaling drawings. Approval of paint and final color options must be handled through designer pre-approval and on-site mock-ups.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What are the requirements for finish samples and mock-ups?",{"text":117,"@type":113},"Finish samples must be submitted for approval, and tile layouts require mock-up all tile layouts on site prior to final installation. Samples of all finishes, including multiple material categories, must be consolidated and submitted for designer approval.",{"name":119,"@type":110,"acceptedAnswer":120},"How are waterproofing and wet-area testing specified?",{"text":121,"@type":113},"For wet areas, existing structural slabs must be treated with membrane waterproofing (including described ply requirements) and undergo flood testing with a minimum 24-hour duration. A 5-year warranty submission is required from the lessee’s contractor to the lessor.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},664197,1793243883,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":129,"read_time":144},8796095461610,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","ONSTRUCTION DRAWINGs July25  \nр  \nр  \nD  \n\n| OULAS  \u003Cbr>UNIFED LEGALAID SERVICE   |  |  |  |  |  |  |  |  | тАвце оесомтентв   |  | ВориЬТс аГШе Рпйропеб  \u003Cbr>огесеогтне вицомо оггаа   |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n|  |  |  |  |  |  |  |  |  | D10.1 coVER PAGE  \u003Cbr>тоа аемеяацнотез,иесеноз,амо бумвоиб  \u003Cbr>D10.3 PESPECTVE-RECEPTIONANDBOARDRO0M  \u003Cbr>D10.4 PESPECTVE·GENERAL WDRKAREAS  \u003Cbr>отобреябрестмЕ-оемея мовк авеаба ехеситмЕ огпсея  \u003Cbr>реябрестуЕ»брроят брасеб  \u003Cbr>Таенеям нооя рглн  \u003Cbr>о томтияе рстияеб ано еоирмеч иАуоит  \u003Cbr>гозралттомано,онеяуиауоит  \u003Cbr>D20.4 WALLANDFLOOR FINISHES PLAN  \u003Cbr>205 POMERLAYOUT  \u003Cbr>аавпегестеоспино рилн  \u003Cbr>гал  зитснма иагаит  \u003Cbr>золпесєртом еєуатомз  \u003Cbr>рзозг бенеямг ояж аяеа егеуатюмз  \u003Cbr>оачогнсеоетнеабббтамтежеситуеогнсся еиеvапоns  \u003Cbr>шажоєнсєонтнеєхєситиє оннсєя єкуатомв  \u003Cbr>юта.воаярпоом есеуатонз  \u003Cbr>рга рамтвуееуатонв  \u003Cbr>рза  тоteт eеуатюонб   |  | овтясттстчмоуюрацту   |  |\n|  |  |  |  |  |  |  |  |  |  |  | нтенюя оезон   |  |\n|  |  |  |  |  |  |  |  |  |  |  | меснансаи   |  |\n|  |  |  |  |  |  |  |  |  |  |  | виестнсм   |  |\n| ЗИРВЕМЕ СОИВТ ИЦАЗ ОЕНГСЕ  \u003Cbr>12FNем!ВР Томег, Пойа Jula Varqas Avenue, Oriqas Center, Pasg Ctуy   |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  | ецестяомсв   |  |\n|  | ■  \u003Cbr>РвОлЕСТ ЗСОРЕ  \u003Cbr>□  \u003Cbr>□  \u003Cbr>口  \u003Cbr>BUILDING PLAN   |  |  |  |  | Qnm  \u003Cbr>旨Q2  \u003Cbr>эАхо  \u003Cbr>8mn18  \u003Cbr>rbD  \u003Cbr>9  \u003Cbr>mnruloAxEyov  \u003Cbr>BchengoR→  \u003Cbr>BrhDgRA  \u003Cbr>в:аспрово  \u003Cbr>%anmm  \u003Cbr>PaaD  \u003Cbr>МСІМТУ МАР   |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  | рцмвно   |  |\n|  |  |  |  |  |  |  |  |  |  |  | нве рвотеспом   |  |\n| espasio   |  | ID.Catenine icol .Pascual   | анытенояоебючелбнашемо  \u003Cbr>аовеслхночварулнеяоомме  \u003Cbr>ВА АВЗБО АлЬН Бвс гв   | оелели котез  \u003Cbr>ro   | ролвст  \u003Cbr>supreme couRTuLAs orriсе  \u003Cbr>INTERIOR DESIGN  \u003Cbr>12Р МеиТВР Тонег ОопаЛиКа Уагдав Аувпив Огдаз Септг,Разд Слу  \u003Cbr>241124   |  | онмксимт  \u003Cbr>Supreme Court of the Philippines  \u003Cbr>!2Г МенЛВР Тоне,ОопаЛийаУагдая Ауепие, Огйаз Сenмг,Раыд слу   | чееть,го  \u003Cbr>сонзтвистон оваилноз  \u003Cbr>PA SD 2:30   |  | ;ЯТёбРЄОятентв вЦцоЗрим усмтумар  \u003Cbr>Гечв  \u003Cbr>снегхер   |  | знеетмо  \u003Cbr>ID10.1   |\n\n| GENERAL NOTES  \u003Cbr>MUST BE READINCONJUNCTIONWITHARCHITECTURAL DRAWINGS AND SPECIFICATIONS,ID  \u003Cbr>SUBMITTALS  \u003Cbr>FINISHING&INSTALLATION  \u003Cbr>DRAWINGS AND SPECIFICATIONS,&MEPFS DRAWINGS AND SPECIFICATIONS (NOT PART OF  \u003Cbr>SHOP DRAWINGS.GENERAL CONTRACTOR AND FABRICATORS TO SUBMIT SHOP  \u003Cbr>GROUT/SEALANT-SUBMIT GROUT COLOR FOR APPROVAL.GROUT JOINTS TO ALWAYS BE  \u003Cbr>INTERIOR DESIGN SCOPE).  \u003Cbr>DRAWINGS FORVERIFICATIONAND APPROVAL OF DESIGNERS.  \u003Cbr>THE MNIMUM POSSIBLE AS ALLOWED BY THE MANUFACTURER.  \u003Cbr>DO NOT SCALE DRAWINGS.  \u003Cbr>SAMPLES.SUBMIT FINISH SAMPLES FOR APPROVAL.SUBMITTED SAMPLES MUST BE  \u003Cbr>TILING LAYOUT-MOCK-UP ALL TILE LAYOUTS ON SITE PRIOR TO FINALINSTALL.  \u003Cbr>REPRESENTATIVE OF THE WORKSMANSHIP AND FINISHES FOR ALL INTERIOR FINISHES  \u003Cbr>ALWAYS PRINTIN COLOR.  \u003Cbr>AND SHALL SERVE AS STANDARD.  \u003Cbr>ALL ELEMENTS NSTALLED IN SUSPENDED CEILINGS OR PLASTERBOARD WALLS MUST  \u003Cbr>BE PROVIDED WITHAPPROPRIATE REINFORCEMENTS.  \u003Cbr>AII 1NITSARF IN MM IDIMFNSIONS)OR DEGREES IANGLESI UNLESSOTHERWISE NOTED  \u003Cbr>1.APPROVAL OF PAINT:SUBMIT PAINT SAMPLES FOR PRE-APPROVAL BY THE DESIGNER.  \u003Cbr>ALL FINAL COLOR OPTIONS MUST BE MOCKED UP ON SITE AS 300X300MM SAMPLES  \u003Cbr>ALLOUTLETS TOBE MOUNTED ATA HEIGHT OF 300 mm FROM FFLO.C.  \u003Cbr>GFNFRAl CONTRACTDR AND FABRICATORS TO PROVIDE FLOOR PLAN AND FFE LINE  \u003Cbr>PAINTED ONTHE WALL.  \u003Cbr>MADKIMGS ON SITF PRIOR TOcoMMFNCEMENT OF CONSTRUCTIONAND PRODUCTION  \u003Cbr>ALL SWITCHES TO BE MOUNTED ATAHEIGHT OF 1200mm FROM FFLO.C.  \u003Cbr>2.FINISH SAMPLES:SAMPLES OF ALL IINISHES INCLUDING BUT NOT LIMITED TO  \u003Cbr>CrMcDM coMTQMCT09   典cONTRACT0RSNDSIPPIIERS TOFAM14RLZF THEMSELVE  \u003Cbr>ACRYLIC,GLASS,HPL,METAL,PLASTER,STONE,TILES,WOOD,MUST BE CONSOLIDATED  \u003Cbr>ALL PLASTERBOARD SUR","cbCaidkjbLvqEwJS","https://ap.wps.com/l/cbCaidkjbLvqEwJS","pdf",15819147,26,"English","# GENERAL NOTES\n## Submission, verification, and drawing rules\n## Finishing samples, mock-ups, and installation coordination\n## Waterproofing, flood testing, and MEPFS coordination","[{\"question\":\"What general rules apply to the construction drawings and approvals?\",\"answer\":\"General notes require reading in conjunction with architectural drawings and specifications, submitting for verification and approval, and not scaling drawings. Approval of paint and final color options must be handled through designer pre-approval and on-site mock-ups.\"},{\"question\":\"What are the requirements for finish samples and mock-ups?\",\"answer\":\"Finish samples must be submitted for approval, and tile layouts require mock-up all tile layouts on site prior to final installation. Samples of all finishes, including multiple material categories, must be consolidated and submitted for designer approval.\"},{\"question\":\"How are waterproofing and wet-area testing specified?\",\"answer\":\"For wet areas, existing structural slabs must be treated with membrane waterproofing (including described ply requirements) and undergo flood testing with a minimum 24-hour duration. A 5-year warranty submission is required from the lessee’s contractor to the lessor.\"}]","Annex-B - Building Plan - General Notes | PDF",66]