[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-662552-105":59,"doc-detail-662552-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","annalue-drive-and-east-university-drive-intersection-improvements-project-proposal-and-specifications","ANNALUE DRIVE AND EAST UNIVERSITY DRIVE INTERSECTION IMPROVEMENTS PROJECT - Proposal and Specifications","","Project manual for the Annalue Drive and East University Drive Intersection Improvements Project issued by the City of Auburn Engineering Services Department. Covers bidding invitations and bidder instructions, proposal bond and required contract performance bonds, labor and materials bond, and special conditions. Defines project description, time of completion, liquidated damages, license fee, scope of work, safety and environmental requirements, and a project progress schedule. Includes record documents guidance and a detailed measurement and payment schedule listing civil items such as conduits, pipe, meters, drainage, traffic control, excavation, and concrete and pavement components.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/annalue-drive-and-east-university-drive-intersection-improvements-project-proposal-and-specifications/662552/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/annalue-drive-and-east-university-drive-intersection-improvements-project-proposal-and-specifications/662552.png","ImageObject",300,407,{"name":92,"@type":93},"CatatanPagi","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":24},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What sections does the project manual include for bidding and contracting?","Question",{"text":112,"@type":113},"It includes an invitation to bid, instructions to bidders, proposal requirements, proposal bond, base bid/quantities, contract performance bond, labor and materials bond, and special conditions.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What major project requirements are defined in the manual?",{"text":117,"@type":113},"The manual defines the project description, time of completion, liquidated damages, license fee, scope of work, safety requirements, and environmental requirements.",{"name":119,"@type":110,"acceptedAnswer":120},"What does the manual provide for cost and payment planning?",{"text":121,"@type":113},"It provides a detailed measurement and payment schedule listing specific work items such as fiber conduit with junction boxes, reinforced pipe, water meter resets/sets, drainage elements, excavation, traffic control, and concrete or pavement components.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},662552,1793219915,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":24,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":129,"read_time":144},962090894170,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","Project Manual  \nANNALUE DRIVE AND EAST UNIVERSITY DRIVE  \nINTERSECTION IMPROVEMENTS PROJECT  \nProject Manager: Patrick Slaughter, 334.501.7390  \nCity of Auburn Engineering Services Department  \n161 North Ross Street Auburn, Alabama 36830  \nThis page was intentionally left blank.  \nANNALUE DRIVE AND EAST UNIVERSITY DRIVE INTERSECTION IMPROVEMENTS PROJECT  \nTABLE OF CONTENTS  \nINVITATION TO BID INSTRUCTIONS TO BIDDERS PROPOSAL  \nPROPOSAL BOND BASE BID/QUANTITIES CONTRACT PERFORMANCE BOND  \nLABOR AND MATERIALS BOND  \nSPECIAL CONDITIONS  \nPROJECT DESCRIPTION.................................................................................................................. 01  \nTIME OF COMPLETION .................................................................................................................. 02  \nLIQUIDATED DAMAGES................................................................................................................. 03  \nLICENSE FEE ................................................................................................................................... 04  \nWORK TO BE DONE ....................................................................................................................... 05  \nSAFETY........................................................................................................................................... 06  \nENVIRONMENTAL ......................................................................................................................... 07  \nPROJECT PROGRESS SCHEDULE .................................................................................................... 08  \nRECORD DOCUMENTS................................................................................................................... 09  \nMEASUREMENT & PAYMENT  \n1.25” FIBER CONDUIT WITH JUNCTION BOXES ............................................................................ 01  \n15\" SLOPE PAVED HEADWALL ON SKEW ...................................................................................... 02  \n15\" REINFORCED CONCRETE PIPE................................................................................................. 03  \n3/4 INCH WATER METER AND BOX RESET .................................................................................... 04  \n3/4 INCH WATER METER AND BOX SET ........................................................................................ 05  \nAREA INLET.................................................................................................................................... 06  \nBORROW EXCAVATION (APPROX. 410 C.Y.) ................................................................................. 07  \nBROKEN TEMPORARY TRAFFIC STRIPE (5\" WIDE) ........................................................................ 08  \nBROKEN WHITE, CLASS 2, TYPE A TRAFFIC STRIPE (5\" WIDE) ...................................................... 09  \nCHANNELIZING DRUMS ................................................................................................................ 10  \nCLEARING AND GRUBBING (MAX. ALLOWABLE BID $4000/ACRE) (APPROX. 2 ACRES) ............... 11  \nCOMBINATION CURB AND GUTTER .............................................................................................. 12  \nCONCRETE DRIVEWAY, 6\" THICK .................................................................................................. 13  \nCONCRETE FLUME, 6\" THICK......................................................................................................... 14  \nCONCRETE SIDEWALK, 4\" THICK ................................................................................................... 15  \nCONCRETE SIDEWALK, 6\" THICK ................................................................................................... 16  \nCONES (36 INCHES HIGH) .............................................................................................................. 17  \nC","cbCaidZBK1c3P1oi","https://ap.wps.com/l/cbCaidZBK1c3P1oi","pdf",12918381,114,"English","# Invitation to Bid\n# Instructions to Bidders\n# Proposal\n## Proposal Bond\n## Base Bid/Quantities\n## Contract Performance Bond\n## Labor and Materials Bond\n## Special Conditions\n# Project Description\n# Time of Completion\n# Liquidated Damages\n# License Fee\n# Work to Be Done\n# Safety\n# Environmental\n# Project Progress Schedule\n# Record Documents\n# Measurement & Payment\n## 1.25” Fiber Conduit with Junction Boxes\n## 15\" Slope Paved Headwall on Skew\n## 15\" Reinforced Concrete Pipe\n## 3/4 Inch Water Meter and Box Reset\n## Area Inlet\n## Borrow Excavation\n## Broken Temporary Traffic Stripe (5\" Wide)\n## Channelizing Drums\n## Clearing and Grubbing\n## Combination Curb and Gutter\n## Concrete Driveway, 6\" Thick\n## Concrete Flume, 6\" Thick\n## Concrete Sidewalk, 4\" Thick\n## Concrete Sidewalk, 6\" Thick\n## Cones (36 Inches High)\n## Construction Signs\n## Convert Existing Inlet to Junction Box\n## Crushed Aggregate Base Course, Type B\n## Engineering Controls\n## Intersection Signalization\n## Milling (1\" Thick)\n## Mobilization\n## Modular Block Retaining Wall\n## Pavement Markers, Class A-H\n## Permanent Road Signs with Posts","[{\"question\":\"What sections does the project manual include for bidding and contracting?\",\"answer\":\"It includes an invitation to bid, instructions to bidders, proposal requirements, proposal bond, base bid/quantities, contract performance bond, labor and materials bond, and special conditions.\"},{\"question\":\"What major project requirements are defined in the manual?\",\"answer\":\"The manual defines the project description, time of completion, liquidated damages, license fee, scope of work, safety requirements, and environmental requirements.\"},{\"question\":\"What does the manual provide for cost and payment planning?\",\"answer\":\"It provides a detailed measurement and payment schedule listing specific work items such as fiber conduit with junction boxes, reinforced pipe, water meter resets/sets, drainage elements, excavation, traffic control, and concrete or pavement components.\"}]","ANNALUE DRIVE AND EAST UNIVERSITY DRIVE INTERSECTION IMPROVEMENTS PROJECT - Proposal and Specifications | PDF",287]