[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-656554-105":59,"doc-detail-656554-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","airflow-riser-diagram-system-configuration","Airflow Riser Diagram - System Configuration","","This document provides a comprehensive technical riser diagram illustrating the airflow configuration across a four-story building structure. It details the vertical routing of supply and exhaust ducts across floors one through four, including specific room designations such as 201, 202, 301, 302, 401, and 402. The visual representation serves as a fundamental architectural and mechanical reference for the installation and monitoring of HVAC components. It integrates essential system components including 120VAC BMS monitoring panels, air accelerators, duct probes, and various specialized tubing and hose configurations, such as 1/4\" tubing, 1/2\" hose, and 2\" hose, alongside GEX ductwork. The diagram is designed for facility managers, HVAC engineers, and technical installers to ensure proper airflow management and system integration. By mapping the connectivity between environmental sensors and air handling equipment, it ensures that the building's ventilation system remains within defined operational parameters, enhancing overall climate control efficiency and air quality consistency throughout the entire building infrastructure.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/airflow-riser-diagram-system-configuration/656554/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/airflow-riser-diagram-system-configuration/656554.png","ImageObject",300,407,{"name":92,"@type":93},"dhado","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-31","2026-10-25",true,{"@type":102,"interactionType":103,"userInteractionCount":81},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What components are included in the monitoring system legend?","Question",{"text":112,"@type":113},"The legend includes a Monitoring Panel, Air Accelerator, Duct Probe, Faceplate, 1/4\" Tubing, 1/2\" Hose, 2\" Hose, and GEX Ductwork.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"Which floors are covered in the airflow riser diagram?",{"text":117,"@type":113},"The diagram covers the first, second, third, and fourth floors of the building.",{"name":119,"@type":110,"acceptedAnswer":120},"What is the power specification for the BMS mentioned in the document?",{"text":121,"@type":113},"The BMS system is specified to operate on 120VAC.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},656554,1792969225,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":81,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":81},5909893218464,"https://ap-avatar.wpscdn.com/davatar_085a072bc5b1113ac321206ff7593b45","Airflow that Makes Sense  \nRISER DIAGRAM  \n1st  \nFloor  \n2nd Floor  \nFloor  \n3rd  \n401  \n402  \n301  \n302  \n4th Floor  \n201  \n202  \nExhaust Duct  \nSupp ly Duct  \n120VAC BMS   \nLEGEND  \n: Monitoring Panel  \n: Air Accelerator  \n: Duct Probe  \n: Faceplate  \n: 1/4\" Tubing  \n: 1/2\" Hose  \n: 2\" Hose  \n: GEX Ductwork","cbCaiojR9JUSuiB7","https://ap.wps.com/l/cbCaiojR9JUSuiB7","pdf",312240,"English","# Riser Diagram Overview\n## System Components and Legend\n## Floor Distribution Details","[{\"question\":\"What components are included in the monitoring system legend?\",\"answer\":\"The legend includes a Monitoring Panel, Air Accelerator, Duct Probe, Faceplate, 1/4\\\" Tubing, 1/2\\\" Hose, 2\\\" Hose, and GEX Ductwork.\"},{\"question\":\"Which floors are covered in the airflow riser diagram?\",\"answer\":\"The diagram covers the first, second, third, and fourth floors of the building.\"},{\"question\":\"What is the power specification for the BMS mentioned in the document?\",\"answer\":\"The BMS system is specified to operate on 120VAC.\"}]","Airflow Riser Diagram - System Configuration | PDF"]