[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-648249-105":59,"doc-detail-648249-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","adu-detached-checklist-sb9-project-separate-planning-division","ADU Detached Checklist - SB9 Project Separate Planning Division","","Checklist outlining required submittal documents and content for ADU projects under SB9, covering separate planning division planning requirements for projects converting existing house/garage/interior space into a new ADU. Specifies correct SimpliCITY document types (plans, supporting documents, and other attachments) and the required plan sheets: title, site, floor, electrical, plumbing, mechanical, exterior elevations, construction notes, foundation, framing, energy calculations, and supporting structural/truss/grading and other reports. Includes mandatory elements for comprehensive title and site plans and multiple city acknowledgements and contact references.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":35,"@type":76,"position":81},"https://docshare.wps.com/document/healthcare/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/adu-detached-checklist-sb9-project-separate-planning-division/648249/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/adu-detached-checklist-sb9-project-separate-planning-division/648249.png","ImageObject",300,407,{"name":92,"@type":93},"River Wang","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-09","2026-10-23",true,{"@type":102,"interactionType":103,"userInteractionCount":24},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What document types must be used for SB9 ADU submissions in SimpliCITY?","Question",{"text":112,"@type":113},"Use Document Type = PLANS for required plan sheets, Document Type = SUPPORTING DOCUMENTS for calculations and reports, and Document Type = OTHER ATTACHMENTS for items like the city approved address letter and the completed checklist acknowledgement pages.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"Which plan sheets are required under Document Type = PLANS?",{"text":117,"@type":113},"The submission must include a Title Sheet, Site Plan, Floor Plan, Electrical Plan, Plumbing Plan, Mechanical Plan, Exterior Elevations, Construction Notes, Foundation Plan, Framing Plan, California Green Building Mandatory Measures, and Title 24 Energy Calculations signed sheets.",{"name":119,"@type":110,"acceptedAnswer":120},"What must be included in a Comprehensive Site Plan?",{"text":121,"@type":113},"Include a north arrow; use and dimensioned location of existing and proposed structures; label property lines; retain walls and any existing/proposed walls; locations of sewage disposal/septic or sewer lateral connections; zoning setbacks/easements; a driveway to the garage; and site drainage with arrows showing drainage away from the foundation, plus required acknowledgements.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},648249,1792792833,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":34,"category_name":35,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":24,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":19,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":52,"preview_page_count":4},1099514067438,"https://ap-avatar.wpscdn.com/avatar/100002539ee87300030?x-image-process=image/resize,m_fixed,w_180,h_180&k=1780474512215547542","USE SEPARATE PLANNING DIVISION CHECKLIST FOR SB9 PROJECTS. This is for ADU’s that are either attached to the house and/or garage or interior remodel of the house and/or garage, converting the space into a new ADU. In order for your construction plan submittal to be processed for review, the following items must be included in your submittal. Selecting the correct document type is important in SimpliCITY. Merge all plan sheets into ONE (1) PDF file.  \nDocument Type = PLANS  \n□ Sheet numbering should utilize standardized page numbering (see Page 4 – SimpliCITY’s automated page sorting order)  \nYou have obtained valid NEW City Address(es) -Follow instructions in the “New Address Request Requirements” at  \n□  [https://moval.gov/city_hall/forms/building-safety/AddressRequest.pdf](https://moval.gov/city_hall/forms/building-safety/AddressRequest.pdf)  \n□ Title Sheet (see page 2 for additional details)  \n□ Site Plan (see page 2 for additional details)  \n□ Floor Plan-doors, windows, exterior/interior walls, features, complete dimensions, etc.  \n□ Electrical Plan- location of equipment, switches, outlets, panels, sub-panels, service entrance, etc.  \n□ Plumbing Plan- location of fixtures routing & size to sewage disposal system, water, gas, etc.  \n□ Mechanical Plan- location of equipment like furnace, A/C, HVAC, routing of ductwork, etc.  \nExterior Elevations of all sides of structure(s)– including location of illuminated address numbers, showing both new and □  \nexisting construction  \n□ Construction Notes-applicable code sections which the structure must comply, material specifications, other notes, etc.  \n□ Foundation Plan-floor plan, structural details, etc.  \n□ Framing Plan (Wall, Floor and/or Roof)– layout  \n□ California Green Building Standards Mandatory Measures  \n□ Title 24 Energy Calculations – required signed sheets printed onto plan sheets Document Type = SUPPORTING DOCUMENTS  \n□ Structural Calculations – calculations for construction items that are not using conventional designs  \n□ Truss Calculations – layout plans & structural calculations if not using conventional roof framing (cannot be deferred)  \n□ Grading Plan (for reference)– contact Land Development if your scope of work also requires a separate permit with them  \n□ Any other reports, calculations, or specifications necessary for plan review  \nDocument Type = OTHER ATTACHMENTS  \n□ City Approved Address Letter  \n□ This Completed Minimum Plan Requirements Checklist & Acknowledgement (all 3 pages)  \n□ Other miscellaneous items needed by the City but not for plan review  \nA Comprehensive Title Sheet must contain the following (at a minimum):  \n□  \n□  \n□  \n□  \n□  \n□  \n□  \n□  \n□  \n□  \n□  \n□  \n□  \n□  \n□  \n□  \n□  \nNEW Valid City Address Assessor's Parcel Number (APN) Legal Description of Property  \nComplete Scope of Work Statement, listing all aspects of construction for the permit Square Footage (SF) of each structure and any Linear Feet (LF) for any block wall Occupancy Group(s)  \nFloor Area (SF) for Living Area, Garage, Porch/Patio, Deck, etc.  \nNumber of Stories  \nConstruction Type  \nCode Editions  \nVicinity Map  \nFire Sprinklers (Yes or No) NOTE:  \nSolar Panel Installation (Yes or No) - NOTE: If “Yes” on site plan, show proposed solar panel layout for reference only. Separate solar panel plan & permit is required  \nSheet Index  \nProperty Owner’s Information  \nPlan preparer with name, address, email and phone \\#  \nSignature of designer/architect/engineer of record (electronic signature is acceptable)  \nA Comprehensive Site Plan must contain the following (at a minimum):  \n□ North Arrow  \n□ Use, size & dimensioned location of existing and proposed structures  \n□ Any existing or proposed walls, especially retaining walls  \n□ Show and label all property lines  \n□ Location of existing and proposed sewage disposal systems (septic tanks) or public sewer lateral connections  \n□ Zoning Setbacks/easements  \n□ Driveway leading to garage  \n□ Site Drainage – using arrows showing di","cbCaidHY44xKghvq","https://ap.wps.com/l/cbCaidHY44xKghvq","pdf",242696,"English","# SB9 ADU Separate Planning Division Checklist\n## Required Plan Sheets (Document Type = PLANS)\n## Supporting Documentation Requirements (Document Type = SUPPORTING DOCUMENTS)\n## Other Attachments (Document Type = OTHER ATTACHMENTS)\n## Comprehensive Title Sheet Minimum Contents\n## Comprehensive Site Plan Minimum Contents\n## City Acknowledgements","[{\"question\":\"What document types must be used for SB9 ADU submissions in SimpliCITY?\",\"answer\":\"Use Document Type = PLANS for required plan sheets, Document Type = SUPPORTING DOCUMENTS for calculations and reports, and Document Type = OTHER ATTACHMENTS for items like the city approved address letter and the completed checklist acknowledgement pages.\"},{\"question\":\"Which plan sheets are required under Document Type = PLANS?\",\"answer\":\"The submission must include a Title Sheet, Site Plan, Floor Plan, Electrical Plan, Plumbing Plan, Mechanical Plan, Exterior Elevations, Construction Notes, Foundation Plan, Framing Plan, California Green Building Mandatory Measures, and Title 24 Energy Calculations signed sheets.\"},{\"question\":\"What must be included in a Comprehensive Site Plan?\",\"answer\":\"Include a north arrow; use and dimensioned location of existing and proposed structures; label property lines; retain walls and any existing/proposed walls; locations of sewage disposal/septic or sewer lateral connections; zoning setbacks/easements; a driveway to the garage; and site drainage with arrows showing drainage away from the foundation, plus required acknowledgements.\"}]","ADU Detached Checklist - SB9 Project Separate Planning Division | PDF"]