[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-663847-105":59,"doc-detail-663847-en":129},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":122,"head_meta":124,"extra_data":126,"updated_unix":128},105,"en","adapter-curb-specifications-part-1-general","Adapter Curb Specifications - Part 1 General","","Adapter Curb Specifications outlines requirements for furnishing, manufacturing, and installing AES Industries adapter curbs for roof curb retrofits and duct replacement scenarios. It covers general contractor responsibilities, product identification of models ARAC-1 through ARAC-3, construction details including minimum galvanized steel gauges, duct liner insulation, and turning vane/rail configurations, installation in accordance with manufacturer instructions and drawings, and coordination of curb sizes and options prior to fabrication. A one-year warranty against defects in material and workmanship is included.",{"@graph":69,"@context":121},[70,84,104],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/adapter-curb-specifications-part-1-general/663847/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":98,"encodingFormat":97,"isAccessibleForFree":99,"interactionStatistic":100},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/adapter-curb-specifications-part-1-general/663847.png","ImageObject",300,407,{"name":92,"@type":93},"Emma Wilson","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-29",true,{"@type":101,"interactionType":102,"userInteractionCount":81},"InteractionCounter",{"@type":103},"ViewAction",{"@type":105,"mainEntity":106},"FAQPage",[107,113,117],{"name":108,"@type":109,"acceptedAnswer":110},"What are the general responsibilities for installing the Adapter Curb?","Question",{"text":111,"@type":112},"The general contractor must provide all labor, materials, and equipment required to complete the installation of the Adapter Curb.","Answer",{"name":114,"@type":109,"acceptedAnswer":115},"What construction materials and minimum dimensions are required?",{"text":116,"@type":112},"Adapter Curbs must be constructed with minimum 14 gauge galvanized steel and fully welded corners, with 1” duct liner insulation on air impacted surfaces, and 18 gauge galvanized steel turning vanes as required, including a minimum height of 14” above the existing roof curb.",{"name":118,"@type":109,"acceptedAnswer":119},"How long is the warranty for Adapter Curbs?",{"text":120,"@type":112},"Adapter Curbs are guaranteed against defects in material and/or workmanship for a period of one (1) year.","https://schema.org",{"og:url":83,"og:type":123,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":125,"canonical":83},"index,follow",{"doc_id":127,"site_id":62},663847,1793232843,{"code":4,"msg":5,"data":130},{"doc_id":127,"user_id":131,"nickname":92,"user_avatar":132,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":133,"file_id":134,"file_url":135,"file_type":136,"file_size":137,"view_count":81,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":24,"language":138,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":139,"faqs":140,"seo_title":141,"seo_description":67,"update_tm":128,"read_time":142},3848291630094,"https://eur-avatar.wpscdn.com/davatar_085a072bc5b1113ac321206ff7593b45","29  \nAdapter Curb Specifications  \nPART 1 GENERAL  \n1.01 General contractor to provide all labor, materials and equipment in connection with the complete installation of the Adapter Curb.  \nPART 2 PRODUCTS  \n2.01 Adapter Curbs as manufactured by AES Industries, Inc., Tallassee, Alabama 36078, Phone 800-786-0402.  \nPART 3 CONSTRUCTION  \n3.01 Adapter Curbs shall be constructed using minimum 14 gauge galvanized steel with fully welded corners, 1” duct liner insulation on air impacted surfaces, and 18 gauge galvanized steel turning vanes as required.  \n3.02 Minimum height, 14” above existing roof curb.  \nPART 4 INSTALLATION  \n4.01 Adapter Curbs shall be installed in strict accordance with manufacturers printed instructions and as detailed on drawings.  \nPART 5 COORDINATION  \n5.01 Size of Curbs and required options shall be coordinated by support manufacturer with general contractor and mechanical contractor prior to fabrication.  \nPART 6 GUARANTEE  \n6.01 Adapter Curbs shall be guaranteed against defects in material and/or workmanship for a period of one(1) year.  \n30  \n\n| Adapter Curbs |  |  |  |  |\n| --- | --- | --- | --- | --- |\n| Customer   Project   Ship To  \u003Cbr>\u003Cbr>P.O. Number  Approved By  |  |  |  | Model ARAC-1\u003Cbr>Solid bottom Adapter Curb for existing curb with unknown location of openings. New openings are field supplied. |\n| |  |  | Standard Construction\u003Cbr>14ga. Galvanized Steel Plenum Adapter Curb\u003Cbr>Full Height Welded Corners 1” Duct Liner Insulation 12“ Height\u003Cbr>Supply and Return Openings to match existing curb\u003Cbr>1” x 1/4” thick Neoprene Gasket |  |\n| | Optional Construction\u003Cbr>Height as required\u003Cbr>Solid Bottom for field location of Supply and Return openings Isolation Rail System\u003Cbr>check all that apply | \u003Cbr>|  |  |\n| QTY Existing RTU New RTU COMMENTS |  |  |  |  |\n\nAES Industries Inc. P.O. Box 781147 Tallassee, AL 36078 Ph. 334-283-6578 Fax 334-283-5447  \n31  \n\n| Adapter Curbs |  |  |\n| --- | --- | --- |\n| Customer   Project   Ship To  \u003Cbr>\u003Cbr>P.O. Number  Approved By  |  | Model ARAC-2\u003Cbr>Adapter curb for maintenance-free installation. No field modifications required.\u003Cbr>Standard Construction |\n| 14ga. Galvanized Steel Rail Adapter Curb\u003Cbr>Full Height Welded Corners 1” Duct Liner Insulation Height as required by unit size 1” x 1/4” thick Neoprene Gasket |  |  |\n| | Optional Construction\u003Cbr>Isolation Rail System check all that apply |  |\n| QTY Existing RTU New RTU COMMENTS |  |  |\n\nAES Industries Inc. P.O. Box 781147 Tallassee, AL 36078 Ph. 334-283-6578 Fax 334-283-5447  \n32  \n\n| Adapter Curbs |  |  |\n| --- | --- | --- |\n| Customer   Project   Ship To  \u003Cbr>\u003Cbr>P.O. Number  Approved By  |  | Model ARAC-3\u003Cbr>Adapter curb for total duct replacement. New duct drops required by others.\u003Cbr>Standard Construction |\n| 14ga. Galvanized Steel Rail Adapter Curb 3” Deep Duct Support Rails\u003Cbr>Old Rails Absent or Field Removed New Drops Field Fabricated\u003Cbr>Full Height Welded Corners 1” Duct Liner Insulation Height as required by unit size 1” x 1/4” thick Neoprene Gasket |  |  |\n| | Optional Construction\u003Cbr>Duct support rails shipped loose Full Height Duct Support Rails Isolation Rail System\u003Cbr>check all that apply |  |\n| QTY Existing RTU New RTU COMMENTS |  |  |\n\nAES Industries Inc. P.O. Box 781147 Tallassee, AL 36078 Ph. 334-283-6578 Fax 334-283-5447  \n33  \n\n| Adapter Curb Installation Instructions |  |  |\n| --- | --- | --- |\n| Typical installation for AES Adapter Curbs |  |  |\n| 1. Remove all possible connections between existing unit and roof.\u003Cbr>2. Remove all duct connections to unit.\u003Cbr>3. Carefully remove existing unit.(Do not damage curb)\u003Cbr>EXISTING CURB |  | Typical connection\u003Cbr>locations Main power\u003Cbr>\u003Cbr>\u003Cbr> Gas\u003Cbr>4. Install neoprene to existing curb flanges and rails.\u003Cbr>5. Place adapter curb over existing curb as shown.\u003Cbr>6. Attach to existing curb with \\#10 x 1-1/4”long self-tapping screws (w/gaskets) .\u003Cbr>7. Move all power and pipe connections to new unit locations as required.\u003Cbr>8. Attach existing duct t","cbCaiskhRG8d2BCu","https://ap.wps.com/l/cbCaiskhRG8d2BCu","pdf",149025,"English","# Adapter Curb Specifications\n## Part 1 General\n## Part 2 Products\n## Part 3 Construction\n## Part 4 Installation\n## Part 5 Coordination\n## Part 6 Guarantee\n## Adapter Curb Models (ARAC-1 to ARAC-3)\n## Typical Installation Instructions","[{\"question\":\"What are the general responsibilities for installing the Adapter Curb?\",\"answer\":\"The general contractor must provide all labor, materials, and equipment required to complete the installation of the Adapter Curb.\"},{\"question\":\"What construction materials and minimum dimensions are required?\",\"answer\":\"Adapter Curbs must be constructed with minimum 14 gauge galvanized steel and fully welded corners, with 1” duct liner insulation on air impacted surfaces, and 18 gauge galvanized steel turning vanes as required, including a minimum height of 14” above the existing roof curb.\"},{\"question\":\"How long is the warranty for Adapter Curbs?\",\"answer\":\"Adapter Curbs are guaranteed against defects in material and/or workmanship for a period of one (1) year.\"}]","Adapter Curb Specifications - Part 1 General | PDF",13]