[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-648173-105":59,"doc-detail-648173-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","acrp-08-03-construction-safety-and-phasing-plans-notes","ACRP 08-03 - Construction Safety and Phasing Plans - Notes","","Example set of construction safety and phasing plan drawings for an airfield construction project under ACRP Project No. 08-03 (August 2020). Includes an overall phasing graphic showing all project phases and two detailed drawings covering two specific phases; detailed drawings for all phases are not provided. Guidance reflects best practices and lessons learned from ACRP Project 08-03: CSPP, with instructions to coordinate with FAA and other CSPP stakeholders to meet airport-specific requirements.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/acrp-08-03-construction-safety-and-phasing-plans-notes/648173/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/acrp-08-03-construction-safety-and-phasing-plans-notes/648173.png","ImageObject",300,407,{"name":92,"@type":93},"Blue Pony","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-23",true,{"@type":102,"interactionType":103,"userInteractionCount":8},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What does the document provide for ACRP 08-03?","Question",{"text":112,"@type":113},"It provides an example set of construction safety phasing drawings for an airfield construction project, including an overall phasing graphic and two detailed drawings for two specific phases.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"Are drawings for every phase included?",{"text":117,"@type":113},"No. Detailed drawings for all phases of the project have not been included; only two specific phases are shown in detail.",{"name":119,"@type":110,"acceptedAnswer":120},"What coordination is recommended for creating CSPP drawings?",{"text":121,"@type":113},"Airport sponsors and engineers/designers should work with the FAA and other CSPP stakeholders to develop CSPP drawings that meet the unique requirements of their airport and project.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},648173,1792792574,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":8,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":19,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":52},962090760266,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","Last Save: 10/9/2020 9:57 AM Last saved by: Jdherron  \nFi:  \\2018\\18081123-DAL-TW Bravo P III an IV\\Drawings\\Phase III ACRP CSPP Exhibits\\08-12-2020\\DALhases d \\ MISC\\2020 CS PP- COVER SHEET .dwg Last plotted by: Herron, Johnna D .  Plot Style: AECmono .ctb  Plot Scale: 1:1  Plot Date: 10/9/2020 10 : 0 Alotter use : _DWG To PDF.pc3  \n\n| ACRP 08-03 CSPP-EXAMPLE SET OF\u003Cbr>CONSTRUCTION SAFETY AND PHASING PLAN DRAWINGS\u003Cbr>\u003Cbr>ACRP PROJECT NO. 08-03 AUGUST 2020\u003Cbr>NOTES\u003Cbr>THIS DOCUMENT PROVIDES AN EXAMPLE SET OF CONSTRUCTION SAFETY PHASING DRAWINGS FOR AN AIRFIELD CONSTRUCTION PROJECT. IT INCLUDES THE FOLLOWING:\u003Cbr>1. AN OVERALL PHASING GRAPHIC SHOWING ALL THE PHASES OF THE PROJECT\u003Cbr>2. TWO DETAILED DRAWINGS SHOWING TWO SPECIFIC PHASES OF THE PROJECT\u003Cbr>DETAILED PHASE DRAWINGS FOR ALL THE PHASES OF THE PROJECT HAVE NOT BEEN INCLUDED.\u003Cbr>IT SHOULD BE NOTED THAT THIS IS AN EXAMPLE SET OF CSPP DRAWINGS DEVELOPED BASED ON THE BEST PRACTICES AND LESSONS LEARNED IDENTIFIED THROUGH ACRP PROJECT 08-03: CSPP. AIRPORT SPONSORS AND ENGINEERS/DESIGNERS SHOULD WORK WITH THE FAA AND OTHER CSPP STAKEHOLDERS TO DEVELOP CSPP DRAWINGS THAT MEET THE UNIQUE REQUIREMENTS OF THEIR AIRPORT AND PROJECT. | |  |  |  |  |\n| --- | --- | --- | --- | --- | --- |\n|  |  |  |  |  |  |\n|  | BY | BCA | BCA |  |  |\n|  | DESCRIPTION | ISSUED FOR CONSTRUCTION | CONSTRUCT ION REVISION NO . 1 |  |  |\n|  | DATE | 7/31/2020 | 9/12/2020 |  |  |\n|  | REV . | IFC | 1 |  |  |\n|  | AIRPORT COOPERATIVE RESEARCH PROGRAM WASHINGTON, DC\u003Cbr>ACRP 08-03-\u003Cbr>CONSTRUCTION SAFETY AND PHASING PLANS |  |  |  |  |\n|  | |  |  |  |  |\n|  | JOB NO.: 1234ABCD\u003Cbr>DATE: AUG. 2020\u003Cbr>DESIGNED BY:\u003Cbr>DRAWN BY: |  |  |  |  |\n|  | BAR IS ONE INCH ON ORIGINAL DRAWING 0  1\"IF NOT ONE INCH ON THIS SHEET, ADJUST SCALES ACCORDINGLY. |  |  |  |  |\n|  | DRAWING NUMBER\u003Cbr>G-300 |  |  |  |  |\n|  | SHEET\u003Cbr>NUMBER |  |  | 1 |  |\n\nFi:  \\2018\\18081123-DAL-TW Bravo Phases III and IV\\Drawings\\Phase III\\MISC\\2020 ACRP CSPP Exh ib its\\08-12-2020\\DAL CS PP-OVERV IEW .dwg Last Save: 10/9/2020 9 :5 1 AM  Last saved by : Jdherron  \nLast plotted by: Herron, Johnna D .  Plot Style: AECmono .ctb  Plot Scale: 1:1  Plot Date: 10/9/2020 10:0Alotter use : _DWG To PDF.pc3  \n\n| \u003Cbr>\u003Cbr>\u003Cbr>TWY M3 TWY A2\u003Cbr>\u003Cbr>TWY B\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>|  |  |  | |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- |\n|  |  |  |  |  |  |  |  |  |\n|  |  |  |  | BY | BCA | BCA |  |  |\n|  |  |  |  | DESCRIPTION | ISSUED FOR CONSTRUCTION | CONSTRUCT ION REVISION NO . 1 |  |  |\n| | CONSTRUCTION TIME (345 CALENDAR DAYS)\u003Cbr>PHASE CALENDAR DAYS MOBILIZATION-15 CALENDAR DAYS PHASE 1-135 CALENDAR DAYS PHASE 2-3 CALENDAR DAYS PHASE 3-60 CALENDAR DAYS PHASE 4-45 CALENDAR DAYS PHASE 5-75 CALENDAR DAYS PHASE 6-90 CALENDAR DAYS PHASE 7-45 CALENDAR DAYS PHASE 8-60 CALENDAR DAYS\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>0 30 60 90 120 150 180 210 240 270 300 330 360 390 | NOTES:\u003Cbr>1. PHASE 7 SHALL NOT OCCUR BETWEEN NOVEMBER 18 TO JANUARY 5.\u003Cbr>2. ALL CONTRACTOR VEHICLES AND TRAFFIC SHALL REMAIN WITHIN THE LIMITS OF CONSTRUCTION AREAS, STAGING AREAS, OR HAUL ROUTES AS SHOWN ON THE PLANS, OR AS APPROVED BY THE OWNER OR THE OWNER'S AUTHORIZED REPRESENTATIVE.\u003Cbr>3. HAUL ROUTES-LOCATION OF HAUL ROUTES ON THE AIRPORT SHALL BE AS SPECIFIED ON THE PLANS OR AS APPROVED BY THE OWNER AT THE PRE-CONSTRUCTION MEETING.\u003Cbr>4. OPERATIONS ON THE VEHICLE SERVICE ROAD SHALL OBSERVE A SPEED LIMIT OF 20 MPH. THE TERMINAL AREA VEHICLE SERVICE ROAD AND RAMP SPEED LIMIT IS 15 MPH.\u003Cbr>5. THE HAUL TRUCKS SHALL BE COVERED AT ALL TIMES. IN THE EVENT THAT ANY FOREIGN OBJECT, SPILLAGE, DEBRIS OR DUST BUILDS UP AS A RESULT OF HAULING, THE CONTRACTOR SHALL BE REQUIRED TO IMMEDIATELY CLEAN AND REMOVE THIS MATERIAL. DUST CONTROL SHALL BE MAINTAINED AT ALL TIMES. IF TAXIWAY CROSSINGS ARE NECESSARY, 24 HR. NOTICE IS MANDATORY.\u003Cbr>6. CONTRACTORS SHALL NOT ENTER ANY RUNWAY, TAXIWAY, OR ANY PROTECTED SURFACE UNLESS SPECIFICALLY APPROVED AS PART OF THE CONSTRUCTION PLAN.\u003Cbr>7. CONSTRUCTION EQUIPM","cbCaidbdFElCKZGg","https://ap.wps.com/l/cbCaidbdFElCKZGg","pdf",7214784,"English","# Notes\n## Scope of the example drawings\n## Phasing concept and duration\n## Safety requirements and operational limits\n## Legend and drawing references","[{\"question\":\"What does the document provide for ACRP 08-03?\",\"answer\":\"It provides an example set of construction safety phasing drawings for an airfield construction project, including an overall phasing graphic and two detailed drawings for two specific phases.\"},{\"question\":\"Are drawings for every phase included?\",\"answer\":\"No. Detailed drawings for all phases of the project have not been included; only two specific phases are shown in detail.\"},{\"question\":\"What coordination is recommended for creating CSPP drawings?\",\"answer\":\"Airport sponsors and engineers/designers should work with the FAA and other CSPP stakeholders to develop CSPP drawings that meet the unique requirements of their airport and project.\"}]","ACRP 08-03 - Construction Safety and Phasing Plans - Notes | PDF"]