[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-663933-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-663933-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","accessory-dwelling-unit-adu-standard-plans-program-pre-submittal-meeting-agenda-may-22-2023","Accessory Dwelling Unit (ADU) Standard Plans Program - Pre-Submittal Meeting Agenda - May 22, 2023","","Pre-Submittal Meeting agenda for the Accessory Dwelling Unit (ADU) Standard Plans Program, held May 22, 2023. The meeting covers staff introductions, key program information, an overview of five ADU prototypes, and digital submittal instructions. It outlines the program goal to provide homeowners with preapproved ADU plans to simplify and reduce design and permitting time and cost, including requirements for licensed architect or engineer designers, review timelines, estimated plan check fees, and accessibility considerations. Q&A is included for participant questions.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/healthcare/","Healthcare",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/accessory-dwelling-unit-adu-standard-plans-program-pre-submittal-meeting-agenda-may-22-2023/663933/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/accessory-dwelling-unit-adu-standard-plans-program-pre-submittal-meeting-agenda-may-22-2023/663933.png","ImageObject",300,407,{"name":42,"@type":43},"CatatanPagi","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",5,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What is the goal of the ADU Standard Plans Program?","Question",{"text":63,"@type":64},"The program goal is to provide homeowners options for preapproved ADU plans to simplify, expedite, and reduce the overall cost of design and permitting for ADUs.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What are the requirements and limits for designers submitting plans?",{"text":68,"@type":64},"Designers must be licensed architects or engineers. Each designer may submit up to five (5) ADU plans for consideration.",{"name":70,"@type":61,"acceptedAnswer":71},"What timelines and compliance criteria apply to submitted ADU plans?",{"text":72,"@type":64},"Plans must be submitted for first review by June 30, with designers able to submit beginning June 1. Submitted plans are reviewed for compliance with California building, residential, and energy codes and local ADU regulations consistent with State ADU laws.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},663933,1793234474,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,100,105,109,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":107,"slug":108},7,40,"healthcare",{"id":110,"doc_module":4,"doc_module_name":25,"category_name":111,"show_sort_weight":112,"slug":113},8,"Research & Report",30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":55,"slug":129},19,"General","general",{"code":4,"msg":82,"data":131},{"doc_id":79,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":106,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":80,"read_time":144},962090894170,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","Planning & Community Development  \nAccessory Dwelling Unit (ADU) Standard Plans Program  \nPre-Submittal Meeting May 22, 2023  \nMeeting Agenda  \nPlanning & Community Development  \n1. Staff Introductions:  \nRon Takiguchi, Building Official  \nGuille Nunez, Senior Planner (Program Manager)  \n2. Key Program Information  \n3. Overview of the 5 ADU Prototypes  \n4. Digital Submittal Instructions  \n5. Accessibility in ADU Design (optional)  \n6. Q & A  \nYour questions can be typed into the chat at any time during the meeting.  \nKey Program Information  \nPlanning & Community Development  \n• Program goal is to provide homeowners options for preapproved ADU plans to help simplify, expedite and reduce the overall cost of design and permitting for ADUs.  \n• City would like to offer pre-approved ADU plans for its 5 ADU prototypes, at least 5 for each prototype including at least 1 accessible design.  \n• Approved plans will be featured on the City’s ADU webpage.  \n> Rendering/elevation, floor plan, designer’s contact information  \n• Interested designers can submit plans for review beginning June 1st (standard plan check fees apply)  \n> Plans must be submitted for first review by June 30.  \nKey Program Information  \nPlanning & Community Development  \n• Designers must be licensed architect or engineer  \n> Each designer may submit up to five (5) ADU plans each for consideration in the program  \n> Homeowners will work directly with the designer to negotiate the cost for the plans as well as any other services.  \n> All plans will remain the intellectual property of the architect/engineer.  \n• Submitted plans will be reviewed for compliance with the California Building, Residential and Energy Codes, as well as local ADU regulations consistent with State ADU laws.  \n> Approved plans will remain on the City’s dedicated ADU webpage until December 31, 2025, when the current building codes expire.  \n• City would like to have ADU plans available by end of summer.  \n4  \nPasadena’s 5 ADU Prototype Plans  \nPlanning & Community Development  \nA. 1-story studio 1-bath, 375 sf  \nB. 1-story 1-bed 1-bath, 440 sf  \nC. 1-story 1-bed 1-bath, 540 sf  \nD. 1-story 2-bed 2-bath, 700 sf  \nE. 2-story 3-bed 2.5 bath, 1,200 sf  \nADU Prototype Designs: [https://www.cityofpasadena.net/planning/wp](https://www.cityofpasadena.net/planning/wp)content/uploads/sites/30/Draft-Prototype-Design-Options-Package.pdf?v=1684520403573  \nPasadena’s 5 ADU Prototype Plans  \nPlanning & Community Development  \nEstimated Plan Check Fees:  \n$2,643.50  \nPasadena’s 5 ADU Prototype Plans  \nPlanning & Community Development  \nEstimated Plan Check Fees:  \n$2,830.50  \nPasadena’s 5 ADU Prototype Plans  \nPlanning & Community Development  \nEstimated Plan Check Fees:  \n$3,102.50  \n8  \nPasadena’s 5 ADU Prototype Plans  \nPlanning & Community Development  \n9  \nEstimated Plan Check Fees:  \n$3,985.50  \nPasadena’s 5 ADU Prototype Plans  \nPlanning & Community Development  \nEstimated Plan Check Fees:  \n$5,230.50  \n10","cbCaioyH4bIFMyxB","https://ap.wps.com/l/cbCaioyH4bIFMyxB","pdf",798038,21,"English","# Planning & Community Development\n## Accessory Dwelling Unit (ADU) Standard Plans Program\n## Pre-Submittal Meeting Agenda\n## Staff Introductions\n## Key Program Information\n## Overview of the 5 ADU Prototypes\n## Digital Submittal Instructions\n## Accessibility in ADU Design (optional)\n## Q & A","[{\"question\":\"What is the goal of the ADU Standard Plans Program?\",\"answer\":\"The program goal is to provide homeowners options for preapproved ADU plans to simplify, expedite, and reduce the overall cost of design and permitting for ADUs.\"},{\"question\":\"What are the requirements and limits for designers submitting plans?\",\"answer\":\"Designers must be licensed architects or engineers. Each designer may submit up to five (5) ADU plans for consideration.\"},{\"question\":\"What timelines and compliance criteria apply to submitted ADU plans?\",\"answer\":\"Plans must be submitted for first review by June 30, with designers able to submit beginning June 1. Submitted plans are reviewed for compliance with California building, residential, and energy codes and local ADU regulations consistent with State ADU laws.\"}]","Accessory Dwelling Unit (ADU) Standard Plans Program - Pre-Submittal Meeting Agenda - May 22, 2023 | PDF",53]