[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-662975-105":59,"doc-detail-662975-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","acceptance-of-record-and-electronic-drawings-minimum-requirements","Acceptance of Record and Electronic Drawings - Minimum Requirements","","Acceptance of Record and Electronic Drawings defines the Engineer of Record’s submission obligations to the City of Meridian Public Works Department. A complete, updated set of Record Drawings with Electronic Drawings must be delivered within thirty days after construction completion and after final inspections, prior to Certificates of Occupancy and (for capital projects) final payment. Submittals require accuracy review, stamped/signed/dated sheets by an Idaho-registered professional engineer, Ada County projection compliance, and electronic layer standards. The package must include both hard copy and thumb-drive deliverables, plus surveyed design-and-as-built data for sewer and water systems.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/acceptance-of-record-and-electronic-drawings-minimum-requirements/662975/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/acceptance-of-record-and-electronic-drawings-minimum-requirements/662975.png","ImageObject",300,407,{"name":92,"@type":93},"Eliana","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":8},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"When must Record Drawings and Electronic Drawings be submitted?","Question",{"text":112,"@type":113},"Record drawings must be submitted within thirty days of construction completion, after final inspections are passed, and before Certificates of Occupancy are issued. For Capital projects, this occurs prior to final payment.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What stamping, signing, and dating requirements apply to the submittal?",{"text":117,"@type":113},"All sheets must be modified as required and marked as RECORD DRAWING(S) in the lower right corner. They must be stamped, signed, and dated by a State of Idaho Registered Professional Engineer.",{"name":119,"@type":110,"acceptedAnswer":120},"What is required to ensure Electronic Drawings meet the correct projection standard?",{"text":121,"@type":113},"Electronic drawings must use the Ada County Projection, obtainable through the Ada County Surveyor’s webpage, the City of Meridian’s webpage, or the City of Meridian Public Works Department. Failure requires resubmittal of the Electronic Drawings.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},662975,1793224013,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":8,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":81},4398048949847,"https://ap-avatar.wpscdn.com/avatar/400002536579ef2da7f?_k=1778318612642679267","Mayor Robert E. Simison  \nCity Council Members  \nLiz Strader Anne Little Roberts  \nDoug Taylor Luke Cavener John Overton  \nProject Name:   \nAcceptance of Record and Electronic Drawings  \nThe Engineer of Record will submit a complete, updated set of Record Drawings with Electronic Drawings of the project to the Construction Division of the City of Meridian Public Works Department. Record drawings to be submitted within thirty days of completion of construction, after final inspections are passed, and prior to Certificates of Occupancy being issued. For Capital projects, this takes place prior to final payment.  \nThe Record Drawings shall be reviewed for accuracy. Replacement sheets or new plans may be requested if errors are found.  \nMINIMUM REQUIREMENTS  \nThe following are the City of Meridian’s minimum requirements for approval of Record and Electronic Drawings. All sheets in the submittal set shall be modified as noted below and marked in the lower right hand corner as RECORD DRAWING(S) . They MUST BE STAMPED, SIGNED, AND DATED by a State of Idaho Registered Professional Engineer. Electronic drawing(s) will be submitted in the Ada County Projection. This projection can be attained through the Ada County Surveyor’s webpage, City of Meridian’s webpage, or the City of Meridian Public Works Department. Failure to follow the Ada County Projection will result in resubmittal of Electronic Drawings. If you have any questions feel free to contact the City of Meridian Public Works Department at 208-898-5500.  \nRecord Drawing submittals shall show the following design and surveyed data:  \n1. Sewer Main diameter, length, material, and slope are to be called out in either plan or profile view.  \n2. Sewer Manhole and t-type cleanout rims and inverts are to be located horizontally and vertically. Design elevations (rims and inverts) in the profile shall be crossed through and the surveyed (rims and inverts) displayed in bold next to the crossed out values. Design grades shall be recalculated to show installed grades and shown in revision clouds. Changes in types and lengths of pipe must also be shown.  \n3. Water and Recycled Water Main diameter, length, and material are to be called out in either plan or profile view.  \n4. Domestic and recycled water fire hydrants, water valves, air-vac stations and blow-off locations are to be located horizontally and vertically. Documented or known changes in types, lengths of pipe, or any other changes to the domestic and recycled water systems shall be shown.  \n5. Any other changes to the construction drawings should be noted and shown with a revision cloud.  \n6. All surveyed points (as noted above) are to be shown on a separate layer in the electronic AutoCAD file.  \nRecord Drawing Submittal Packages shall include:  \n1. One (1) hard paper copy (Xerox or Blue Line)  \n2. One (1) electronic copy on a thumb drive that includes:  \na. PDF of Hard Paper Copy  \nb. AutoCAD drawing in the Ada County Projection  \nEngineer of Record Signature Printed Name Date  \nEngineer of Record  \nEmail","cbCaidxG38Km72ZT","https://ap.wps.com/l/cbCaidxG38Km72ZT","pdf",939547,"English","# Project Acceptance Timeline and Review\n## Minimum Requirements for Approval\n## Required Design and Surveyed Data\n## Record Drawing Submittal Packages","[{\"question\":\"When must Record Drawings and Electronic Drawings be submitted?\",\"answer\":\"Record drawings must be submitted within thirty days of construction completion, after final inspections are passed, and before Certificates of Occupancy are issued. For Capital projects, this occurs prior to final payment.\"},{\"question\":\"What stamping, signing, and dating requirements apply to the submittal?\",\"answer\":\"All sheets must be modified as required and marked as RECORD DRAWING(S) in the lower right corner. They must be stamped, signed, and dated by a State of Idaho Registered Professional Engineer.\"},{\"question\":\"What is required to ensure Electronic Drawings meet the correct projection standard?\",\"answer\":\"Electronic drawings must use the Ada County Projection, obtainable through the Ada County Surveyor’s webpage, the City of Meridian’s webpage, or the City of Meridian Public Works Department. Failure requires resubmittal of the Electronic Drawings.\"}]","Acceptance of Record and Electronic Drawings - Minimum Requirements | PDF"]