[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-663252-105":59,"doc-detail-663252-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","ablution-block-plumbing-layout-typical-plumbing-layout","Ablution Block - Plumbing Layout - Typical Plumbing Layout","","Technical plumbing layout drawing for an ablutions block at STERKSPRUITS Business Campus, including typical sewer manhole details and sectional views (A-A, B-B, C-C) at specified scales. General notes define dimensional control, setting out verification, construction compliance with SABS 1200 series and project specifications, and requirements for pipe material (110mm PVC class), bedding, flexible joints near manhole connections, and backfill compaction. The sheet includes project, drawing, status, revision dates, and contractor/approval references, plus submission and rights notices.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/ablution-block-plumbing-layout-typical-plumbing-layout/663252/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/ablution-block-plumbing-layout-typical-plumbing-layout/663252.png","ImageObject",300,407,{"name":92,"@type":93},"Muffet","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":81},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What measurement units and drawing scaling rules apply to this layout?","Question",{"text":112,"@type":113},"All dimensions are in mm, must be checked on site, and the drawing must not be scaled. Only figured dimensions are to be used.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"Which standards and regulations govern the construction work?",{"text":117,"@type":113},"Work must be carried out in accordance with SABS 1200 series and the project series specifications, complying with the National Building Regulations (Act No 103 of 1977) including amendments, SANS 10400, and local authority bylaws.",{"name":119,"@type":110,"acceptedAnswer":120},"What are the key requirements for pipes, joints, and backfill?",{"text":121,"@type":113},"Pipes are 110mm PVC class unless otherwise specified and laid on flexible pipe bedding unless otherwise specified. Flexible joints should be provided within 1000mm from manhole connection points, and backfill must be compacted to 93% Mod AASHTO unless otherwise specified.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},663252,1793226025,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":81,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":81},962090768927,"https://ap-avatar.wpscdn.com/davatar_085a072bc5b1113ac321206ff7593b45","| PLUMBING LAYOUT |  |  |  |  |  |  |  |  |  |  |  |  | GENERAL NOTES\u003Cbr>• ALL DIMENSIONS ARE IN mm AND MUST BE CHECKED ON SITE AND DRAWINGS MUST NOT BE SCALED.\u003Cbr>• THIS DRAWING MUST NOT BE SCALED, FIGURED DIMENSIONS ONLY TO BE USED.\u003Cbr>• THE CONTRACTOR OS TO CONFIRM ALL LEVELS AND SETTING OUT INFORMATION PRIOR TO CONSTRUCTION.\u003Cbr>• ALL DIMENSIONS AND LEVELS ARE TO BE VERIFIED ON SITE PRIOR TO COMMENCING SETTING OUT, WORKSHOP DRAWINGS OR CONSTRUCTION.\u003Cbr>• ALL WORK TO BE CARRIED OUT TO BE CARRIED OUT IN ACCORDANCE WITH SABS 1200 SERIES AND THE PROJECT SERIES SPECIFICATIONS\u003Cbr>• ALL PIPES TO BE 110mm PVC CLASS UNLESS OTHERWISE SPECIFIED\u003Cbr>• ALL PIPES TO BE LAID ON FLEXIBLE PIPE BEDDING UNLESS OTHERWISE SPECIFIED\u003Cbr>• ALL BACKFILL TO BE COMPACTED TO 93% Mod AASHTO UNLESS OTHERWISE SPECIFIED\u003Cbr>• FLEXIBLE JOINTS SHOULD BE PROVIDED IN THE INLET AND OUTLET PIPELINES WITHIN A DISTANCE OF 1000mm FROM CONNECTIONS OF MANHOLES\u003Cbr>• WORKS WILL BE INSPECTED FROM TIME TO TIME BY THE CONSULTING ENGINEER TO ASCERTAIN THAT THE CONTRACTOR IS CARRYING OUT THE WORK IN GENERAL CONFORMITY WITH THE ENGINEERING DRAWINGS.\u003Cbr>• ALL MATERIALS AND CONSTRUCTION MUST COMPLY WITH THE NATIONAL BUILDING REGULATIONS (ACT NO 103 OF 1977) INCLUDING ALL AMENDMENTS, SANS 10400 AS WELL AS THE BYLAWS OF THE LOCAL AUTHORITIES.\u003Cbr>• ALL MATERIALS MUST BE FIXED AND FINISHED STRICTLY TO MANUFACTURER'S SPECIFICATION, UNLESS OTHERWISE SPECIFIED. SHOP DRAWINGS TO BE SUBMITTED FOR APPROVAL PRIOR TO MANUFACTURE OR INSTALLATION.\u003Cbr>• COPY RIGHT AND RIGHT OF REPRODUCTION OF THIS DRAWING OR\u003Cbr>ANY PORTION THEREOF IS RESERVED BY GREENFIELD RESOURCES. |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| |  | | | | |  | \u003Cbr>C\u003Cbr>C\u003Cbr>\u003Cbr>\u003Cbr>B\u003Cbr>\u003Cbr>A\u003Cbr>B\u003Cbr>\u003Cbr> A\u003Cbr>\u003Cbr>|  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  | A | 04-10-2025 |  | STAGE 3 |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  | \u003Cbr>REV. NO. | \u003Cbr>DATE |  | DESCRIPTION |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | \u003Cbr>REVISION |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  | CLIENT: |  |  |  |  |\n| SCALE 1:30 |  |  |  |  |  |  |  |  |  |  |  |  | PRINCIPAL AGENT:\u003Cbr>|  |  |  |  |\n| SECTION C-C\u003Cbr>SCALE 1:20 | TYPICAL SEWER MANHOLE |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  | |  |  |  |  | |  |  | |  |  |  | Project: ALTERATIONS AND ADDITIONS TO IKHALA\u003Cbr>TVET COLLEGE:\u003Cbr>STERKSPRUITS BUSINESS CAMPUS |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  | Drawing:\u003Cbr>STERKSPRUIT BUSINESS CAMPUS: ABLUTIONS BLOCK |  |  |  |  |\n|  | |  |  |  |  | |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  | Status:\u003Cbr>TYPICAL PLUMBING LAYOUT |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  Drawn By: |  | \u003Cbr>DM |  | Project No: |\n|  |  |  |  |  |  | |  |  |  | |  |  | Checked By: |  | DT |  | P 24010 |\n|  |  |  |  |  |  | |  |  |  |  | |  |  |  |  |  |  |\n|  |  |  |  |  |  | |  | |  |  | |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  | Scale: |  | As Shown |  | \u003Cbr>Rev. No: |\n|  |  |  |  |  |  |  |  |  |  |  |  |  | Date: |  | 06-10-2025 |  | A |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  Drg. No:\u003Cbr>|  | ","cbCaigV1OqX4tD06","https://ap.wps.com/l/cbCaigV1OqX4tD06","pdf",920856,"English","# General Notes\n# Drawing Information\n## Sections and Scales\n## Typical Sewer Manhole\n## Revisions and Status","[{\"question\":\"What measurement units and drawing scaling rules apply to this layout?\",\"answer\":\"All dimensions are in mm, must be checked on site, and the drawing must not be scaled. Only figured dimensions are to be used.\"},{\"question\":\"Which standards and regulations govern the construction work?\",\"answer\":\"Work must be carried out in accordance with SABS 1200 series and the project series specifications, complying with the National Building Regulations (Act No 103 of 1977) including amendments, SANS 10400, and local authority bylaws.\"},{\"question\":\"What are the key requirements for pipes, joints, and backfill?\",\"answer\":\"Pipes are 110mm PVC class unless otherwise specified and laid on flexible pipe bedding unless otherwise specified. Flexible joints should be provided within 1000mm from manhole connection points, and backfill must be compacted to 93% Mod AASHTO unless otherwise specified.\"}]","Ablution Block - Plumbing Layout - Typical Plumbing Layout | PDF"]