[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-664193-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-664193-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","a101-2017-merchants-way-contract-exhibits","A101-2017 - Merchants Way - Contract Exhibits","","This document serves as the formal AIA A101-2017 contract exhibits for the Merchants Way project. It encompasses critical project parameters including progress payment procedures, definitions of retainage, and binding dispute resolution protocols. Additionally, the document lists comprehensive project drawings spanning architectural, civil, and structural disciplines, organized by specific plan sets and site details. This administrative record outlines the contractual obligations between the Owner and the Contractor, establishing clear guidelines for payment cycles, project termination, and authorized representative contact information to ensure project governance.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/general/","General",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/a101-2017-merchants-way-contract-exhibits/664193/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/a101-2017-merchants-way-contract-exhibits/664193.png","ImageObject",300,407,{"name":42,"@type":43},"Emma Wilson","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":52,"interactionType":53,"userInteractionCount":26},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What is the established progress payment period?","Question",{"text":62,"@type":63},"The period covered by each Application for Payment is one calendar month, ending on the last day of the month.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"What is the retainage amount for progress payments?",{"text":67,"@type":63},"The retainage amount for each progress payment prior to Substantial Completion is five percent (5%).",{"name":69,"@type":60,"acceptedAnswer":70},"How are binding disputes resolved under this contract?",{"text":71,"@type":63},"Disputes are resolved through litigation in a court of competent jurisdiction.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},664193,1793243449,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,115,120,123,127],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":112,"show_sort_weight":113,"slug":114},8,"Research & Report",30,"research-report",{"id":116,"doc_module":4,"doc_module_name":25,"category_name":117,"show_sort_weight":118,"slug":119},9,"Religion & Spirituality",20,"religion-spirituality",{"id":118,"doc_module":4,"doc_module_name":25,"category_name":121,"show_sort_weight":118,"slug":122},"World Cup","world-cup",{"id":124,"doc_module":4,"doc_module_name":25,"category_name":125,"show_sort_weight":124,"slug":126},10,"Lifestyle","lifestyle",{"id":128,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":96,"slug":129},19,"general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":128,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":26,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":79,"read_time":144},3848291630094,"https://eur-avatar.wpscdn.com/davatar_085a072bc5b1113ac321206ff7593b45","EXHIBIT A LIST OF DRAWINGS  \nDOCUMENT 00 01 15-LIST OF DRAWINGS  \nGENERAL  \nG001  \nG101  \nG102  \nG103  \nPROJECT COVER SHEET  \nLEVEL 1 – CODE REVIEW/EGRESS PLAN LEVEL 2 & 3 – CODE REVIEW/EGRESS PLAN UL ASSEMBLIES  \nARCHITECTURAL SITE DEMOLITION  \nASD001 COMPOSITE SITE DEMOLTION PLAN  \nARCHITECTURAL SITE  \nAS001 COMPOSITE ARCHITECTURAL SITE PLAN AS002 ENLARGED SITE PLANS AND DETAILS AS003 SITE DETAILS  \nAS004 ALUMINUM WALKWAY COVER PLANS AND DETAILS  \n10.07.24  \nCIVIL  \nC001 HARRIS COUNTY ENGINEERING DEPARTMENT REVIEW SHEET  \nC002 HARRIS COUNTY FLOOD CONTROL DISTRICT REVIEW SHEET  \nC003 GENERAL NOTES  \nC004 TOPOGRAPHIC SURVEY  \nC005 DEMOLITION PLAN  \nC100 OVERALL CIVIL SITE PLAN  \nC101 DIMENSIONAL LAYOUT  \nC201 GRADING LAYOUT  \nC301 UTILITY LAYOUT  \nC501 PAVING AND JOINTING PLAN  \nC701 MISCELLANEOUS DETAILS  \nSTRUCTURAL  \nS001 STRUCTURAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS  \nS100 LEVEL 1 LEVEL 2 FLOOR AND LEVEL 3 FLOOR PLANS S110 MECHANCIAL YARD FOUNDATION PLAN  \nS301 TYPICAL DETAILS  \nS310 TYPCIAL FOUNDATION DETAILS  \nS501 STRUCTURAL INTERIOR VESTIBULE DETAILS  \nARCHITECTURAL DEMOLITION  \nAD111 LEVEL 1 – DEMOLITION PLAN – AREA ‘A’  \nAD112 LEVEL 1 – DEMOLITION PLAN – AREA ‘B’  \nAD121 LEVEL 2 – DEMOLITION PLAN – AREA ‘A’  \nAD122 LEVEL 2 – DEMOLITION PLAN – AREA ‘B’  \nAD611 LEVEL 1 – DEMOLITION REFLECTED CEILING PLAN – AREA ‘A’  \nAD612 LEVEL 1 – DEMOLITION REFLECTED CEILING PLAN – AREA ‘B’  \nAD621 LEVEL 2 – DEMOLITION REFLECTED CEILING PLAN – AREA ‘A’  \nAD622 LEVEL 2 – DEMOLITION REFLECTED CEILING PLAN – AREA ‘B’  \nAD631 LEVEL 3 – DEMOLITION REFLECTED CEILING PLAN – AREA ‘A’  \nAD632 LEVEL 3 – DEMOLITION REFLECTED CEILING PLAN – AREA ‘B’","cbCaivQR5NlLh0tU","https://ap.wps.com/l/cbCaivQR5NlLh0tU","pdf",5812170,22,"English","# EXHIBIT A LIST OF DRAWINGS\n## General\n## Architectural Site Demolition\n## Architectural Site\n## Civil\n## Structural\n## Architectural Demolition\n# CONTRACT PROVISIONS\n## Payments\n## Binding Dispute Resolution\n## Termination or Suspension\n## Miscellaneous Provisions","[{\"question\":\"What is the established progress payment period?\",\"answer\":\"The period covered by each Application for Payment is one calendar month, ending on the last day of the month.\"},{\"question\":\"What is the retainage amount for progress payments?\",\"answer\":\"The retainage amount for each progress payment prior to Substantial Completion is five percent (5%).\"},{\"question\":\"How are binding disputes resolved under this contract?\",\"answer\":\"Disputes are resolved through litigation in a court of competent jurisdiction.\"}]","A101-2017 - Merchants Way - Contract Exhibits | PDF",34]