[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-646635-105":59,"doc-detail-646635-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","a-commitment-to-safety-vendor-installation-section-i","A COMMITMENT TO SAFETY - VENDOR INSTALLATION - SECTION I","","Safety instructions and vendor installation guidelines for Vendo equipment, emphasizing hazards in electrical and mechanical servicing and the non-exhaustive nature of the warnings. The manual outlines safety rules such as reading the safety manual before work, proper grounding, disconnecting power during jam clearing, using trained technicians for “Power On” service, and wearing eye and personal protective equipment near refrigeration systems. Section I details safe handling, unpacking steps, required air clearance, leveling procedures, and verifying power supply and outlet grounding/polarization by outlet type.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":35,"@type":76,"position":81},"https://docshare.wps.com/document/healthcare/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/a-commitment-to-safety-vendor-installation-section-i/646635/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/a-commitment-to-safety-vendor-installation-section-i/646635.png","ImageObject",300,407,{"name":92,"@type":93},"Quinn Holloway","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-06","2026-10-23",true,{"@type":102,"interactionType":103,"userInteractionCount":39},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"Why does the manual stress safety warnings during servicing of Vendo equipment?","Question",{"text":112,"@type":113},"Servicing electrical and mechanical devices involves potential hazards for service personnel and users. The manual provides basic safety guidelines and alerts to potentially hazardous areas, noting the warnings are not exhaustive.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What safety steps are required before installation or service?",{"text":117,"@type":113},"Read the Safety Manual before installation or service. Test for proper grounding before installing to reduce the risk of electrical shock and fire, and disconnect the power cord from the wall outlet before servicing or clearing product jams.",{"name":119,"@type":110,"acceptedAnswer":120},"How should outlets be tested for grounding and polarization during vendor installation?",{"text":121,"@type":113},"For Type 1 and Type 2 outlets, test grounding and polarization using a volt meter or test light by checking reactions between Neutral and Live, and between Earth and Live. For Type 3 through Type 5 outlets, test grounding by identifying the Live power contact and verifying reaction between Earth and Live power contact, and between Live power and the other power contact.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},646635,1793060980,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":34,"category_name":35,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":39,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145,"preview_page_count":4},2336474466712,"https://ap-avatar.wpscdn.com/davatar_a8503ba1806abce46bf441b54a3ca4cd","A COMMITMENT TO SAFETY  \nThe Vendo Company is committed to safety in every aspect of our product design. Vendo is committed to alerting every user to the possible dangers involved in improper handling or maintenance of our equipment. The servicing of any electrical or mechanical device involves potential hazards, both to those servicing the equipment and to users of the equipment. These hazards can arise because of improper maintenance techniques. The purpose of this manual is to alert everyone servicing Vendo equipment of potentially hazardous areas, and to provide basic safety guidelines for proper maintenance.  \nThis manual contains various warnings that should be carefully read to minimize the risk of personal injury to service personnel. This manual also contains service information to insure that proper methods are followed to avoid damaging the vendor or making it unsafe. It is also important to understand these warnings are not exhaustive. Vendo could not possibly know, evaluate, or advise of all of the conceivable ways in which service might be done. Nor can Vendo predict all of the possible hazardous results. The safety precautions outlined in this manual provide the basis for an effective safety program. Use these precautions, along with the service manual, when installing or servicing the vendor.  \nWe strongly recommend a similar commitment to safety by every servicing organization. Only personnel properly trained in vendor servicing should have access to the interior of the machine. This will minimize the potential hazards that are inherent in electrical and mechanical devices. Vendo has no control over the machine once it leaves the premises. It is the owner or lessor’s responsibility to maintain the vendor in a safe condition. See Section I of this manual for proper installation procedures and refer to the appropriate service manual for recommended maintenance procedures. If you have any questions, please contact the Technical Services Department of the Vendo office nearest you. Refer to the listing at the back of this manual.  \nSAFETY RULES  \n􀂷 Read the Safety Manual before installation or service  \n􀂷 Test for proper grounding before installing to reduce the risk of electrical shock and fire.  \n􀂷 Disconnect power cord from wall outlet before servicing or clearing product jams. The vending mechanism can trap and pinch hands.  \n􀂷 Use only fully trained service technicians for “Power On” servicing.  \n􀂷 Use adequate equipment when moving a vendor.  \n􀂷 Always wear eye protection, and protect your hands, face, and body when working near the refrigeration system.  \n􀂷 Use only authorized replacement parts.  \n􀂷 Be aware of inherent dangers in rocking or tipping a vending machine.  \nSECTION I: VENDOR INSTALLATION  \nA. Vendors are large, bulky machines of significant size and weight. Improper handling can result in injury. When moving a vendor, carefully plan the route to be taken and the people and equipment required to accomplish the task safely.  \nB. Remove all tape, shipping sealant, and Styrofoam from the vendor. Loosen any shipping devices used to secure interior parts during shipping. Remove the wooden shipping base, attached to the vendor base by the vendor leveling screws. Make certain the leveling screws are in place and functional.  \nC. Position the vendor three to four inches (7.6 cm to 10.2 cm) from a wellconstructed wall (of a building or otherwise) on a flat, smooth surface.  \nIMPORTANT: The vendor requires three inches (7.6 cm) of air space from the wall to ensure proper air circulation to cool the refrigeration unit.  \nD. Adjust the leveling screws to compensate for any irregularities on the floor surface. Ideally, no adjustment will be necessary and the leveling legs will be flush with the bottom of the vendor. A spirit level is a useful aid to level the vendor. When the vendor is properly leveled, the outer door, when opened, will remain stationary. Vendors must be level to assure proper operation and t","cbCaiojJjN5AZ63M","https://ap.wps.com/l/cbCaiojJjN5AZ63M","pdf",2541747,103,"English","# Safety Rules\n## Safety Rules before Installation or Service\n# Section I: Vendor Installation\n## Vendor Handling and Unpacking\n## Placement and Air Clearance\n## Leveling Procedures\n## Power Supply and Outlet Verification","[{\"question\":\"Why does the manual stress safety warnings during servicing of Vendo equipment?\",\"answer\":\"Servicing electrical and mechanical devices involves potential hazards for service personnel and users. The manual provides basic safety guidelines and alerts to potentially hazardous areas, noting the warnings are not exhaustive.\"},{\"question\":\"What safety steps are required before installation or service?\",\"answer\":\"Read the Safety Manual before installation or service. Test for proper grounding before installing to reduce the risk of electrical shock and fire, and disconnect the power cord from the wall outlet before servicing or clearing product jams.\"},{\"question\":\"How should outlets be tested for grounding and polarization during vendor installation?\",\"answer\":\"For Type 1 and Type 2 outlets, test grounding and polarization using a volt meter or test light by checking reactions between Neutral and Live, and between Earth and Live. For Type 3 through Type 5 outlets, test grounding by identifying the Live power contact and verifying reaction between Earth and Live power contact, and between Live power and the other power contact.\"}]","A COMMITMENT TO SAFETY - VENDOR INSTALLATION - SECTION I | PDF",1792765152,260]