[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-649711-105":59,"doc-detail-649711-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","974c-terms-of-reference-site-plan-simplified-checklist","974c Terms of Reference - Site Plan Simplified Checklist","","Simplified checklist for preparing a site and property plan set aligned to Terms of Reference. Specifies drawing setup requirements such as north arrow, clear property boundaries, easements, circulation and access routes, removal of revision clouds, and consistent lineweights. Details what to include for adjacent buildings, setbacks, dimensions and labeling, utilities and infrastructure, parking/loading areas, hydrants and utility placements, loading clear heights, and landscape/site elements while keeping the drawing legible and non-overlapping.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/974c-terms-of-reference-site-plan-simplified-checklist/649711/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/974c-terms-of-reference-site-plan-simplified-checklist/649711.png","ImageObject",300,407,{"name":92,"@type":93},"naya.afterrain","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-24",true,{"@type":102,"interactionType":103,"userInteractionCount":14},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What drawing setup details must be shown on the site plan set?","Question",{"text":112,"@type":113},"Show a north arrow and use clear, legible plan layouts. Delineate existing and proposed property boundaries and easements, and remove revision clouds and notes while ensuring annotations do not overlap.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What site and access information should be included?",{"text":117,"@type":113},"Clearly show pedestrian, vehicular, and service access routes. Indicate entrances and exits, right-of-way or laneway widening areas, mid-block connections, transit stops, laneways, and adjacent building footprints and addresses.",{"name":119,"@type":110,"acceptedAnswer":120},"What are the key requirements for dimensions, utilities, and infrastructure?",{"text":121,"@type":113},"Use metric units only, dimension the exterior envelope and site features, and include overall building length/depth and key projection dimensions. Show all above-grade infrastructure, locate existing manhole covers, and indicate utilities such as transformers and gas meters, including relevant screening and air-vent/grate density labels.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},649711,1792804333,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":19,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":52},962094248482,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","| |  |  | \u003Cbr>\u003Cbr>|  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| \u003Cbr>\u003Cbr>DRAWING SETUP |  |  | |  | SITE & PROPERTY | | CIRCULATION & ACCESS |  |\n|   Show north arrow. |  |  | | | Clearly delineate existing, proposed property boundaries and easements. | | | Clearly show pedestrian, vehicular, and service access routes. |\n| | | Reference Ground Floor Plan layout exclusively | | | Emphasize property lines visually | | | Indicate POPS, amenity areas, mid block connections, transit stops, and laneways. |\n| | | Omit site survey overlays; prioritize plan legibility | | | Show adjacent building footprints, municipal addresses, and primary use. | | | Show all vertical circulation elements (stairs, elevators, ramps) . |\n| \u003Cbr> Remove revision clouds/notes.\u003Cbr>Ensure all annotations are legible and  do not overlap.\u003Cbr>Use consistent lineweights and colours to  emphasize essential information. |  |  | \u003Cbr>| \u003Cbr>| Show existing buildings and structures to remain.\u003Cbr>Show retaining walls and geodetic elevations associated with grade changes. | \u003Cbr>| | Specify laneway and right of way widths, indicating centerlines.\u003Cbr>Identify required right of way or laneway widening areas. |\n| | | Display legends, relevant charts, and tables outside the floor plan | |  | DIMENSIONS & LABELING | | UTILITIES & INFRASTRUCTURE |  |\n| | | Remove interior space partitions. Show major spaces. | | | Dimension exterior envelope and site features only. Limit interior dimensions. | | | Show all existing above-grade infrastructure. |\n| | | Ensure no notes are duplicated anywhere on the drawing set. | | | Eliminate floating dimension lines; ensure text is consistently aligned | | | Show only final, approved locations for at grade utility structures. |\n| | | Ensure all notes are oriented correctly and are not mirrored or reversed. | | | Provide dimensions of projections and exterior elements. | |  Locate all existing manhole covers. |  |\n| |  Use metric units exclusively for all measurements. |  | | | Show overall building length and overall building depth | | | Show locations of utilities such as transformers and gas meters. |\n|  |  |  | | | Indicate building face to curb dimension. | | | Label air vents and indicate grate density and gas meter screening |\n| \u003Cbr>Scan to learn more about: Application Support Material Terms of Reference\u003Cbr>\u003Cbr>\u003Cbr>Scan to Learn More |  |  | \u003Cbr>\u003Cbr>\u003Cbr>| \u003Cbr>\u003Cbr>\u003Cbr>| Provide all building setbacks relative to\u003Cbr>property lines and adjacent curbs Provide point-to-point dimensions between main interior walls\u003Cbr>Show setback distances to parkland, its area and dimensions.\u003Cbr>Provide dimensions between separate buildings on the same lot. | | | Show all street level utility features including hydro and lighting poles, fire hydrants, and transformers. |\n\n| \u003Cbr>| | |\n| --- | --- | --- |\n| \u003Cbr>ADJACENT PROPERTY ADDRESS MIXED USE (18 STOREY)\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>A3.01\u003Cbr>\u003Cbr>\u003Cbr>SETBACK 1600\u003Cbr>POPS WIDTH\u003Cbr>9700\u003Cbr>TOTAL BUILDING WIDTH\u003Cbr>66,630\u003Cbr>10000 PLANTER\u003Cbr>6400 10000\u003Cbr>PLANTER\u003Cbr>16000\u003Cbr>10000 PLANTER\u003Cbr>8650 23600\u003Cbr>14800 12000\u003Cbr>2200 PEDESTRIAN CLEARWAY\u003Cbr>1600 6000\u003Cbr>SETBACK\u003Cbr>P.O.P.S.\u003Cbr>76.0 m²\u003Cbr>FIRE HYDRANT RELOCATED\u003Cbr>AMENITY\u003Cbr>63.0 m²\u003Cbr>LOBBY\u003Cbr>337.8 m²\u003Cbr>RES. LOBBY 155.2 m²\u003Cbr>RETAIL\u003Cbr>100.0 m²\u003Cbr>CONCIERGE\u003Cbr>CACF\u003Cbr>PET SPA\u003Cbr>10.6 m²\u003Cbr>6000\u003Cbr>CURB TO\u003Cbr>BUILDING FACE\u003Cbr>6000\u003Cbr>PARKING ACCESS\u003Cbr>1000\u003Cbr>AMENITY 198.0 m²\u003Cbr>RESIDENTIAL ENTRANCE\u003Cbr>2200\u003Cbr>PEDESTRIAN\u003Cbr>CLEARWAY\u003Cbr>10900 5600 7200\u003Cbr>13300\u003Cbr>3500 1100\u003Cbr>1100\u003Cbr>VISITOR BICYCLE (89)\u003Cbr>24.64 m²\u003Cbr>DROP-OFF\u003Cbr>DN\u003Cbr>VEHICULAR\u003Cbr>SCREENING\u003Cbr>SEEDWG.\u003Cbr>x\u003Cbr>MAXIMUM\u003Cbr>CENTRELINE OF LANEWAY PUBLIC LANEWAY\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>POROSITY\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>VISITOR BIKE\u003Cbr>\u003Cbr>ENTRANCE\u003Cbr>\u003Cbr>ACCESS\u003Cbr>\u003Cbr>RAMP 94.8 m²\u003Cbr>\u003Cbr>EXTENT OF 1200mm\u003Cbr>\u003Cbr>SOIL DEPTH BELOW\u003Cbr>\u003Cbr>EXTENT OF 1200mm\u003Cbr>\u003Cbr>SOIL DEPTH BELOW\u003Cbr>TYPE G LOADING 6.1MCLEAR HEIGHT\u003Cbr>4000\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>A3.02\u003Cbr>\u003Cbr>A3.02","cbCaiaHA9Hz9HqWI","https://ap.wps.com/l/cbCaiaHA9Hz9HqWI","pdf",4482314,"English","# Drawing Setup\n## Site & Property\n## Circulation & Access\n## Dimensions & Labeling\n## Utilities & Infrastructure\n## Landscape & Site Elements","[{\"question\":\"What drawing setup details must be shown on the site plan set?\",\"answer\":\"Show a north arrow and use clear, legible plan layouts. Delineate existing and proposed property boundaries and easements, and remove revision clouds and notes while ensuring annotations do not overlap.\"},{\"question\":\"What site and access information should be included?\",\"answer\":\"Clearly show pedestrian, vehicular, and service access routes. Indicate entrances and exits, right-of-way or laneway widening areas, mid-block connections, transit stops, laneways, and adjacent building footprints and addresses.\"},{\"question\":\"What are the key requirements for dimensions, utilities, and infrastructure?\",\"answer\":\"Use metric units only, dimension the exterior envelope and site features, and include overall building length/depth and key projection dimensions. Show all above-grade infrastructure, locate existing manhole covers, and indicate utilities such as transformers and gas meters, including relevant screening and air-vent/grate density labels.\"}]","974c Terms of Reference - Site Plan Simplified Checklist | PDF"]