[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-664194-105":59,"doc-detail-664194-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","824-2014-addendum-1-drawing-a-3-1-r1","824-2014 Addendum 1 - Drawing A-3-1 - R1","","Architectural drawing addendum outlining renovation and patch/repair instructions for main floor and mezzanine floor plans. Specifies a 1-hour firestopping requirement for mechanical and electrical penetrations, identifies enclosure details for a water meter within millwork, and sets out general contractor responsibilities to verify dimensions, datums, and levels. Includes scope notes for electrical and mechanical trade modifications, relocation of utilities, wall infill assemblies, and coordination with demolition, structural, mechanical, and electrical documents.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/824-2014-addendum-1-drawing-a-3-1-r1/664194/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/824-2014-addendum-1-drawing-a-3-1-r1/664194.png","ImageObject",300,407,{"name":92,"@type":93},"Eliana","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":102,"interactionType":103,"userInteractionCount":81},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What is the required fire rating for mechanical and electrical penetrations?","Question",{"text":112,"@type":113},"Room requires 1 hour rating. All mechanical and electrical penetrations must be firestopped with a ULC recognized system to 1 hour.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What responsibilities does the General Contractor have before starting work?",{"text":117,"@type":113},"The General Contractor must verify all dimensions, datums, and levels prior to commencement. Errors and omissions must be reported immediately to the Architect.",{"name":119,"@type":110,"acceptedAnswer":120},"How should the water meter be handled during renovation?",{"text":121,"@type":113},"Existing water meter to remain as is. A new wall is to be framed around the water meter, and the meter is to be enclosed in a millwork cabinet; site location must be confirmed before beginning work.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},664194,1793243456,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":81,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":81},4398048949847,"https://ap-avatar.wpscdn.com/avatar/400002536579ef2da7f?_k=1778318612642679267","ROOM REQUIRES 1 HOUR RATING. ENSURE ALL MECHANICAL AND ELECTRICAL PENETRATIONS ARE FIRESTOPPED WITH ULC RECOGNIZED SYSTEM TO 1 HOUR.  \nPATCH AND REPAIR OPENING IN MEZZANINE FLOOR DUE  \nThis drawing must not be scaled.  \nThe general Contractor must verify all dimensions, datums and levels prior to commencement of work. All errors and omissions must be reported immediately to the Architect.  \nThe drawings, speciﬁcations, revisions, addendums, and clariﬁcations, must be read as a whole. Errors and omissions due to separation of the documents by the general contractor become the responsibility of the same.  \nrevision  \n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  | |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  | \u003Cbr>\u003Cbr>|  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n\n5% MAX. SLOPE  \n| |  |\n| --- | --- |\n|  |  |\n\nD26  \n1 NEW MAIN FLOOR PLAN A-3 . 1 SCALE 1:100  \n2 NEW MEZZANINE FLOOR PLAN A-3 . 1 SCALE 1:100  \nN  \nM11  \nD21  \nM17  \nM15  \nM14  \nM13  \nM18  \nM19  \nM20  \nM10  \nM08  \nM06  \nM02  \nD34  \nM30  \nM22  \nM26  \nM27  \nM24  \nM25  \nM31  \nM32  \nM33  \nM23  \nM34  \nM28  \nGENERAL NOTES:  \n-ELECTRICAL WORK/MODIFICATION TO BE COMPLETED BY ELECTRICAL TRADE.  \n-MECHANICAL WORK/MODIFICATION TO BE COMPLETED BY MECHANICAL TRADE.  \n-RELOCATE UTILITIES TO NEW LOCATIONS WHERE AND AS REQUIRED. (SEE MECHANICAL & ELECTRICAL DRAWINGS.)  \n-READ NEW PROPOSED FLOOR PLAN IN CONJUNCTION WITH DEMOLITION PLAN, STRUCTURAL, MECHANICAL AND ELECTRICAL DOCUMENTS .  \n-CONSULT THE CONTRACT ADMINISTRATOR IF ANY UNCERTAINTIES AND/OR DISCREPANCIES ARISE PRIOR TO COMMENCEMENT OF COMPLETION OF WORK.  \n-ALL NON-FIXED MILLWORK MAY NOT BE SHOWN AND WILL REQUIRE STORAGE AND REINSTALLATION TO PREVIOUS LOCATIONS AFTER CONSTRUCTION IS COMPLETED.  \n-MECHANICAL AND ELECTRICAL EQUIPMENT, FIXTURES, ETC. TO BE MODIFIED, REMOVED, RELOCATED AND/OR REPLACED AS REQUIRED FOR RENOVATION AND AS PER MECHANICAL AND ELECTRICAL DEMOLITION DRAWINGS.  \n-PATCH AND REPAIR EXISTING CONCRETE BLOCK AS REQUIRED FOR RELOCATION OF FIRE ALARM PULL STATIONS, LIGHT SWITCHES ETC. COORDINATE WITH MECHANICAL AND ELECTRICAL ON SITE.  \n-MAKE GOOD ALL DISTURBED EXISTING CONDITIONS SHOWN TO REMAIN.  \n-PATCH, REPAIR AND MAKE GOOD EXISTING CONCRETE FLOOR AS REQUIRED FOR MODIFICATIONS TO EXISTING PLUMBING TO SUIT NEW LAYOUT. REPAIRED CONCRETE TO MATCH ESITING-TYPICAL.  \n2  \n2  \n2  \n3  \n4  \n4  \n4  \n4  \n4  \n4  \n4  \n4  \n4  \n4  \n4  \n4  \n1  \n4  \n2  \n4  \n2  \n4  \n4  \n4  \n4  \n2  \n4  \n2  \n2  \n2  \n2  \n4  \n3  \n6  \n3  \n2  \n4  \n6  \n16  \n3  \n7  \n7  \n7  \n7  \n7  \n7  \n7  \n7  \n7  \n7  \n7  \n6  \n7  \n9  \n9  \n10  \n10  \n10  \n10  \n10  \n10  \n2,721  \n10  \n10  \n10  \n10  \n10  \n10  \n10  \n10  \nEXISTING DOOR-FLIP SWING AND PREP FOR NEW PAINT  \n11  \n5  \n8  \n9  \n2  \nNOTE:  \n-SEE ENLARGED WASHROOM PLANS FOR NEW WALL DIMENSIONS.  \n-ALL DIMENSIONS ARE SHOWN FINISH TO FINISH.  \n-ALL EXISTING WALLS ARE PAINTED CONCRETE BLOCK THROUGHOUT THE COMMUNITY CENTRE.  \n4  \n5 M23 PLAN DETAIL  A-3 . 1 SCALE 1:10  \nMPR \\#1  \nM25  \nM24  \nELEC.  \nM23  \nCIRCULATION HUB  \nM20  \nEXISTING WATER METER TO REMAIN AS IS  \n-NEW WALL TO BE FRAMED AROUND WATER METER  \n-WATER METER TO BEENCLOSED IN MILLWORK CABINET  \n-SITE CONFIRM LOCATION PRIOR TO BEGINNING WORK  \nWOMENS  \nCORRIDOR  \nM14  \nM19  \n'J'","cbCaisdoeIOG8Wpb","https://ap.wps.com/l/cbCaisdoeIOG8Wpb","pdf",385505,"English","# General Notes\n## Firestopping and Patch/Repair Requirements\n## Contractor Verification and Document Coordination\n# Floor Plan Details and Drawings\n## Main Floor Plan Numbered Renovation Notes\n## Mezzanine Floor Plan Updates","[{\"question\":\"What is the required fire rating for mechanical and electrical penetrations?\",\"answer\":\"Room requires 1 hour rating. All mechanical and electrical penetrations must be firestopped with a ULC recognized system to 1 hour.\"},{\"question\":\"What responsibilities does the General Contractor have before starting work?\",\"answer\":\"The General Contractor must verify all dimensions, datums, and levels prior to commencement. Errors and omissions must be reported immediately to the Architect.\"},{\"question\":\"How should the water meter be handled during renovation?\",\"answer\":\"Existing water meter to remain as is. A new wall is to be framed around the water meter, and the meter is to be enclosed in a millwork cabinet; site location must be confirmed before beginning work.\"}]","824-2014 Addendum 1 - Drawing A-3-1 - R1 | PDF"]