[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-662922-105":59,"doc-detail-662922-en":129},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":122,"head_meta":124,"extra_data":126,"updated_unix":128},105,"en","806-2019-addendum-3-drawing-l-06-flow-meter-fault-and-flow-fefit-l201-typical","806-2019 Addendum 3 - Drawing L-06 - Flow Meter Fault and Flow FE/FIT-L201 (Typical)","","Engineering drawing set addendum identifying Drawing L-06 within the 806-2019 package, issued for construction. The sheet includes an instrument loop diagram and labeled control panel/PLC rack slot references. It specifies a discharge flow instrument loop with a flow meter totalise pulse and alarm, including FIT-L201 callouts and related signal designations. Document metadata includes revision “Issued for Addendum 3” with date 2019-09-30 and project identifiers and drawing numbers for the Jessie Wastewater Pumping Station Upgrades.",{"@graph":69,"@context":121},[70,84,104],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/806-2019-addendum-3-drawing-l-06-flow-meter-fault-and-flow-fefit-l201-typical/662922/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":98,"encodingFormat":97,"isAccessibleForFree":99,"interactionStatistic":100},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/806-2019-addendum-3-drawing-l-06-flow-meter-fault-and-flow-fefit-l201-typical/662922.png","ImageObject",300,407,{"name":92,"@type":93},"asda1da","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-28",true,{"@type":101,"interactionType":102,"userInteractionCount":4},"InteractionCounter",{"@type":103},"ViewAction",{"@type":105,"mainEntity":106},"FAQPage",[107,113,117],{"name":108,"@type":109,"acceptedAnswer":110},"What is the main subject of Drawing L-06 in the addendum package?","Question",{"text":111,"@type":112},"Drawing L-06 shows the flow meter fault and flow FE/FIT-L201 (typical) with an instrument loop diagram for discharge flow.","Answer",{"name":114,"@type":109,"acceptedAnswer":115},"Which date and revision label are listed for “Issued for Addendum 3”?",{"text":116,"@type":112},"The revision indicates “Issued for Addendum 3” with the date 2019-09-30.",{"name":118,"@type":109,"acceptedAnswer":119},"What flow meter signals are indicated in the diagram?",{"text":120,"@type":112},"The sheet labels a flow meter totalise pulse and a flow meter alarm associated with FIT-L201.","https://schema.org",{"og:url":83,"og:type":123,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":125,"canonical":83},"index,follow",{"doc_id":127,"site_id":62},662922,1793223429,{"code":4,"msg":5,"data":130},{"doc_id":127,"user_id":131,"nickname":92,"user_avatar":132,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":133,"file_id":134,"file_url":135,"file_type":136,"file_size":137,"view_count":4,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":138,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":139,"faqs":140,"seo_title":141,"seo_description":67,"update_tm":128,"read_time":81},3985747861852,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","| INSTRUMENT LOOP DIAGRAM |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| FIELD |  |  |  |  |  |  |  |  | CONTROL PANEL |  |  |  |  |  | PLC |  |  |  |  |  |\n| \u003Cbr>\u003Cbr>\u003Cbr>|  |  |  |  |  |  |  |  | 2A\u003Cbr>24 V\u003Cbr>\u003Cbr>\u003Cbr>0 V\u003Cbr>\u003Cbr>|  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | RACK 2, SLOT 2 |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | |  |  | P-L01\u003Cbr>DISCHARGE FLOW |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | VI4 |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | II4 |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | COM4 |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | RACK 1, SLOT 7 |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | I9 |  |  | FIT-L201\u003Cbr>FLOW METER TOTALISE PULSE\u003Cbr>FIT-L201\u003Cbr>FLOW METER ALARM |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | \u003Cbr>FQL201 |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | \u003Cbr>YAL201 |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | I8 |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | COM |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| DRAWING NUMBER | REFERENCE DRAWINGS | B. M. ELEV. |  |  |  | |  |  |  |  | ENGINEER'S SEAL | |  | | |  |  |  |  |  |\n|  |  | CONSTRUCTION COMPLETION DATE: YYYY MM DD |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  | DESIGNED BY | CAL | CHECKED BY |  | BLM |  | JESSIE WASTEWATER PUMPING STATION UPGRADES\u003Cbr>FLOW METER FAULT AND FLOW FE/FIT-L201 (TYPICAL) |  |  |  |  |  |  |  | SHEET 06 OF 10 |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  | DRAWN BY | SCK | APPROVED BY |  | BLM |  |  |  |  |  |  |  |  |  | CONSULTANT DRAWING NUMBER\u003Cbr>L-06 |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  | SCALE: HORIZONTAL VERTICAL | NTS | RELEASED FOR CONSTRUCTION\u003Cbr>DATE |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  | CONSULTANT PROJECT NUMBER 199259 |  |  |  |  |  |  |  |  | CITY DRAWING NUMBER\u003Cbr>1-0149L-E0014-001 |\n|  |  | 0 | ISSUED FOR ADDENDUM 3 | 2019-09-30 | B. L. M. |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  | NO. | REVISIONS | DATE | BY | DATE 2019 09 30 |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n\nPLOT DATE: 2019 09 30  \nBID OPPORTUNITY: CONTRACT NUMBER: X  \nFILE PATH:  \nFILE NAME:  \nC:\\projectwise\\working directory\\projects 2019\\40skk\\dms19203\\ 199259-SCHEM-02.dwg","cbCaijnkjC1N3wRH","https://ap.wps.com/l/cbCaijnkjC1N3wRH","pdf",80264,"English","# Instrument loop diagram\n## Control panel and PLC rack references\n## Flow meter pulse and alarm (FIT-L201)","[{\"question\":\"What is the main subject of Drawing L-06 in the addendum package?\",\"answer\":\"Drawing L-06 shows the flow meter fault and flow FE/FIT-L201 (typical) with an instrument loop diagram for discharge flow.\"},{\"question\":\"Which date and revision label are listed for “Issued for Addendum 3”?\",\"answer\":\"The revision indicates “Issued for Addendum 3” with the date 2019-09-30.\"},{\"question\":\"What flow meter signals are indicated in the diagram?\",\"answer\":\"The sheet labels a flow meter totalise pulse and a flow meter alarm associated with FIT-L201.\"}]","806-2019 Addendum 3 - Drawing L-06 - Flow Meter Fault and Flow FE/FIT-L201 (Typical) | PDF"]