[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-649502-105":59,"doc-detail-649502-en":129},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":122,"head_meta":124,"extra_data":126,"updated_unix":128},105,"en","7-20-20-sbn-standards-1","7-20-20-SBN-Standards-1","","Revision history and table of contents for the “SBN Standards 1” document, organized into structured sections and subsections. The revisions track document creation and later modifications, including added stormwater quantity management, landscaping, and fixtures/finishes updates, plus drawing additions and revisions. The table of contents specifies governance elements such as purpose, standing references, variance process, financial guarantees and permits, liquidated damages, qualifications, R/W occupancy, traffic control, private encroachments, fee exemptions, curb cut applications, and utility work requirements.",{"@graph":69,"@context":121},[70,84,104],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/7-20-20-sbn-standards-1/649502/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":98,"encodingFormat":97,"isAccessibleForFree":99,"interactionStatistic":100},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/7-20-20-sbn-standards-1/649502.png","ImageObject",300,407,{"name":92,"@type":93},"jay","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-24",true,{"@type":101,"interactionType":102,"userInteractionCount":14},"InteractionCounter",{"@type":103},"ViewAction",{"@type":105,"mainEntity":106},"FAQPage",[107,113,117],{"name":108,"@type":109,"acceptedAnswer":110},"What revision items are documented in the revision history?","Question",{"text":111,"@type":112},"The revision history lists creation and subsequent updates, including added stormwater quantity management, landscaping, fixtures/finishes, minor text revisions, and multiple drawing additions and revisions.","Answer",{"name":114,"@type":109,"acceptedAnswer":115},"What does Section 1 focus on?",{"text":116,"@type":112},"Section 1 covers general and miscellaneous requirements, including purpose, standing references, variance process, financial guarantees and permits, liquidated damages, qualifications, and right-of-way occupancy.",{"name":118,"@type":109,"acceptedAnswer":119},"Which topics are included under right-of-way occupancy requirements?",{"text":120,"@type":112},"The table of contents breaks down R/W occupancy into right-of-way occupancy, traffic control, private encroachments, fee exemptions, curb cut applications, additional permits and fees, and related utility work requirements.","https://schema.org",{"og:url":83,"og:type":123,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":125,"canonical":83},"index,follow",{"doc_id":127,"site_id":62},649502,1792835210,{"code":4,"msg":5,"data":130},{"doc_id":127,"user_id":131,"nickname":92,"user_avatar":132,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":133,"file_id":134,"file_url":135,"file_type":136,"file_size":137,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":138,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":143,"read_time":144},3985747858866,"https://ap-avatar.wpscdn.com/davatar_a8503ba1806abce46bf441b54a3ca4cd","| Revision\u003Cbr>Number | Revision\u003Cbr>Date | Nature of Revision |\n| --- | --- | --- |\n| 0 | 6/26/2018 | Document Creation |\n| 1 | 10/8/2019 | Modified Section 3 – Added Stormwater Quantity Management |\n| 2 | 7/28/2020 | Added Section 8 – Landscaping and Section 9 – Fixtures and Finishes; Minor text revisions throughout; Added Drawing 2-45; Added Drawing 2-46; Revised Drawing 6-16; Added Drawing 6-20; Added Drawings 9-1 through 9-12 |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n\nTable of Contents  \nSECTION 1 – GENERAL– MISCELLANEOUS .....................................................................................................................1  \n1-1 PURPOSE..............................................................................................................................................................1  \n1-2 STANDING REFERENCES .......................................................................................................................................1  \n1-3 VARIANCE PROCESS .............................................................................................................................................2  \n1-3.1 VARIANCES .....................................................................................................................................................2  \n1-4 FINANCIAL GUARANTEES AND PERMITS ..............................................................................................................2  \n1-5 LIQUIDATED DAMAGES........................................................................................................................................3  \n1-6 QUALIFICATIONS..................................................................................................................................................3  \n1-7 R/W OCCUPANCY.................................................................................................................................................3  \n1-7.1 RIGHT-OF-WAY OCCUPANCY ........................................................................................................................... 3  \n1-7.2 TRAFFIC CONTROL ............................................................................................................................................3  \n1-7.3 PRIVATE ENCROACHMENTS ............................................................................................................................. 3  \n1-7.4 FEE EXEMPTIONS .............................................................................................................................................4  \n1-7.5 CURB CUT APPLICATIONS.................................................................................................................................4  \n1-7.6 ADDITIONAL PERMITS AND FEES .....................................................................................................................4  \n1-8 UTILITY WORK......................................................................................................................................................4  \n1-8.1 MAINTENANCE OF TRAFFIC REQUIREMENTS ...................................................................................................4  \n1-8.2 PERMITS BEFORE COMMENCING WORK .........................................................................................................4  \n1-9 GENERAL SUBMISSION REQUIREMENTS ..............................................................................................................5  \n1-10 PLAN / CALCULATION REQUIREMENTS .....................................................","cbCaiski7KKN1JFH","https://ap.wps.com/l/cbCaiski7KKN1JFH","pdf",10655004,254,"English","# SECTION 1 – GENERAL– MISCELLANEOUS\n## 1-1 PURPOSE\n## 1-2 STANDING REFERENCES\n## 1-3 VARIANCE PROCESS\n## 1-3.1 VARIANCES\n## 1-4 FINANCIAL GUARANTEES AND PERMITS\n## 1-5 LIQUIDATED DAMAGES\n## 1-6 QUALIFICATIONS\n## 1-7 R/W OCCUPANCY\n## 1-7.1 RIGHT-OF-WAY OCCUPANCY\n## 1-7.2 TRAFFIC CONTROL\n## 1-7.3 PRIVATE ENCROACHMENTS\n## 1-7.4 FEE EXEMPTIONS\n## 1-7.5 CURB CUT APPLICATIONS\n## 1-7.6 ADDITIONAL PERMITS AND FEES\n## 1-8 UTILITY WORK\n## 1-8.1 MAINTENANCE OF TRAFFIC REQUIREMENTS\n## 1-8.2 PERMITS BEFORE COMMENCING WORK\n## 1-9 GENERAL SUBMISSION REQUIREMENTS\n## 1-10 PLAN / CALCULATION REQUIREMENTS\n## 1-10.1 PLAN SUBMISSIONS\n## 1-10.2 RECORD DRAWINGS\n## 1-11 PRIVATE IMPROVEMENTS\n## 1-11.1 PRIVATE IMPROVEMENTS IN UNDEDICATED AREAS\n# SECTION 2 – STREETS, WALKWAYS, AND PATHS\n## 2-1 GENERAL\n## 2-1.1 PURPOSE\n## 2-2 DESIGN REQUIREMENTS\n## 2-2.1 GENERAL\n## 2-2.2 STREET CLASSIFICATION\n## 2-2.3 TYPICAL SECTION\n## 2-2.4 DESIGN SPEED","[{\"question\":\"What revision items are documented in the revision history?\",\"answer\":\"The revision history lists creation and subsequent updates, including added stormwater quantity management, landscaping, fixtures/finishes, minor text revisions, and multiple drawing additions and revisions.\"},{\"question\":\"What does Section 1 focus on?\",\"answer\":\"Section 1 covers general and miscellaneous requirements, including purpose, standing references, variance process, financial guarantees and permits, liquidated damages, qualifications, and right-of-way occupancy.\"},{\"question\":\"Which topics are included under right-of-way occupancy requirements?\",\"answer\":\"The table of contents breaks down R/W occupancy into right-of-way occupancy, traffic control, private encroachments, fee exemptions, curb cut applications, additional permits and fees, and related utility work requirements.\"}]","7-20-20-SBN-Standards-1 | PDF",1792800775,640]