[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-648720-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-648720-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","501-steel-structures-construction-submittal-and-fabrication-requirements","501-STEEL STRUCTURES - Construction Submittal and Fabrication Requirements","","Section 501.03 specifies construction of steel structures and steel portions of composite structures, covering required shop drawings, submission timelines, and approval workflow. It lists materials for steel fabrication, including primers, zinc coatings, structural steel, shear connectors, castings, and standard fasteners. The section defines content for shop drawings, required prints and reports with set counts, mill and shop inspection access, welding requirements under AWS standards, and erection practices such as handling, storage on skids, and falsework design support.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/501-steel-structures-construction-submittal-and-fabrication-requirements/648720/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/501-steel-structures-construction-submittal-and-fabrication-requirements/648720.png","ImageObject",300,407,{"name":42,"@type":43},"anakgang17","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-24","2026-10-23",true,{"@type":52,"interactionType":53,"userInteractionCount":22},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What is covered by Section 501.03 Construction?","Question",{"text":62,"@type":63},"It covers construction of steel structures and the steel portions of composite structures, including shop drawing submission, fabrication practices, inspection, welding, and erection requirements.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"How are shop plans submitted and approved?",{"text":67,"@type":63},"Detailed shop drawings are submitted for steel fabrication, with 6 sets provided for review; one set is returned with comments and corrections, and corrected drawings are resubmitted until accepted.",{"name":69,"@type":60,"acceptedAnswer":70},"What information must shop drawings include?",{"text":71,"@type":63},"Shop drawings must include details for undimensioned connections, plate rolling direction, sequence and procedures, location of butt-welded splices, fabrication calculations and temporary supports, slip-critical/tension connection notes, and welders and inspector qualifications under AWS D1.5.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},648720,1792859044,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":22,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":144,"read_time":112},962090883568,"https://ap-avatar.wpscdn.com/davatar_a8503ba1806abce46bf441b54a3ca4cd","501.03  \n1 DIVISION 500-STRUCTURES 2  \n3  \n4 SECTION 501-STEEL STRUCTURES 5  \n6  \n7 501.01 Description. This section describes construction of steel structures and 8 steel structure portions of composite structures.  \n9  \n10 501.02 Materials.  \n11  \n12 Red Primer Paint 708.01(A) 13  \n14 Zinc Paints and Primers 708.02 15  \n16 Bearing Devices and Related Materials 712.09 17  \n18 Zinc Coating 712.10 19  \n20 Structural Steel 713.01 21  \n22 Welded Stud Shear Connectors 713.02 23  \n24 Steel Forgings and Steel Shafting 713.07 25  \n26 Steel Castings 713.08 27  \n28 Gray Iron Castings 713.09 29  \n30 Malleable Iron Castings 713.10 31  \n32 Standard Fasteners 718.01 33  \n34 High-Strength Bolts and Studs 718.02 35  \n36 501.03 Construction.  \n37  \n38 (A) Shop Plans. Submit detailed shop drawings required for steel  \n39 fabrication.  \n40  \n41 Prepare shop drawings on sheets 36 inches long by 22 inches wide.  \n42 Make 2-inch margin on left side of sheet and 1/2-inch margin on other three  \n43 sides. Locate title block in lower right hand corner of each sheet. Title  \n44 includes statement of contents of sheet, location of structure, project name,  \n45 and project number, if any.  \n46  \n47 Submit 6 sets of shop drawings for review. The Engineer will return  \n48 one set with comments and corrections. Make corrections and submit 10  \n501.03  \n49 prints of each revised drawing. Once the Engineer accepts shop drawings, 50 one set of accepted drawings will be returned to the Contractor. Prepare and  \n51 submit shop drawings at no increase in contract price or contract time.  \n52 Changes to accepted shop drawings without written consent of the Engineer  \n53 will not be allowed. Steel fabrication before shop drawing acceptance by the  \n54 Engineer will not be allowed.  \n55  \n56 Submit shop drawings not less than four weeks prior to fabrication.  \n57 Make corrections in a timely manner.  \n58  \n59 Shop drawings shall include the following: 60  \n61 (1) Details for connections not dimensioned in the contract  \n62 documents.  \n63  \n64 (2) Direction of rolling of plates where the contract documents  \n65 require specific orientation.  \n66  \n67 (3) Sequence and procedures.  \n68  \n69 (4) Location of butt-welded splices on layout drawing of entire  \n70 structure.  \n71  \n72 (5) Calculations and location of temporary supports and vertical  \n73 alignment of members at each stage of fabrication. 74  \n75 (6) Slip-critical connections and connections subject to direct  \n76 tension.  \n77  \n78 (7) Qualifications of welders in accordance with Section 5, Part B,  \n79 of AWS D1 .5.  \n80  \n81 (8) Qualifications of welding inspectors in accordance with Section  \n82 6, Part A, of AWS D1 .5.  \n83  \n84  \n501.03  \n84 (B) Required Prints and Reports. Submit drawings and reports in  \n85 accordance with Table 501.03-1-Submittal Requirements. 86  \n\n| TABLE 501.03-1 – SUBMITTAL REQUIREMENTS |  |  |\n| --- | --- | --- |\n| Item | Number of Sets Required | Furnish To |\n| Preliminary Shop Drawings | 6 | Engineer |\n| Final Shop Drawings | 10 | Engineer |\n| Mill Orders and Test Reports | 5 | Engineer |\n| Notice of Placing Shop Order | 2 | Engineer |\n| Notice of Beginning Shop Work | 3 | Shop Inspector |\n| Match Mark, Camber, and Erection Diagrams | 1 8 | Shop Inspector Engineer |\n| Shipping Statements | 1\u003Cbr>4 | Shop Inspector Engineer |\n| Report of Full-Size Tests | 1 6 | Shop Inspector Engineer |\n| Record of Annealing Charges | 6 | Engineer |\n\n87  \n88 (C) Mill and Shop Inspection. Give advance notice of shop and mill  \n89 work, and work locations to the Engineer so testing and inspectional  \n90 procedures may be prepared.  \n91  \n92 Furnish facilities for inspection of material and workmanship in mill and  \n93 shop. Allow inspectors free access to necessary parts of work. 94  \n95 When the Engineer requires test specimens or certifications, furnish  \n96 specimens and certifications at no increase in contract price or contract time. 97  \n98 (D) Shop Work and Fabrication. Keep structural mat","cbCaidCn02fc7BaL","https://ap.wps.com/l/cbCaidCn02fc7BaL","pdf",38547,12,"English","# 501.03 Construction\n## (A) Shop Plans\n## (B) Required Prints and Reports\n## (C) Mill and Shop Inspection\n## (D) Shop Work and Fabrication\n## (E) Erection","[{\"question\":\"What is covered by Section 501.03 Construction?\",\"answer\":\"It covers construction of steel structures and the steel portions of composite structures, including shop drawing submission, fabrication practices, inspection, welding, and erection requirements.\"},{\"question\":\"How are shop plans submitted and approved?\",\"answer\":\"Detailed shop drawings are submitted for steel fabrication, with 6 sets provided for review; one set is returned with comments and corrections, and corrected drawings are resubmitted until accepted.\"},{\"question\":\"What information must shop drawings include?\",\"answer\":\"Shop drawings must include details for undimensioned connections, plate rolling direction, sequence and procedures, location of butt-welded splices, fabrication calculations and temporary supports, slip-critical/tension connection notes, and welders and inspector qualifications under AWS D1.5.\"}]","501-STEEL STRUCTURES - Construction Submittal and Fabrication Requirements | PDF",1792794801]