[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-649231-105":59,"doc-detail-649231-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","3rd-spruce-rec-center-electrical-general-notes","3rd & Spruce Rec Center - Electrical General Notes","","Electrical general notes for an HVAC-related 3rd & Spruce Recreation Center project define contractor responsibilities and installation requirements. The notes specify compliance with applicable laws and the 2014 National Electrical Code (NEC/NFPA 70) and local AHJ amendments. They cover coordination among trades, grounding and bonding rules, provision and sizing of raceways and boxes, wiring and conduit sizing bases, use of new UL-listed labeled materials, fire-stopping and sealed penetrations, and procedures for deviations, verification, and system testing, balancing, and operation prior to acceptance.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/3rd-spruce-rec-center-electrical-general-notes/649231/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/3rd-spruce-rec-center-electrical-general-notes/649231.png","ImageObject",300,407,{"name":92,"@type":93},"Levi","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-31","2026-10-23",true,{"@type":102,"interactionType":103,"userInteractionCount":19},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"Which code and local authority requirements govern the electrical work?","Question",{"text":112,"@type":113},"All work must comply with applicable municipal, county, state, and federal regulations, including the 2014 edition of the National Electrical Code (NEC, NFPA 70), and requirements/amendments from the local authority having jurisdiction (AHJ).","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How are grounding and bonding requirements defined for branch circuits and equipment?",{"text":117,"@type":113},"Each feeder and branch circuit must include an insulated equipment grounding conductor, and electrical equipment, outlet boxes, and grounding-type receptacles must be bonded in accordance with NEC Article 250.",{"name":119,"@type":110,"acceptedAnswer":120},"What fire-stopping and penetration sealing procedures are required?",{"text":121,"@type":113},"All penetrations through rated ceilings, walls, roofs, and floors must be totally enclosed with an approved UL-listed fire stop sealant, with floor penetrations core-drilled, sleeved, and sealed. The contractor must submit documentation that the required sealant was installed per manufacturer requirements.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},649231,1792798154,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":19,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":34,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":143},7971461740909,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","5/13/2022 10:06:43 AM J :\\ACT IVE\\ 13 102 1 .00 1-HVAC D&C 3rd & Spruce Rec Center\\DWGS\\ CAD\\_E\\PHASE 2  \n\n| ELECTRICAL GENERAL NOTES:\u003Cbr>1. ALL WORK SHALL BE IN ACCORDANCE WITH ALL APPLICABLE LAWS, CODES, AND REGULATIONS ADOPTED BY MUNICIPAL, COUNTY, STATE, AND FEDERAL AUTHORITIES, INCLUDING THE 2014 EDITION OF THE NATIONAL ELECTRICAL CODE (NEC) NFPA 70, AND WITH THE REQUIREMENTS/AMENDMENTS OF THE LOCAL AUTHORITY HAVING JURISDICTION (AHJ) .\u003Cbr>2. CONTRACT DRAWINGS ARE DIAGRAMMATIC IN NATURE AND ARE\u003Cbr>INTENDED TO CONVEY SCOPE, DESIGN INTENT, AND GENERAL ARRANGEMENT ONLY. CONTRACTOR IS RESPONSIBLE FOR\u003Cbr>COORDINATING ALL WORK OF ALL TRADES INCLUDING\u003Cbr>RESOLUTION OF FIELD CONFLICTS THAT MAY ARISE.\u003Cbr>3. EACH FEEDER AND BRANCH CIRCUIT SHALL INCLUDE AN INSULATED EQUIPMENT GROUNDING CONDUCTOR. BOND ALL ELECTRICAL EQUIPMENT, OUTLET BOXES, GROUNDING TYPE RECEPTACLES, ETC. , IN ACCORDANCE WITH NEC ARTICLE 250.\u003Cbr>4. TROUGHS, JUNCTION AND PULL BOXES ARE NOT NECESSARILY\u003Cbr>INDICATED, BUT SHALL BE PROVIDED WHERE MANDATED BY THENEC, AND AS REQUIRED FOR EASE OF INSTALLATION. BOXES SHALL BE SIZED (MINIMUM) IN ACCORDANCE WITH NEC ARTICLE\u003Cbr>314. TROUGHS SHALL BE SIZED PER NEC ARTICLE 366.\u003Cbr>5. FEEDER AND BRANCH CIRCUIT WIRING ARE DEPICTED BY ASSIGNMENT OF CIRCUIT NUMBERS, INTERCONNECTING WIRING AND HOMERUNS, OR HOMERUNS ONLY (FOR SINGULAR LOADS) . ALL FEEDERS AND BRANCH CIRCUITS ARE NEW TO BE PROVIDED UNDER THIS CONTRACT UNLESS OTHERWISE NOTED. INTERIOR WIRING SHALL BE INSTALLED IN RIGID METALLIC CONDUIT AND/OREMT, 3/4\" MINIMUM. FLEXIBLE METAL CONDUIT, LIQUID-TIGHT FLEXIBLE METAL CONDUIT, MC CABLE SHALL BE UTILIZED IN LIMITED LENGTHS AS NECESSARY, OR AS REQUIRED/ALLOWED BY CODE.\u003Cbr>6. ALL NEW 600V OVER-CURRENT PROTECTIVE DEVICES SHALL HAVE INTERRUPTING CAPABILITIES OR RATINGS (AIC OR AIR) IN RMS\u003Cbr>AMPERES SYMMETRICAL. ALL DEVICES SHALL BE FULLY RATED FOR AVAILABLE FAULT CURRENT.\u003Cbr>7. ALL BUILDING WIRE SHALL BE COPPER CONDUCTORS, TYPE THHN/THWN-2 (DUAL LISTED) 90 DEGREE CELSIUS RATED INSULATION, \\#12 AWG MINIMUM. UTILIZE \\#10 AWG WIRE FOR ANY 15A OR 20A, 120V CIRCUIT THAT EXCEEDS 100 FEET FROM SOURCE TO LAST DEVICE OR OUTLET.\u003Cbr>8. CONTRACTOR SHALL PROVIDE AND INSTALL AN APPROVED, UL LISTED, FIRE STOP SEALANT, TOTALLY ENCLOSING ALL PENETRATIONS THROUGH RATED CEILINGS, WALLS, ROOFS, FLOORS, ETC. ALL FLOOR PENETRATIONS SHALL BE\u003Cbr>CORE-DRILLED, SLEEVED AND SEALED WITH AN APPROVED FIRE RATED SEALANT. CONTRACTOR SHALL SUBMIT LETTER TO OWNER THAT THE REQUIRED FIRE SEALANT WAS INSTALLED PER MANUFACTURER'S REQUIREMENTS. ALL EXISTING CERTIFIED AND NOTARIZED PENETRATIONS BETWEEN FLOORS AND WALLS MUST\u003Cbr>BE CLOSED TO MAINTAIN FIRE RATING.\u003Cbr>9. THE CONTRACTOR SHALL PERFORM THE WORK AS INDICATED ON THE DRAWINGS. ANY DEVIATIONS FROM THE DRAWINGS SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW AND APPROVAL IN WRITING. IF CHANGES ARE MADE WITHOUT THE ENGINEER'S WRITTEN CONSENT, THE CONTRACTOR SHALL BE LIABLE FOR ANY ISSUES THAT MAY ARISE DUE TO THE CHANGES.\u003Cbr>10. UNLESS OTHERWISE NOTED, ALL WIRE SIZES SHALL BE BASED ON THE FOLLOWING:\u003Cbr>a. \\#12 THROUGH \\#1 OR 100A OR LESS-NEC TABLE 310.16 60° COLUMN\u003Cbr>b. \\#1/0 AND GREATER OR 101A OR GREATER-NEC TABLE 310.16 75° COLUMN\u003Cbr>c. OTHER ALLOWANCES OF NEC 110. 14(C)\u003Cbr>12. UNLESS OTHERWISE NOTED, ALL CONDUIT SIZES SHALL BE BASED ON EMT, RMC, OR RNC (PVC SCHEDULE 40) .\u003Cbr>13. ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES, AND EQUIPMENT SHALL BE NEW, LABELED AND LISTED BY A NATIONALLY RECOGNIZED TESTING LABORATORY OR AGENCY (E.G. UL), UNLESS OTHERWISE NOTED.\u003Cbr>14. ELECTRICAL CONTRACTOR SHALL FOLLOW ALL MANUFACTURER'S INSTRUCTIONS FOR INSTALLATION OF ALL EQUIPMENT IF NOT INDICATED ON DRAWINGS. IF THERE IS A DISCREPANCY, MANUFACTURER'S INSTRUCTIONS TAKE PRECEDENCE.\u003Cbr>15. THE ELECTRICAL CONTRACTOR SHALL FURNISH ALL EQUIPMENT, LABOR, SERVICES, AND MATERIALS REQUIRED FOR COMPLETE INSTALLATION OF THE WORK INDICATED. UNLESS OTHERWISE NOTED, ALL MATERIALS SHALL BE NEW.\u003Cbr>16. DO NOT SCALE DRAWINGS. CONTRACTOR SHALL V","cbCaisgzR0df6Fmk","https://ap.wps.com/l/cbCaisgzR0df6Fmk","pdf",479252,"English","# Electrical General Notes\n## General code and coordination requirements\n## Grounding, bonding, and conductor requirements\n## Raceways, boxes, and wiring depiction rules\n## Circuit protection and material listing requirements\n## Fire-stopping and penetration sealing requirements\n## Deviations, verification, and testing requirements","[{\"question\":\"Which code and local authority requirements govern the electrical work?\",\"answer\":\"All work must comply with applicable municipal, county, state, and federal regulations, including the 2014 edition of the National Electrical Code (NEC, NFPA 70), and requirements/amendments from the local authority having jurisdiction (AHJ).\"},{\"question\":\"How are grounding and bonding requirements defined for branch circuits and equipment?\",\"answer\":\"Each feeder and branch circuit must include an insulated equipment grounding conductor, and electrical equipment, outlet boxes, and grounding-type receptacles must be bonded in accordance with NEC Article 250.\"},{\"question\":\"What fire-stopping and penetration sealing procedures are required?\",\"answer\":\"All penetrations through rated ceilings, walls, roofs, and floors must be totally enclosed with an approved UL-listed fire stop sealant, with floor penetrations core-drilled, sleeved, and sealed. The contractor must submit documentation that the required sealant was installed per manufacturer requirements.\"}]","3rd & Spruce Rec Center - Electrical General Notes | PDF",18]