[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-457994-105":59,"doc-detail-457994-en":129},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":64,"keywords":65,"description":66,"schema_data":67,"social_meta":122,"head_meta":124,"extra_data":126,"updated_unix":128},105,"en","26_01_00","","This section defines UMCP Design Standards for inspection and electrical testing requirements for medium-voltage level systems. It specifies that inspection and testing must be performed by an independent testing agency whose work is coordinated with, and paid for by, the construction contractor. The testing agency must supply labor, equipment, supervision, insurance, and perform acceptance testing activities including load surveys, calibration, relay adjustments, PCB sampling, ground resistance tests, and transformer and high-voltage apparatus testing. It also sets effective date and required regulatory and safety standards.",{"@graph":68,"@context":121},[69,83,104],{"@type":70,"itemListElement":71},"BreadcrumbList",[72,76,78,81],{"item":73,"name":74,"@type":75,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":77,"name":9,"@type":75,"position":14},"https://docshare.wps.com/document/",{"item":79,"name":30,"@type":75,"position":80},"https://docshare.wps.com/document/technology/",3,{"item":82,"name":64,"@type":75,"position":19},"https://docshare.wps.com/document/26_01_00/457994/",{"url":82,"name":64,"@type":84,"image":85,"author":90,"headline":64,"publisher":93,"fileFormat":96,"inLanguage":63,"description":66,"dateModified":97,"datePublished":98,"encodingFormat":96,"isAccessibleForFree":99,"interactionStatistic":100},"DigitalDocument",{"url":86,"@type":87,"width":88,"height":89},"https://docshare.wps.com/thumbnails/26_01_00/457994.png","ImageObject",300,407,{"name":91,"@type":92},"Indoniesian Boy","Person",{"url":73,"name":94,"@type":95},"DocShare","Organization","application/pdf","2026-10-13","2026-09-30",true,{"@type":101,"interactionType":102,"userInteractionCount":29},"InteractionCounter",{"@type":103},"ViewAction",{"@type":105,"mainEntity":106},"FAQPage",[107,113,117],{"name":108,"@type":109,"acceptedAnswer":110},"Who must perform the inspection and testing for medium-voltage systems?","Question",{"text":111,"@type":112},"Inspection and testing must be performed by an independent testing agency.","Answer",{"name":114,"@type":109,"acceptedAnswer":115},"What is required from the construction contractor before testing begins?",{"text":116,"@type":112},"The construction contractor must submit documentation supporting the testing agency’s qualifications and obtain written approval before entering a contract or initiating any testing.",{"name":118,"@type":109,"acceptedAnswer":119},"What qualifications must the testing agency meet?",{"text":120,"@type":112},"The testing firm must meet federal OSHA accreditation criteria, have qualified registered professional electrical engineering oversight, employ properly certified testing team members, and be corporately and financially independent from manufacturers and related parties.","https://schema.org",{"og:url":82,"og:type":123,"og:title":64,"og:site_name":94,"og:description":66},"article",{"robots":125,"canonical":82},"index,follow",{"doc_id":127,"site_id":62},457994,1791158436,{"code":4,"msg":5,"data":130},{"doc_id":127,"user_id":131,"nickname":91,"user_avatar":132,"doc_module":4,"category_id":29,"category_name":30,"doc_title":64,"doc_description":66,"doc_content":133,"file_id":134,"file_url":135,"file_type":136,"file_size":137,"view_count":29,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":34,"language":138,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":139,"faqs":140,"seo_title":141,"seo_description":66,"update_tm":142,"read_time":143},962090760608,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","Description:  \nThe purpose of the section is to highlight the current applicable UMCP Design Standards for the Inspection and testing requirements of medium voltage level systems.  \nRelated Sections:  \n• TBD  \nEffective Date:  \nJuly 10, 2009  \nApplicable Standards:  \n• NETA- International Electrical Testing Association  \n• NICET-National Institute for Certification in Engineering Technologies  \n• Federal OSHA criteria for Accreditation of testing laboratories, Title 29, PARTS 1907, 1910, and 1936  \n• All work shall be performed in accordance with applicable regulations of the  \n• Occupational Safety and Health Administration (OSHA)  \n• Maryland Occupational Safety and Health Administration  \n• National Fire Protection Association-NFPA 70E  \n• ANSI-C2 National Electrical Safety Code and the American National Standards for Personnel Protection  \nGeneral Requirements:  \nThe inspection and testing of medium voltage components shall be performed by an independent testing agency. The inspection and testing shall be applied for, coordinated and paid by the construction contractor.  \nThe testing agency shall furnish all labor, materials, equipment, supervision, and insurance necessary to provide electrical acceptance testing including load surveys, power line disturbance studies, calibration and adjustment of relays, PCB sampling, ground resistance tests, transformer tap adjustments and testing on high voltage apparatus such as cables, switchgear, and transformers at the University of Maryland installations on demand.  \n1. Submittal Requirements:  \nThe construction contractor shall submit the following to the Department of Capital Projects and get approval in writing prior to entering into a contract with the testing agency or initiating any testing.  \n• Documentation supporting the testing agency qualifications  \n• The name(s) and certifications of the members of the testing teams.  \n• The name and State of Maryland registration number of the registered electrical engineer responsible for testing and evaluation of the test data.  \n• Certificate of the testing firm's insurance containing evidence of the \"Hold Harmless\" clause protecting the University of Maryland from all, suits, actions or claims.  \n2. Qualifications of Testing Agency:  \nTesting Agency shall be limited to any firm, company, or corporation in the electrical testing industry providing the following qualifications are met:  \n• They shall be regularly engaged in the technical testing, maintenance, and repair of electrical materials, devices, appliance, electrical installation, and systems for the purpose of preventing injury to persons or damage to property and other equipment. This type of business shall constitute the firm's principal source of revenue. Equipment installation and/or services normally performed by manufacturers, contractors, consulting firms, producers, suppliers, vendors or installer shall constitute less than twentyfive percent (25%) of total revenue.  \n• The testing firm shall meet federal OSHA criteria for Accreditation of testing laboratories, Title 29, PARTS 1907, 1910, and 1936.  \n• They shall be engaged in such practice for a minimum of two (2) years and must have a minimum of one  \n(1) registered professional electrical engineer, licensed in the State of Maryland who has been regularly engaged in over 600 volt acceptance testing for a periods of not less than five (5) years and shall be responsible for all phases of testing and maintaining electrical power systems including short circuit analysis, protection coordination studies, and the evaluation of test and maintenance data. The engineershall review and evaluate all results and issue a certified test report.  \n• Any company with fewer than twelve (12) test technicians may meet the professional Engineer requirement by contracting with a State of Maryland registered Professional Engineer for review of all short circuit studies, overcurrent coordination studies, and other engineering reports, w","cbCainS72iFomX2z","https://ap.wps.com/l/cbCainS72iFomX2z","pdf",525327,"English","# Effective Date\n# Applicable Standards\n# General Requirements\n## Inspection and Testing Responsibility\n## Scope of Testing Services\n# Submittal Requirements\n# Qualifications of Testing Agency","[{\"question\":\"Who must perform the inspection and testing for medium-voltage systems?\",\"answer\":\"Inspection and testing must be performed by an independent testing agency.\"},{\"question\":\"What is required from the construction contractor before testing begins?\",\"answer\":\"The construction contractor must submit documentation supporting the testing agency’s qualifications and obtain written approval before entering a contract or initiating any testing.\"},{\"question\":\"What qualifications must the testing agency meet?\",\"answer\":\"The testing firm must meet federal OSHA accreditation criteria, have qualified registered professional electrical engineering oversight, employ properly certified testing team members, and be corporately and financially independent from manufacturers and related parties.\"}]","26_01_00 | PDF",1790751223,18]