[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-662741-105":3,"detail-sidebar-cat-0-en-105":83,"doc-detail-662741-en":133},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":76,"head_meta":78,"extra_data":80,"updated_unix":82},105,"en","2023-drawing-checklist-for-industrial-tenant-improvements","2023 Drawing Checklist for Industrial Tenant Improvements","","This document provides a comprehensive regulatory checklist for permit drawing submissions related to industrial tenant improvements in the City of Abbotsford. It delineates the specific technical requirements for site plans, including building locations and parking calculations compliant with the Abbotsford Zoning Bylaw. Detailed floor plan requirements cover demolition, suite layouts, reflected ceiling plans, fire separations, accessibility, and occupant load calculations. Furthermore, it outlines cross-section specifications for wall and ceiling heights, fire assemblies, and exterior elevation requirements when applicable. This structured guide serves as an essential resource for architects, contractors, and business owners to ensure full compliance with municipal building standards during the design and permitting phase of industrial renovation projects. Adherence to these guidelines facilitates efficient review processes and promotes safety in commercial and industrial facility modifications.",{"@graph":14,"@context":75},[15,34,54],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/general/","General",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/2023-drawing-checklist-for-industrial-tenant-improvements/662741/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":48,"encodingFormat":47,"isAccessibleForFree":49,"interactionStatistic":50},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/2023-drawing-checklist-for-industrial-tenant-improvements/662741.png","ImageObject",300,407,{"name":42,"@type":43},"jay","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-28",true,{"@type":51,"interactionType":52,"userInteractionCount":4},"InteractionCounter",{"@type":53},"ViewAction",{"@type":55,"mainEntity":56},"FAQPage",[57,63,67,71],{"name":58,"@type":59,"acceptedAnswer":60},"What must be included in a site plan for a permit submission?","Question",{"text":61,"@type":62},"A site plan must include a north arrow, street name, building location, adjacent building locations, the specific suite location, and parking calculations compliant with Section 150 of the Abbotsford Zoning Bylaw.","Answer",{"name":64,"@type":59,"acceptedAnswer":65},"When are parking calculations required?",{"text":66,"@type":62},"Parking calculations are required for all new restaurants, assembly occupancies, or any change of occupancy that proposes an increased occupant load.",{"name":68,"@type":59,"acceptedAnswer":69},"What information is required for a floor plan?",{"text":70,"@type":62},"Floor plans must include a demolition plan, proposed suite layout with dimensions and labels, reflected ceiling plans, fire and suite separations, door and window details, travel distances to exits, accessibility features, and calculations for occupant loads and washroom fixtures.",{"name":72,"@type":59,"acceptedAnswer":73},"Under what conditions are elevation drawings required?",{"text":74,"@type":62},"Elevation drawings are required only if the proposed project involves exterior alterations to the building.","https://schema.org",{"og:url":32,"og:type":77,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":79,"canonical":32},"index,follow",{"doc_id":81,"site_id":7},662741,1793222211,{"code":4,"msg":84,"data":85},"success",[86,90,94,98,103,108,113,118,123,126,130],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":87,"show_sort_weight":88,"slug":89},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":91,"show_sort_weight":92,"slug":93},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":95,"show_sort_weight":96,"slug":97},"Exam",70,"exam",{"id":99,"doc_module":4,"doc_module_name":25,"category_name":100,"show_sort_weight":101,"slug":102},5,"Comic",60,"comic",{"id":104,"doc_module":4,"doc_module_name":25,"category_name":105,"show_sort_weight":106,"slug":107},6,"Technology",50,"technology",{"id":109,"doc_module":4,"doc_module_name":25,"category_name":110,"show_sort_weight":111,"slug":112},7,"Healthcare",40,"healthcare",{"id":114,"doc_module":4,"doc_module_name":25,"category_name":115,"show_sort_weight":116,"slug":117},8,"Research & Report",30,"research-report",{"id":119,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":121,"slug":122},9,"Religion & Spirituality",20,"religion-spirituality",{"id":121,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":121,"slug":125},"World Cup","world-cup",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":127,"slug":129},10,"Lifestyle","lifestyle",{"id":131,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":99,"slug":132},19,"general",{"code":4,"msg":84,"data":134},{"doc_id":81,"user_id":135,"nickname":42,"user_avatar":136,"doc_module":4,"category_id":131,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":137,"file_id":138,"file_url":139,"file_type":140,"file_size":141,"view_count":4,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":22,"language":142,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":143,"faqs":144,"seo_title":145,"seo_description":12,"update_tm":82,"read_time":26},3985747858866,"https://ap-avatar.wpscdn.com/davatar_a8503ba1806abce46bf441b54a3ca4cd","Civic Address:    \nThe checklist below outlines the information required to be included on the permit drawing submission.  \nSite Plan  \n􀂆 North arrow  \n􀂆 Street name indicated  \n􀂆 Building location  \n􀂆 Location of all existing adjacent buildings  \n􀂆 Location of suite indicated within building  \n􀂆 Parking calculations in compliance with Abbotsford Zoning Bylaw (Section 150) -Required for all new restaurants, assembly occupancies or any change of occupancy proposing an increased occupant load.  \nFloor Plan  \n􀂆 Demolition plan (existing layout before proposed changes)  \n􀂆 Proposed suite layout (drawn to scale, fully dimensioned and all rooms labelled)  \n􀂆 Reflected Ceiling plan (T-bar layout, light fixture locations, diffuser locations, etc.)  \n􀂆 Identify required fire separations and suite separations  \n􀂆 Show all door and window locations and sizes  \n􀂆 Show travel distances to all required exits or means of egress  \n􀂆 Accessibility requirements for persons with disabilities shown  \n􀂆 Occupant Load calculations shown  \n􀂆 Washroom fixture calculations shown  \n􀂆 Adjacent occupancies labelled  \nCross Section  \n􀂆 Wall and Ceiling heights  \n􀂆 Identify the adjacent occupancies (above and below in a multi-storey building)  \n􀂆 Identify required fire separations and suite separations  \n􀂆 Provide any assembly details and specifications for all walls, floors, and ceilings affected or included in the scope of work  \nElevations (only required if exterior alterations proposed)  \n􀂆 Planning Approval required","cbCaiiuQLtv6qAYL","https://ap.wps.com/l/cbCaiiuQLtv6qAYL","pdf",105233,"English","# Site Plan\n## Site Plan Requirements\n# Floor Plan\n## Floor Plan Requirements\n# Cross Section\n## Cross Section Requirements\n# Elevations\n## Exterior Alteration Requirements","[{\"question\":\"What must be included in a site plan for a permit submission?\",\"answer\":\"A site plan must include a north arrow, street name, building location, adjacent building locations, the specific suite location, and parking calculations compliant with Section 150 of the Abbotsford Zoning Bylaw.\"},{\"question\":\"When are parking calculations required?\",\"answer\":\"Parking calculations are required for all new restaurants, assembly occupancies, or any change of occupancy that proposes an increased occupant load.\"},{\"question\":\"What information is required for a floor plan?\",\"answer\":\"Floor plans must include a demolition plan, proposed suite layout with dimensions and labels, reflected ceiling plans, fire and suite separations, door and window details, travel distances to exits, accessibility features, and calculations for occupant loads and washroom fixtures.\"},{\"question\":\"Under what conditions are elevation drawings required?\",\"answer\":\"Elevation drawings are required only if the proposed project involves exterior alterations to the building.\"}]","2023 Drawing Checklist for Industrial Tenant Improvements | PDF"]