[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-649653-105":59,"doc-detail-649653-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","2012-standards-manual-fiber-optic-engineering-construction-and-maintenance-standards-customer-construction","2012 Standards Manual - Fiber Optic Engineering, Construction and Maintenance Standards - Customer Construction","","2012 Standards Manual for Union Pacific Railroad Company establishes engineering, construction, and maintenance standards for fiber optic customer construction and associated work practices. It covers administrative procedures for initial contact and planning new fiber optic construction on the railroad right-of-way, then outlines the engineering process including plan submittals and notifications. The manual further defines project safety requirements, emergency response planning, PPE, work near tracks, flagging/protection, design, drawings, construction, fire prevention and hot work, equipment, power-line work, excavation, trenchless installation, housekeeping, bridges, weather, and documentation.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/2012-standards-manual-fiber-optic-engineering-construction-and-maintenance-standards-customer-construction/649653/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/2012-standards-manual-fiber-optic-engineering-construction-and-maintenance-standards-customer-construction/649653.png","ImageObject",300,407,{"name":92,"@type":93},"CatatanPagi","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-28","2026-10-24",true,{"@type":102,"interactionType":103,"userInteractionCount":24},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What is the purpose of the 2012 Fiber Optic Standards Manual?","Question",{"text":112,"@type":113},"It defines standards for fiber optic customer construction and the associated work practices for Union Pacific Railroad Company.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"Which stages are covered in the engineering process?",{"text":117,"@type":113},"The manual covers planning, plan submittals, and required notifications as part of the engineering process.",{"name":119,"@type":110,"acceptedAnswer":120},"What safety topics are included for fiber optic cable system construction?",{"text":121,"@type":113},"It includes general project safety, emergency response planning, personal protective equipment, work near tracks with train movement, railroad flagging/protection, fire prevention and hot work processes, and work near power lines.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},649653,1792930585,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":24,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145},962090894170,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","Union Pacific Railroad Company  \n2012 Standards Manual  \nFiber Optic Engineering, Construction and Maintenance Standards  \nThese standards are developed for fiber optic customer construction and associated work practices. To access this manual online visit Telecom/Fiber Optic/SAFT under the About Us section on [www.up.com](www.up.com)  \nCall Before You Dig: 1-800-336-9193  \nUNION PACIFIC RAILROAD COMPANY  \nFiber Optics & Asset Utilization Group  \n1400 Douglas Street – Mail Stop 0640  \nOmaha, NE 68179  \nADMINISTRATION & CONSTRUCTION  REGIONAL CONSTRUCTION  \nCOORDINATORS  \nCRAIG JOHNSTON MIKE ARGO RON CHRISTENSEN  \nDIRECTOR FIBER OPTICS & ASSET UTILIZATION SOUTHERN LA, EASTERN TX CENTRAL CA, NORTHERN CA  \nMAIL STOP 0640 (402) 501-4568 C (832) 984-4406 NORTHERN NV, NORTHERN UT  \n(402) 544-0574 C (402) 203-3292  MICHAELARGO@UP.COM (402) 501-4053 C (530) 521-1045  \nCRAIGJOHNSTON@UP.COM   RLCHRIS1@UP.COM  \nMIKE SHALLOW BOB GIERY STEVE HEWITT JEFF OSTHUS  \nSR. MANAGER FIBER OPTICS & INFORMATION TECHNOLOGY WA, OR, ID, MT, NORTHERN UT EAST NE, KS, MO, WESTERN IA  \nASSET UTILIZATION SYSTEMS CONSULTANT (402) 501-4574 C (503) 708-9780 NORTHERN AR, NORTHERN OK  \nMAIL STOP 0640 MAIL STOP 0640  SAHEWITT@UP.COM  (402) 544-0559 C (402) 312-4999  \n(402) 544-0570 C (402) 290-9419 (402) 544-7425 C (402) 203-3719  JLOSTHUS@UP.COM  \nMIKESHALLOW@UP.COM  RWGIERY@UP.COM  \nWIRELESS & PROPERTY MANAGEMENT  \nTIM NEUMAIER PHIL STEVENSON  \nMIKE WALLMAN THOMAS (TOM) MCGOVERN AZ, NM SOUTHERN CA, SOUTHERN NV  \nASSOCIATE SYSTEMS ENGINEER PROJECT ENGINEER (520) 629-2148 C (520) 730-2257 (402) 501-4570 C (805) 312-6733  \nMAIL STOP 0640 MAIL STOP 0640  TNEUMAIER@UP.COM  PASTEVENSON@UP.COM  \n(402) 544-0577 C (402) 415-9877 (402) 544-6090 C (402) 871-4005  \nMWALLMAN@UP.COM   TMCGOVERN@UP.COM CLARENCE STYVAR DON (TOBY) TOBIAS  \nCO, WY, CENTRAL UT, WEST NE WI, IL, MN, EASTERN IA  \n(402)501-4571 C (402) 203-8732 (402) 501-4572 C (214) 707-1271  \nCLSTYVAR@UP.COM   DJTOBIAS@UP.COM  \nENGINEERING  \nBILL J. WRIGHT STEVE WAITS  \nSOUTHERN TX, WESTERN TX NORTHERN TX, NOUTHERN LA  \nMICHAEL HEALD (402) 501-4575 C (314) 422-3217 SOUTHERN AR, SOUTHERN OK  \nSR. SYSTEMS ENGINEER  BJWRIGHT @UP.COM (402) 501-4573 C (903) 235-9604  \nMAIL STOP 0640  STEVEWAITS@UP.COM  \n(402) 544-3719 C (402) 740-2972  \nMCHEALD@UP.COM  \nPAUL PINO  \nPROJECT ENGINEER MAIL STOP 0640  \n(402) 544-3582 C (402) 203-6021  \nPAULPINO@UP.COM  \nTABLE OF CONTENTS  \n1 INITIAL CONTACT: ADMINISTRATIVE PROCEDURES................................ 2  \n1.1 PROCEDURES FOR THE PLANNING OF NEW FIBER OPTIC CONSTRUCTION UTILIZING UNION PACIFIC RAILROAD COMPANY RIGHT-OF-WAY............................................................2  \n2 ENGINEERING PROCESS ....................................................................................... 3  \n2.1 PLAN SUBMITTALS ..........................................................................................................................3  \n2.2 NOTIFICATIONS: ...............................................................................................................................3  \n3 PROJECT SAFETY, PLAN, DESIGN AND CONSTRUCTION OF FIBER OPTIC CABLE SYSTEMS ..................................................................................................... 4  \n3.1 GENERAL PROJECT SAFETY ..........................................................................................................4  \n3.2 EMERGENCY RESPONSE PLAN .....................................................................................................7  \n3.3 PERSONAL PROTECTIVE EQUIPMENT.........................................................................................8  \n3.4 TRAIN MOVEMENT AND WORKING NEAR TRACKS ................................................................9  \n3.5 RAILROAD FLAGGING/PROTECTION ......................................................................................... 10  \n3.6 PLANNING ...............................................................................","cbCailDmwXxvGjAu","https://ap.wps.com/l/cbCailDmwXxvGjAu","pdf",1364273,72,"English","# TABLE OF CONTENTS\n## 1 INITIAL CONTACT: ADMINISTRATIVE PROCEDURES\n## 1.1 PROCEDURES FOR THE PLANNING OF NEW FIBER OPTIC CONSTRUCTION UTILIZING UNION PACIFIC RAILROAD COMPANY RIGHT-OF-WAY\n## 2 ENGINEERING PROCESS\n## 2.1 PLAN SUBMITTALS\n## 2.2 NOTIFICATIONS\n## 3 PROJECT SAFETY, PLAN, DESIGN AND CONSTRUCTION OF FIBER OPTIC CABLE SYSTEMS\n## 3.1 GENERAL PROJECT SAFETY\n## 3.2 EMERGENCY RESPONSE PLAN\n## 3.3 PERSONAL PROTECTIVE EQUIPMENT\n## 3.4 TRAIN MOVEMENT AND WORKING NEAR TRACKS\n## 3.5 RAILROAD FLAGGING/PROTECTION\n## 3.6 PLANNING\n## 3.7 DESIGN (General Requirements)\n## 3.8 DRAWINGS\n## 3.9 CONSTRUCTION\n## 3.10 GENERAL FIRE PREVENTION SAFETY and HOT WORK PROCESSES\n## 3.11 WORK EQUIPMENT\n## 3.12 WOKING NEAR POWER LINES\n## 3.13 TRENCHES AND EXCAVATIONS\n## 3.14 TRENCHLESS INSTALLATION OF FIBER SYSTEMS\n## 3.15 HOUSEKEEPING\n## 3.16 BRIDGES AND ABOVE GROUND INSTALLATIONS\n## 3.17 WEATHER\n## 3.18 REPEATER STATIONS (REGENS)\n## 4 DIG SAFELY – LOCATE ACCURATELY\n## 5 DOCUMENTATION\n## 5.1 DESIGNER REQUIREMENTS","[{\"question\":\"What is the purpose of the 2012 Fiber Optic Standards Manual?\",\"answer\":\"It defines standards for fiber optic customer construction and the associated work practices for Union Pacific Railroad Company.\"},{\"question\":\"Which stages are covered in the engineering process?\",\"answer\":\"The manual covers planning, plan submittals, and required notifications as part of the engineering process.\"},{\"question\":\"What safety topics are included for fiber optic cable system construction?\",\"answer\":\"It includes general project safety, emergency response planning, personal protective equipment, work near tracks with train movement, railroad flagging/protection, fire prevention and hot work processes, and work near power lines.\"}]","2012 Standards Manual - Fiber Optic Engineering, Construction and Maintenance Standards - Customer Construction | PDF",1792803188,181]