[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-648046-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-648046-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","2-2-3-basic-design-drawings-road-section-new-abay-bridge","2-2-3 Basic Design Drawings - Road Section - New Abay Bridge","","Road Section and New Abay Bridge drawing schedules are provided under the heading “2-2-3 Basic Design Drawings.” The document lists drawing sheets for plan/longitudinal profiles, standard cross sections for the Dejen urban area and gorge sections, and a bus terminal plan, alongside road structure drawings and traffic safety facility drawings. It also includes a New Abay Bridge set with general view, curved-section super-structure drawing, and structural drawings for A1, P1, P2–P3 piers, A2 abutments, plus revetment detailing for specific pier locations. Sheet numbers and counts are tabulated, with dates indicated as May 2004.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/2-2-3-basic-design-drawings-road-section-new-abay-bridge/648046/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/2-2-3-basic-design-drawings-road-section-new-abay-bridge/648046.png","ImageObject",300,407,{"name":42,"@type":43},"Oliver","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-11-02","2026-10-23",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",7,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What drawing sets are listed in “2-2-3 Basic Design Drawings”?","Question",{"text":63,"@type":64},"The document lists two sets: (1) Road Section and (2) New Abay Bridge.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"Which road items are covered under Road Section?",{"text":68,"@type":64},"Road Section includes plan/longitudinal profile sheets, standard cross sections for Dejen urban area and gorge sections, a bus terminal plan, road structures (1)-(2), and traffic safety facilities (1)-(2).",{"name":70,"@type":61,"acceptedAnswer":71},"What components are shown for the New Abay Bridge?",{"text":72,"@type":64},"New Abay Bridge drawings include a general view, super-structure drawing on a curved section, structural drawings for A1 abutment, P1 abutment, P2–P3 piers, A2 abutment, and revetment drawings for P2 and P3 piers.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},648046,1792791890,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,106,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":102,"doc_module":4,"doc_module_name":25,"category_name":103,"show_sort_weight":104,"slug":105},6,"Technology",50,"technology",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":97,"slug":129},19,"General","general",{"code":4,"msg":82,"data":131},{"doc_id":79,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":117,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":80,"read_time":104},8796095461610,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","# 2-2-3 Basic Design Drawings\n\n## (1)  Road Section\n\nList of Drawings  \n\n| Sheet No.   | Title of Each Drawing   | Number of Sheets   |\n| --- | --- | --- |\n| 1-23   | Plan/Longitudinal Profile   | 23   |\n| 24   | Dejen Urban Area:Standard Cross Section   | 1   |\n| 25-27   | Gorge Section:Standard Cross Section(standard type),  \u003Cbr>(reduced type-1),(reduced type-2)   | 3   |\n| 28   | Bus Terminal:Plan   | 1   |\n| 29-30   | Road Structures(1)-(2)   | 2   |\n| 31-32   | Traffic safety facilities(1)-(2)   | 2   |\n\n## (2)  New Abay Bridge\n\nList of Drawings  \n\n| Sheet No.   | Title of Each Drawing   | Number of Sheets   |\n| --- | --- | --- |\n| 33   | General View   | 1   |\n| 34   | Super-Structure Drawing on Curved Section   | 1   |\n| 35   | Structural Drawing of A1 Abutment   | 1   |\n| 36   | Structural Drawing of P1 Abutment   | 1   |\n| 37   | Structural Drawing of P2 and P3 Piers   | 1   |\n| 38   | Structural Drawing of A2 Abutment   | 1   |\n| 39   | Revetment Drawing for P2 and P3 Piers   | 1   |\n\n2-69  \n2400.00  \n2200.oo  \n2000.00  \n\n|  |  |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| ETHOPIA ROAD AUTHORLTY TIE FEDERAL  \u003Cbr>DEMOCRATC REPUBLC OF ETHOPA   | THE PROJECT FOR REHABILTATION OF  \u003Cbr>TRUNK ROAD PHASEⅢ  \u003Cbr>N  \u003Cbr>THE FEDERAL DEMOCRATIC REPUBLUC OF ETHOPA   | ORIEMTALCONSULTANTS CO,LTD  \u003Cbr>NASSOCATION WITH  \u003Cbr>JAPAN ENGNEEEING CONSULTANTS CO,LTD   | Plan Profile(1/23)   | SCALE   | ETHOP ROAD ATHOETY  \u003Cbr>TMEFEDEMLDEMOOMT  \u003Cbr>EUED OFENOPM   |  | ORETL COWSLTMTS  \u003Cbr>00LTD  \u003Cbr>NA5S00ATONTM  \u003Cbr>JPM  \u003Cbr>00NSLTJTS 00LTD   | 距VE   | DATE   | SHET NO   |\n|  |  |  |  | showm   |  |  |  |  | May 2004   | 1   |\n|  |  |  |  |  |  | DMTE  \u003Cbr>04.05.\\#\\#   |  | DATE  \u003Cbr>04.05.\\#\\#   |  |  |\n\n2-70  \n2000.00  \n\n| DL=1800.00   |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| Gradient   | 95e   | en   |  |  |  |  |  |  |  |  |  | a  \u003Cbr>14   |  |  |  |  |  |  |  |  | 1.03   | g  \u003Cbr>75   |  |  |  |  |  |  | 蓄   |  |  |\n|  |  | 场  \u003Cbr>则   |  |  |  |  |  |  |  |  |  | 墙驾  \u003Cbr>图   |  |  |  |  |  |  |  |  |  | 2  \u003Cbr>s   |  |  |  |  |  |  |  |  |  |\n| Proposed Hight   |  | 9p  \u003Cbr>哦%   |  |  |  | 酸   |  | 照   |  | 54   |  |  | 离整   |  |  | 25e   |  |  |  |  |  | 薜翻   | 和2   |  |  | 出   |  |  | 辆期   |  |  |\n| Ground Hight   | 攒  \u003Cbr>知  \u003Cbr>H  \u003Cbr>鹿要   |  |  |  |  |  |  |  |  |  | 8算   |  |  |  | 382   |  |  |  |  |  |  | 邓  \u003Cbr>上巴  \u003Cbr>2%   |  |  |  |  |  |  |  |  |  |\n| Station No.   | +70   |  | +800   | 006+   | ◎2   |  |  |  | +100   |  | 002+   |  |  | 00E+   |  |  | +400   | 00S+   | 009+   | +700   |  | +800   |  | 006+   | □+   |  | +100   | 002+   |  | +300   | +400   |\n\n|  |  |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| ETHOPIA ROAD AUTHORLTY TIE FEDERAL  \u003Cbr>DEMOCRATC REPUBLC OF ETHOPA   | THE PROJECT FOR REHABILTATION OF  \u003Cbr>TRUNK ROAD PHASEⅢ  \u003Cbr>N  \u003Cbr>THE FEDERAL DEMOCRATIC REPUBLUC OF ETHOPA   | ORIEMTALCONSULTANTS CO,LTD  \u003Cbr>NASSOCATION WITH  \u003Cbr>JAPAN ENGNEEEING CONSULTANTS CO,LTD   | Plan-Profile(2/23)   | SCALE   | ETHOP ROAD ATHOETY  \u003Cbr>TMEFEDEMLDEMOOMT  \u003Cbr>EUBC OFEMOPM   |  | OREBTLCOMsLTMTS  \u003Cbr>0LTD  \u003Cbr>NASS0GATOY IM  \u003Cbr>JPMBOE箱  \u003Cbr>0DASLTAJTS 0QLTD   | 吧VE   | DATE   | SHEET NO   |\n|  |  |  |  | shoun   |  |  |  |  | May 2004   | 2   |\n|  |  |  |  |  |  | DATE  \u003Cbr>04.05.\\#\\#   |  | DATE  \u003Cbr>04.05.\\#\\#   |  |  |\n\n2-71  \n2000.00                                                                                                                                           \n\n|  |  |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| ETHOPIA ROAD AUTHORLTY TIE FEDERAL  \u003Cbr>DEMOCRATC REPUBLC OF ETHOPA   | THE PROJECT FOR REHAB","cbCainUD5Hxh0eSJ","https://ap.wps.com/l/cbCainUD5Hxh0eSJ","pdf",9177819,"English","# 2-2-3 Basic Design Drawings\n## (1) Road Section\n## (2) New Abay Bridge","[{\"question\":\"What drawing sets are listed in “2-2-3 Basic Design Drawings”?\",\"answer\":\"The document lists two sets: (1) Road Section and (2) New Abay Bridge.\"},{\"question\":\"Which road items are covered under Road Section?\",\"answer\":\"Road Section includes plan/longitudinal profile sheets, standard cross sections for Dejen urban area and gorge sections, a bus terminal plan, road structures (1)-(2), and traffic safety facilities (1)-(2).\"},{\"question\":\"What components are shown for the New Abay Bridge?\",\"answer\":\"New Abay Bridge drawings include a general view, super-structure drawing on a curved section, structural drawings for A1 abutment, P1 abutment, P2–P3 piers, A2 abutment, and revetment drawings for P2 and P3 piers.\"}]","2-2-3 Basic Design Drawings - Road Section - New Abay Bridge | PDF"]