[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-648350-105":59,"doc-detail-648350-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","1x800-mw-supercritical-thermal-power-project-section-a-scope-of-work","1X800 MW SUPERCRITICAL THERMAL POWER PROJECT - SECTION A - SCOPE OF WORK","","Specification for RCC single flue chimney (Volume-II, Section-A) for the 1x800 MW supercritical thermal power project at Wanakwori, detailing the scope of construction work. Covers construction of a 275 m high reinforced concrete single flue steel lined chimney including foundations, shell, liner supporting platforms, steel liners, insulation, ash hoppers, external platforms, mini-shells, structural steel staircase, flue duct fabrication and fixing, and air aviation obstruction lighting plus lightning protection and grounding. Includes elevator supply, erection, testing, commissioning, required openings and load accommodation, turnkey supply-erection requirements, and preparation of bar bending schedule and fabrication drawings approval.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/1x800-mw-supercritical-thermal-power-project-section-a-scope-of-work/648350/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/1x800-mw-supercritical-thermal-power-project-section-a-scope-of-work/648350.png","ImageObject",300,407,{"name":92,"@type":93},"Blue Pony","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-27","2026-10-23",true,{"@type":102,"interactionType":103,"userInteractionCount":81},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What does the scope of work cover for the RCC single flue chimney?","Question",{"text":112,"@type":113},"It covers construction of a 275 m high reinforced concrete single flue steel lined chimney, including foundations, shell, liners, insulation, platforms, accessories, internal flue duct fabrication and fixing, obstruction lighting, lightning protection, grounding, doors, ladders, communication components, embedments, and painting per specification and approved drawings.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"Is the chimney elevator included in this volume section?",{"text":117,"@type":113},"Yes. Supply, erection, testing, and commissioning of the chimney elevator are included, along with civil and structural steel works needed for its erection and commissioning, and provision of required openings in the RCC shell and platforms.",{"name":119,"@type":110,"acceptedAnswer":120},"What pre-work documentation must the successful tenderer prepare?",{"text":121,"@type":113},"The tenderer must prepare a bar bending schedule and schedule of embedments for approval by the Engineer, and also prepare detailed fabrication drawings for doors, rolling shutters, flue ducts, structural steel liners and platforms, ladders, staircases, hand rails, and other fixtures for approval before fabrication or erection.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},648350,1792859373,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":81,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145},962090760266,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","1X800 MW SUPERCRITICAL THERMAL POWER PROJECT,  \nWANAKWORI  \nSPECIFICATION FOR  \nRCC SINGLE FLUE CHIMNEY  \nVOLUME-II  \nSPECIFICATION NO. PE-TS-J57-600-C002  \nBharat Heavy Electricals Limited  \nProject Engineering Management PPEI Building, Power Sector, Plot No. 25, Sector 16A,  \nNoida-201301  \n\n| |  | SPECIFICATION NO. PE-TS-J57-600-C002\u003Cbr>VOLUME -II SECTION - REV.NO. 0 DATE 24.09.2014\u003Cbr>SHEET 1 OF |\n| --- | --- | --- |\n| PROJECT TITLE : 1X800 MW SUPERCRITICAL\u003Cbr>THERMAL POWER PROJECT\u003Cbr>NO. OF UNITS : ONE UNIT\u003Cbr>RATING : 1x800 MW\u003Cbr>North-eastern side of Wanakbori\u003Cbr>LOCATION : Thermal Power Station, adjacent\u003Cbr>to river Mahi. |  |  |\n\n\n| |  |  SPECIFICATION NO. PE-TS-J57-600-C002  VOLUME -II |\n| --- | --- | --- |\n|  |  | SECTION - |\n|  |  | REV.NO. 0 DATE 24.09.2014\u003Cbr>SHEET 2 OF |\n| PREAMBLE\u003Cbr>This Tender document contains three (3) volumes. The bidder shall meet the requirement of all three volumes.\u003Cbr>VOLUME – II\u003Cbr>This volume is subdivided into following sections:\u003Cbr>Section-A: This section outlines the scope of enquiry.\u003Cbr>Section-B: This section provides “Project Information”.\u003Cbr>Section-C: This section indicates the technical requirements specific to the contract not covered in the section-D.\u003Cbr>Section-D: This section comprises of technical specification. |  |  |\n\n\n| |  |  SPECIFICATION NO. PE-TS-J57-600-C002  VOLUME -II |\n| --- | --- | --- |\n|  |  | SECTION - |\n|  |  | REV.NO. 0 DATE 24.09.2014\u003Cbr>SHEET 3 OF |\n| INDEX\u003Cbr>VOLUME-II\u003Cbr>SECTION DESCRIPTION SHEET NO.\u003Cbr>Section-A  SCOPE OF ENQUIRY\u003Cbr>Section-B  PROJECT INFORMATION\u003Cbr>Section-C SPECIFIC TECHNICAL\u003Cbr>REQUIREMENTS\u003Cbr>i)  CIVIL\u003Cbr>ii)  ELECTRICAL\u003Cbr>iii)  CHIMNEY ELEVATOR\u003Cbr>Section-D SPECIFICATION FOR CIVIL, STRUCTURAL\u003Cbr>ARCHITECTURAL, ELECTRICAL AND ELEVATOR WORKS\u003Cbr>􀁸  D-I Earthwork in excavation & backfill\u003Cbr>􀁸  D-II Cement Concrete (Plain & Reinforced)\u003Cbr>􀁸  D-III Fabrication of Structural Steel work\u003Cbr>􀁸  D-IV Erection of Structural Steel work\u003Cbr>􀁸  D-V Reinforced Concrete Chimney\u003Cbr>􀁸  D-7 Specification For rolling shutters\u003Cbr>􀁸  D-8 Specification For Miscellaneous metal\u003Cbr>􀁸  D-11 Specification For painting, whitewashing, polishing\u003Cbr>􀁸  D-12 Specification For Door window\u003Cbr>􀁸  D-21 Specification For pile Works\u003Cbr>􀁸  D-XIV Specification For Electrical Works \u003Cbr>􀁸  D-XV Specification For Elevator Work |  |  |\n\n\n| |  | SPECIFICATION NO. PE-TS-J57-600-C002\u003Cbr>VOLUME -II SECTION - REV.NO. 0 DATE 24.09.2014\u003Cbr>SHEET 4 OF |\n| --- | --- | --- |\n|  |  |  |\n\n\n| | TITLE:\u003Cbr>SCOPE OF WORK |  SPECIFICATION NO. PE-TS-J57-600-C002  VOLUME -II |\n| --- | --- | --- |\n|  |  | SECTION - A |\n|  |  | REV.NO. 0 DATE 24/09/2014\u003Cbr>SHEET 4 OF |\n| VOLUME – II\u003Cbr>SECTION-A\u003Cbr>SCOPE OF WORK\u003Cbr>SPECIFICATION NO. PE-TS-J57-600-C002 |  |  |\n\n\n| | TITLE:\u003Cbr>SCOPE OF WORK |  SPECIFICATION NO. PE-TS-J57-600-C002  VOLUME -II |\n| --- | --- | --- |\n|  |  | SECTION - A |\n|  |  | REV.NO. 0 DATE 24/09/2014\u003Cbr>SHEET 1 OF |\n| Scope of Work\u003Cbr>1.0.0  SCOPE\u003Cbr>1.1.1 The work to be done under this specification comprises of construction of 275M high Reinforced Concrete single flue steel lined Chimney complete with reinforced concrete raft/pile foundation, R.C shell, liner supporting platforms, steel liners, insulation and provision of other accessories including ash hoppers, external platforms, mini-shells, structural steel staircase, fabrication and fixing of flue duct inside the chimney, G.I. discrete strakes, complete interior and Air Aviation Obstruction lighting system, lightning protection and grounding system, M.S. doors for access to the shell, external platforms and inspection of the liners, M.S. ladders, communication system components, luminaries, embedments for installation of equipments and fixtures and painting both internal and external of the chimney shell as well as of all doors, stairs, laddersand other structural steel items in accordance with this specification and approved drawings.\u003Cbr>1.1.2 The supply, erection, testing and commissioning of chimney Elevator are in t","cbCaikxqFf8CMerc","https://ap.wps.com/l/cbCaikxqFf8CMerc","pdf",11970625,449,"English","# Scope of Work\n## 1.0.0 Scope\n## 1.1.1 Work under this specification\n## 1.1.2 Chimney elevator scope and provisions\n## 1.1.3 Turnkey construction scope\n## 1.1.4 Required schedules and drawings approval","[{\"question\":\"What does the scope of work cover for the RCC single flue chimney?\",\"answer\":\"It covers construction of a 275 m high reinforced concrete single flue steel lined chimney, including foundations, shell, liners, insulation, platforms, accessories, internal flue duct fabrication and fixing, obstruction lighting, lightning protection, grounding, doors, ladders, communication components, embedments, and painting per specification and approved drawings.\"},{\"question\":\"Is the chimney elevator included in this volume section?\",\"answer\":\"Yes. Supply, erection, testing, and commissioning of the chimney elevator are included, along with civil and structural steel works needed for its erection and commissioning, and provision of required openings in the RCC shell and platforms.\"},{\"question\":\"What pre-work documentation must the successful tenderer prepare?\",\"answer\":\"The tenderer must prepare a bar bending schedule and schedule of embedments for approval by the Engineer, and also prepare detailed fabrication drawings for doors, rolling shutters, flue ducts, structural steel liners and platforms, ladders, staircases, hand rails, and other fixtures for approval before fabrication or erection.\"}]","1X800 MW SUPERCRITICAL THERMAL POWER PROJECT - SECTION A - SCOPE OF WORK | PDF",1792793194,1131]