[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-665013-105":59,"doc-detail-665013-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","15-18m-pit-eurodeck-weighbridge-civil-details-version-c","15 & 18m Pit Eurodeck Weighbridge Civil Details - Version C","","This technical document provides essential civil engineering details for the installation of 15 and 18-meter Pit Eurodeck weighbridges. It specifies critical requirements for concrete pad foundation design, including dimensions and load-bearing capacity for steel weighbridges set at 13,000kg. The document emphasizes the necessity of a proper drainage system to prevent stagnant water beneath the platform, along with technical instructions for plate installation to avoid air pockets. It serves as a construction guide for engineers to adapt foundations based on specific site conditions, detailing load distribution on base plates and the scope of supply for components. These specifications ensure structural integrity and functional reliability for industrial weighing operations, providing a standardized approach to site preparation and assembly.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/15-18m-pit-eurodeck-weighbridge-civil-details-version-c/665013/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/15-18m-pit-eurodeck-weighbridge-civil-details-version-c/665013.png","ImageObject",300,407,{"name":92,"@type":93},"Rainbow Cat","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":102,"interactionType":103,"userInteractionCount":8},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What is the required load-bearing capacity for the foundation plates?","Question",{"text":112,"@type":113},"The concrete pad foundations are designed to receive a vertical load on the baseplates of 13,000kg for steel weighbridges.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"Why is a drainage system necessary under the weighbridge?",{"text":117,"@type":113},"A drainage system is essential to prevent water from accumulating and lying stagnant under the weighbridge, which could compromise the foundation and equipment integrity.",{"name":119,"@type":110,"acceptedAnswer":120},"Are the longitudinal edge pieces included in the supply?",{"text":121,"@type":113},"No, the longitudinal edge pieces are not included in the supply; however, plates 'A' are included.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},665013,1793285648,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":8,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":81},962090769181,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","|  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- |\n|  |  |  |  |  |  |\n|  |  |  |  |  |  |\n| C | 16x3 WEIGHBRIDGE ADDED TO TABLE | MSE | RC | RG | 18.02.03 |\n| B | ISSUED FOR CONSTRUCTION | DCL | NC | NC | 1.3.02 |\n| A | FIRST ISSUE | DCL | NC | NC | 8.1.02 |\n| REV. | MODI FICATIONS | DRAWN | CH KD . | APP D . | DATE |\n\n\n| NOTE ON PLATES\u003Cbr>\u003Cbr>NB: IT IS EXTREMELY IMPORTANT TO AVOID ANY AIR POCKETS BEING FORMED UNDER THE PLATES |\n| --- |\n| NOTE ON THE SUMP\u003Cbr>IT IS IMPORTANT TO BUILD A DRAINAGE SYSTEM WHICH\u003Cbr>PREVENTS WATER FROM ACCUMULATING AND LYING STAGNANT UNDER THE WEIGHBRIDGE.\u003Cbr>THE BASE SLAB OF THE TANK MUST BE ANGLEDAS REQUIRED TO DRAIN THE WATER INTO THE SUMP.\u003Cbr>SUMP TO BE CONNECTED TO THE CUSTOMER'S DRAINAGE SYSTEM. |\n| *FOUNDATION NOTES\u003Cbr>CONCRETE PAD FOUNDATIONS TO STRUCTURAL ENGINEERS DESIGN TO SUIT SITE CONDITIONS. FOUNDATIONS TO BE APPROX. 500MM THICK, 35 NEWTON CONCRETE DESIGNED TO RECEIVE A VERTICAL LOAD ON THE BASEPLATES 13,000KG FOR STEEL WEIGHBRIDGES.\u003Cbr>FINISH THE PILLARS WITH THE PLATES PERFECTLY LEVEL.\u003Cbr>FOUNDATION DETAILS CAN BE AMENDED TO SUIT GROUND CONDITIONS AND/OR CLIENTS |\n| REQUIREMENTS. SEE SEPARATE MANUFACTURERS DRAWING FOR DETAILS.\u003Cbr>THE LONGITUDINAL EDGE PIECES ARE NOT INCLUDED IN OUR SUPPLY.\u003Cbr>PLATES \"A\" ARE INCLUDED IN OUR SUPPLY. |\n| THE LOADS ON THE PLATES \"A\" ARE SPLIT AS FOLLOWS:\u003Cbr>PLATE \"A\" VERTICAL LOAD:\u003Cbr>\u003Cbr>STEEL WEIGHBRIDGE 13000 kg |\n| ALL DIMENSIONS IN mm |\n\n|  |  |  |  |  |\n| --- | --- | --- | --- | --- |\n| DRAWING OFFICE |  | DATE | CLIENT |  |\n| DRAWN BY | DCL | 8.1.02 |  |  |\n| CHECKED BY | NC | 8.1.02 | TITLE 15 & 18m PIT EURODECK\u003Cbr>WEIGHBRIDGE CIVIL DETAILS |  |\n| APPROVED BY | NC | 8.1.02 |  |  |\n| SCALE: | NTS |  |  |  |\n|  |  |  | DRG No\u003Cbr>EUR/P/1815 | REV C |\n| COPYRIGHT\u003Cbr>CONFIDENTIAL AND NOT TO BE COPIED OR\u003Cbr>SHOWN TO ANY THIRD PARTIES |  |  |  |  |\n|  |  |  |  |  |\n\n0. 0m  \n1 . 0m  \n2. 0m  \n3. 0m  \n4. 0m  \n5. 0m  \n1:100 @ A3","cbCaivFr9M8ONAaG","https://ap.wps.com/l/cbCaivFr9M8ONAaG","pdf",52016,"English","# Foundation Notes\n# Sump and Drainage Requirements\n# Installation Guidelines for Plates","[{\"question\":\"What is the required load-bearing capacity for the foundation plates?\",\"answer\":\"The concrete pad foundations are designed to receive a vertical load on the baseplates of 13,000kg for steel weighbridges.\"},{\"question\":\"Why is a drainage system necessary under the weighbridge?\",\"answer\":\"A drainage system is essential to prevent water from accumulating and lying stagnant under the weighbridge, which could compromise the foundation and equipment integrity.\"},{\"question\":\"Are the longitudinal edge pieces included in the supply?\",\"answer\":\"No, the longitudinal edge pieces are not included in the supply; however, plates 'A' are included.\"}]","15 & 18m Pit Eurodeck Weighbridge Civil Details - Version C | PDF"]