[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-663801-105":59,"doc-detail-663801-en":129},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":122,"head_meta":124,"extra_data":126,"updated_unix":128},105,"en","1380-mass-ave-construction-set-issued-for-construction-set-11302022","1380 Mass Ave Construction Set - Issued for Construction Set - 11/30/2022","","Construction set for an interior build-out at 1380 Massachusetts Avenue, Cambridge, MA 02138. The scope includes limited local demolition as needed for new work, interior partitions and doors, new finishes, new lighting, new furniture and millwork, and specialty equipment and connections. It also covers existing/modified fire protection, modified plumbing and floor penetrations, modified HVAC distribution, and modified electrical distribution. Client: Blank Street Coffee; issued for construction set on 11/30/2022, with a sheet index covering general, demolition, architecture, electrical, mechanical, and plumbing drawings.",{"@graph":69,"@context":121},[70,84,104],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/1380-mass-ave-construction-set-issued-for-construction-set-11302022/663801/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":98,"encodingFormat":97,"isAccessibleForFree":99,"interactionStatistic":100},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/1380-mass-ave-construction-set-issued-for-construction-set-11302022/663801.png","ImageObject",300,407,{"name":92,"@type":93},"gewufjwa","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-29",true,{"@type":101,"interactionType":102,"userInteractionCount":29},"InteractionCounter",{"@type":103},"ViewAction",{"@type":105,"mainEntity":106},"FAQPage",[107,113,117],{"name":108,"@type":109,"acceptedAnswer":110},"What project is covered by this construction set?","Question",{"text":111,"@type":112},"An interior build-out at 1380 Massachusetts Avenue, Cambridge, MA 02138 for the client Blank Street Coffee.","Answer",{"name":114,"@type":109,"acceptedAnswer":115},"What work scopes are included?",{"text":116,"@type":112},"Limited local demolition, new interior partitions and doors, new finishes and lighting, furniture/millwork, specialty equipment and connections, and modifications to fire protection, plumbing, HVAC, and electrical distribution.",{"name":118,"@type":109,"acceptedAnswer":119},"When is this set issued for construction?",{"text":120,"@type":112},"Issued for construction set with an issued date of 11/30/2022.","https://schema.org",{"og:url":83,"og:type":123,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":125,"canonical":83},"index,follow",{"doc_id":127,"site_id":62},663801,1793232131,{"code":4,"msg":5,"data":130},{"doc_id":127,"user_id":131,"nickname":92,"user_avatar":132,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":133,"file_id":134,"file_url":135,"file_type":136,"file_size":137,"view_count":29,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":138,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":128,"read_time":143},3985747882900,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","D t/1/2022 1 1: 15:20 A g :Fi n e : ers\\ _e l l is\\ Documents\\2022-06-06_Blank Street-1380 Mass Ave-Boston, MA_RVT2022_ke l l isC4VYD. rvt  \n\n| \u003Cbr>BLANK STREET\u003Cbr>1380 MASSACHUSETTS AVENUE, CAMBRIDGE, MA 02138\u003Cbr>\u003Cbr>ISSUED FOR: CONSTRUCTION SET, 11/30/2022\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>PROJECT LOCATION\u003Cbr>\u003Cbr>PROJECT LOCATION\u003Cbr>PROJECT DESCRIPTION:\u003Cbr>THIS PROJECT CONSISTS OF AN INTERIOR BUILD-OUT OF A LANDLORD PROVIDED SHELL AT 1380 MASSACHUSETTS AVENUE, CAMBRIDGE, MA 02138. THIS BUILD-OUT CONSISTS OF A BRAND NEW (LIST SPACES) .\u003Cbr>THE PROJECT CONSISTS OF THE FOLLOWING WORK:\u003Cbr>• LIMITED LOCAL DEMOLITION ONLY AS NEEDED FOR NEW CONSTRUCTION.\u003Cbr>• EXISTING TENANT SPACE (BUILDING ENVELOPE AND TENANT DEMISING WALLS)\u003Cbr>• EXISTING/ MODIFIED FIRE PROTECTION\u003Cbr>• NEW INTERIOR PARTITIONS AND DOORS\u003Cbr>• NEW FURNITURE/ MILLWORK\u003Cbr>• NEW FINISHES AS SCHEDULED\u003Cbr>• NEW LIGHTING AS SCHEDULED\u003Cbr>• NEW SPECIALITY EQUIPMENT & CONNECTIONS\u003Cbr>• MODIFIED PLUMBING AND FLOOR PENETRATIONS\u003Cbr>• MODIFIED HVAC DISTRIBUTION\u003Cbr>• MODIFIED ELECTRICAL DISTRIBUTION\u003Cbr>CLIENT\u003Cbr>BLANK STREET COFFEE\u003Cbr>225 WYTHE AVE BROOKLYN, NY 11249 CONTACT: JILL WAHL\u003Cbr>E-MAIL: [jillian@blankstreet.com](jillian@blankstreet.com)\u003Cbr>CONST. COORDINATOR\u003Cbr>BLANK STREET\u003Cbr>225 WYTHE AVENUE BROOKLYN, NY 11249 CONTACT: MATT DUELL\u003Cbr>[E-MAIL: matt@blankstreet.com](E-MAIL: matt@blankstreet.com)\u003Cbr>ARCHITECT\u003Cbr>PHASE ZERO DESIGN\u003Cbr>35 POND PARK, BAY 16\u003Cbr>HINGHAM, MA 02043\u003Cbr>T: 781-452-7121\u003Cbr>PROJECT MANAGER: ROBYN KIERNAN\u003Cbr>E-MAIL: [rkiernan@phasezerodesign.com](rkiernan@phasezerodesign.com)\u003Cbr>MEP ENGINEER\u003Cbr>JOHN SISK, PE\u003Cbr>6201 CAMPUS CIRCLE DRIVE EAST IRVING, TX 75063\u003Cbr>T: 972-870-1288\u003Cbr>CONTACT: BRIAN CHANDLER\u003Cbr>E-MAIL: [BChandler@idstudio4.com](BChandler@idstudio4.com)\u003Cbr>NORTH NORTH\u003Cbr>LOCUS PLAN KEY PLAN PROJECT DESCRIPTION PROJECT TEAM | SHEET INDEX |  |  |  | ARCHITECT:\u003Cbr>\u003Cbr>35 POND PARK ROAD, BAY 16 HINGHAM, MASSACHUSETTS 02043 PHONE: (781) 452-7121\u003Cbr>FAX: (781) 875-3039\u003Cbr>[www.phasezerodesign.com](www.phasezerodesign.com) |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- |\n|  |  |  |  |  | CLIENT:\u003Cbr>\u003Cbr>225 WYTHE AVENUE BROOKLYN, NY 11249 [www.blankstreet.com](www.blankstreet.com) |  |  |  |\n|  | SHEET NO. | SHEET NAME | CURRENT\u003Cbr>REVISION | REVISION\u003Cbr>DATE |  |  |  |  |\n|  | GENERAL |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |\n|  | G000 | COVER SHEET | CONSTRUCTION SET | 11/30/22 | CONSULTANT:\u003Cbr>JOHN SISK, PE 6201 CAMPUS CIRCLE DRIVE EAST IRVING, TX 75063 PHONE: (972) 870-1288 |  |  |  |\n|  | G001 | ADA STANDARDS, SYMBOLS & ABBREVIATIONS | CONSTRUCTION SET | 11/30/22 |  |  |  |  |\n|  | G002 | GENERAL NOTES | CONSTRUCTION SET | 11/30/22 |  |  |  |  |\n|  | G003 | GENERAL NOTES | CONSTRUCTION SET | 11/30/22 |  |  |  |  |\n|  | G005 | SPECIFICATIONS | CONSTRUCTION SET | 11/30/22 | BLANK STREET\u003Cbr>1380 MASSACHUSETTS AVENUE, CAMBR IDGE, MA 02138\u003Cbr>PROJECT: |  |  |  |\n|  | G006 | SPECIFICATIONS | CONSTRUCTION SET | 11/30/22 |  |  |  |  |\n|  | G010 | LIFE SAFETY PLAN | CONSTRUCTION SET | 11/30/22 |  |  |  |  |\n|  | DEMOLITION |  |  |  |  |  |  |  |\n|  | AD101 | DEMOLITION PLAN | CONSTRUCTION SET | 11/30/22 |  |  |  |  |\n|  | AD111 | DEMOLITION REFLECTED CEILING PLAN | CONSTRUCTION SET | 11/30/22 |  |  |  |  |\n|  | ARCHITECTURE |  |  |  |  |  |  |  |\n|  | A101 | CONSTRUCTION PLAN | CONSTRUCTION SET | 11/30/22 |  |  |  |  |\n|  | A102 | FOOD SERVICE PLAN | CONSTRUCTION SET | 11/30/22 |  |  |  |  |\n|  | A111 | REFLECTED CEILING PLAN | CONSTRUCTION SET | 11/30/22 |  |  |  |  |\n|  | A131 | FINISH PLAN | CONSTRUCTION SET | 11/30/22 |  |  |  |  |\n|  | A401 | RESTROOM PLAN AND ELEVATIONS | CONSTRUCTION SET | 11/30/22 |  |  |  |  |\n|  | A501 | INTERIOR DETAILS | CONSTRUCTION SET | 11/30/22 |  |  |  |  |\n|  | A601 | PARTITION TYPES, DOORS & WINDOWS | CONSTRUCTION SET | 11/30/22 |  |  |  |  |\n|  | A701 | INTERIOR ELEVATIONS | CONSTRUCTION SET | 11/30/22 |  |  |  |  |\n|  | A801 | MILLWORK DETAILS | CONSTRUCTION SET | 11/30/22 |  |  |  |  |\n|  | A901 | RENDERINGS ","cbCairMyzSo4Ir6R","https://ap.wps.com/l/cbCairMyzSo4Ir6R","pdf",11947277,29,"English","# Sheet Index\n## General\n## Demolition\n## Architecture\n## Mechanical\n## Electrical\n## Plumbing\n## Revisions","[{\"question\":\"What project is covered by this construction set?\",\"answer\":\"An interior build-out at 1380 Massachusetts Avenue, Cambridge, MA 02138 for the client Blank Street Coffee.\"},{\"question\":\"What work scopes are included?\",\"answer\":\"Limited local demolition, new interior partitions and doors, new finishes and lighting, furniture/millwork, specialty equipment and connections, and modifications to fire protection, plumbing, HVAC, and electrical distribution.\"},{\"question\":\"When is this set issued for construction?\",\"answer\":\"Issued for construction set with an issued date of 11/30/2022.\"}]","1380 Mass Ave Construction Set - Issued for Construction Set - 11/30/2022 | PDF",73]