[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-649874-105":3,"detail-sidebar-cat-0-en-105":79,"doc-detail-649874-en":129},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":72,"head_meta":74,"extra_data":76,"updated_unix":78},105,"en","11-chestnut-street-drawings-construction-notes-and-demolition-notes","11 Chestnut Street Drawings - Construction Notes and Demolition Notes","","Drawing reference details include Construction Notes and Demolition Notes for a project at 11 Chestnut Street. The document specifies contractor responsibilities for permits, taxes, site verification, and coordination across trades, including concealed blocking, anchoring, utility routing, and compliance with codes and accessibility requirements. It emphasizes that drawings are diagrammatic and not to scale, prohibits deviations without architect permission, and outlines demolition removal, dust protection, temporary safety measures, and handling of salvage and disposed materials.",{"@graph":14,"@context":71},[15,34,54],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/11-chestnut-street-drawings-construction-notes-and-demolition-notes/649874/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":48,"encodingFormat":47,"isAccessibleForFree":49,"interactionStatistic":50},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/11-chestnut-street-drawings-construction-notes-and-demolition-notes/649874.png","ImageObject",300,407,{"name":42,"@type":43},"Malam Tenang","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-24",true,{"@type":51,"interactionType":52,"userInteractionCount":22},"InteractionCounter",{"@type":53},"ViewAction",{"@type":55,"mainEntity":56},"FAQPage",[57,63,67],{"name":58,"@type":59,"acceptedAnswer":60},"What does the Construction Notes section require the contractor to include and manage?","Question",{"text":61,"@type":62},"It requires the contractor to provide all labor, materials, devices, supplies, and equipment needed to execute and complete the work, including obtaining permits and paying applicable taxes.","Answer",{"name":64,"@type":59,"acceptedAnswer":65},"Are the drawings scalable and how should discrepancies be handled?",{"text":66,"@type":62},"The drawings are diagrammatic and must not be scaled. If a lack of information or discrepancy appears, the general contractor must request written interpretation from the architect before proceeding.",{"name":68,"@type":59,"acceptedAnswer":69},"What safety and removal requirements apply in the Demolition Notes section?",{"text":70,"@type":62},"The contractor must provide temporary protection to ensure safety and install dust coverings to prevent dust spread beyond the demolition area, then remove specified existing elements and properly dispose of demolition debris.","https://schema.org",{"og:url":32,"og:type":73,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":75,"canonical":32},"index,follow",{"doc_id":77,"site_id":7},649874,1792880814,{"code":4,"msg":80,"data":81},"success",[82,86,90,94,99,104,109,113,118,121,125],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":83,"show_sort_weight":84,"slug":85},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":87,"show_sort_weight":88,"slug":89},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":91,"show_sort_weight":92,"slug":93},"Exam",70,"exam",{"id":95,"doc_module":4,"doc_module_name":25,"category_name":96,"show_sort_weight":97,"slug":98},5,"Comic",60,"comic",{"id":100,"doc_module":4,"doc_module_name":25,"category_name":101,"show_sort_weight":102,"slug":103},6,"Technology",50,"technology",{"id":105,"doc_module":4,"doc_module_name":25,"category_name":106,"show_sort_weight":107,"slug":108},7,"Healthcare",40,"healthcare",{"id":110,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":111,"slug":112},8,30,"research-report",{"id":114,"doc_module":4,"doc_module_name":25,"category_name":115,"show_sort_weight":116,"slug":117},9,"Religion & Spirituality",20,"religion-spirituality",{"id":116,"doc_module":4,"doc_module_name":25,"category_name":119,"show_sort_weight":116,"slug":120},"World Cup","world-cup",{"id":122,"doc_module":4,"doc_module_name":25,"category_name":123,"show_sort_weight":122,"slug":124},10,"Lifestyle","lifestyle",{"id":126,"doc_module":4,"doc_module_name":25,"category_name":127,"show_sort_weight":95,"slug":128},19,"General","general",{"code":4,"msg":80,"data":130},{"doc_id":77,"user_id":131,"nickname":42,"user_avatar":132,"doc_module":4,"category_id":110,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":133,"file_id":134,"file_url":135,"file_type":136,"file_size":137,"view_count":22,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":138,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":143,"read_time":144},962093532863,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","DRAWING REFERENCE  \nDETAIL KEY  \nSIM 1  \nA101  \nWALL TYPE 1i  \n\n|  |  |  |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| CONSTRUCTION NOTES\u003Cbr>1. THE SCOPE OF WORK FOR THE PROJECT SHALL INCLUDE ALL LABOR, MATERIALS, DEVICES, SUPPLIES, EQUIPMENT, AND OTHER FACILITIES NECESSARY FOR AND INCIDENTAL TO THE EXECUTION AND COMPLETION OF WORK DESCRIBED IN THESE DOCUMENTS.\u003Cbr>2. THE CONTRACTOR SHALL SECURE AND PAY FOR THE BUILDING PERMIT AND OTHER PERMITS AND GOVERNMENT FEES, LICENSES AND INSPECTIONS NECESSARY FOR PROPER EXECUTION AND COMPLETION OF WORK.\u003Cbr>3. THE CONTRACTOR SHALL PAY ALL FEDERAL, STATE, LOCAL AND ALL OTHER TAXES THAT ARE APPLICABLE TO THIS CONTRACT.\u003Cbr>4. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO BECOME GENERALLY FAMILIAR WITH THE JOB SITE AND EXISTING CONDITIONS PRIOR TO PROCEEDING WITH WORK. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS AT THE SITE AND REPORT ANY DISCREPANCIESTO THE ARCHITECT BEFORE PROCEEDING WITH THE WORK.\u003Cbr>5. THESE DRAWINGS ARE DIAGRAMMATIC AND SHALL NOT BE SCALED. WHERE LACK OF INFORMATION, OR ANY DISCREPANCY SHOULD APPEAR IN THE DRAWINGS OR SPECIFICATIONS, THE G.C. SHALL REQUEST WRITTEN INTERPRETATION FROM THE ARCHITECT BEFORE PROCEEDING WITH THAT PORTION OF THE WORK.\u003Cbr>6. NO CHANGES, MODIFICATIONS OR DEVIATIONS SHALL BE MADE FROM THE DRAWINGS OR SPECIFICATIONS WITHOUT FIRST SECURING WRITTEN PERMISSION FROM THE ARCHITECT.\u003Cbr>7. ITEMS LABELED NIC ARE \"NOT IN CONTRACT\". THE G.C. , HOWEVER, IS RESPONSIBLE FOR ALL R. O. , NECESSARY BLOCKING AND COORDINATION OF WORK.\u003Cbr>8. WHERE A SYSTEM OR ASSEMBLY IS CALLED FOR, ALL NECESSARY PARTS AND MATERIALS REQUIRED FORA COMPLETE INSTALLATION/SYSTEM SHALL BE PROVIDED AND INSTALLED ACCORDING TO THE MANUFACTURERS INSTRUCTIONS.\u003Cbr>9. ALL SYSTEMS & MATERIALS SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURERS RECOMMENDATIONS, INSTRUCTIONS AND SPECIFICATIONS.\u003Cbr>10. PROVIDE ADEQUATE CONCEALED BLOCKING AND ANCHORING FOR ALL CEILING AND WALL MOUNTED EQUIPMENT, HARDWARE AND ACCESSORIES. COORDINATE WITH ALL TRADES THE LOCATIONS OF SLEEVES, BLOCKING OR OTHER PRESET ACCESSORIES INVOLVING OTHER TRADES.\u003Cbr>11. CONTRACTOR TO COORDINATE AND SCHEDULE WORK OF ALL TRADES SO AS TO NOT DELAY AT ANY PHASE OF COMPLETION, CONSTRUCTION DUE TO INTERCONNECTING WORK OR LATE SCHEDULING. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO ENSURE THAT ALL SUB-TRADES ARE FAMILIAR WITH THE COMPLETE CONSTRUCTION DOCUMENTS PACKAGE INCLUDING WORK THAT MAY OR MAY NOT BE PART OF THEIR SCOPE.\u003Cbr>12. ALL WORK SHALL BE PERFORMED WITH THE BEST ACCEPTED PRACTICES OF THE RESPECTED TRADES.\u003Cbr>13. ALL MATERIALS TO BE NEW (UNLESS OTHERWISE NOTED ON DRAWINGS), FIRST CLASS, IN EVERY RESPECT, AND SHALL CONFORM TO CONTRACT DOCUMENTS.\u003Cbr>14. CONTRACTOR TO COORDINATE CUTTING & PATCHING OF ALL TRADES. MATCH EXISTING MATERIALS AS REQUIRED.\u003Cbr>15. CONTRACTOR TO COORDINATE KEYING SYSTEMS AND ALL HARDWARE FUNCTIONS WITH OWNER.\u003Cbr>16. CONTRACTOR TO COORDINATE THE INSTALLATION OF ALL ELECTRICAL, ALARM, SECURITY, DATA AND TELEPHONE LINES. CONCEAL ALL NEW UTILITIES IN FINISHED AREAS AS REQUIRED. TELEPHONES TO BE FURNISHED AND INSTALLED BY OWNER.\u003Cbr>17. LIFE SAFETY SYSTEMS SHALL BE INSTALLED AS REQUIRED, PER N. F. P. A. , AND LOCAL REGULATIONS.\u003Cbr>18. CONTRACTOR TO COORDINATE ALL DELIVERY SCHEDULES AND LOCATIONS FOR ALL OWNER FURNISHED ITEMS WITH EACH SUPPLIER. VERIFY SUCH OWNER FURNISHED ITEMS WITH OWNERS REPRESENTATIVE, G.C. TO PROVIDE SOLID WOOD BLOCKING AS REQUIRED.\u003Cbr>19. CONTRACTOR SHALL REMOVE ALL TEMPORARY ITEMS, TRASH, TOOLS, AND EXCESS MATERIALS AT THE COMPLETION OF WORK AND LEAVE THE ENTIRE PROJECT SITE IN A NEAT, CLEAN, ACCEPTABLE CONDITION.\u003Cbr>20. PRIOR TO TURNING THE COMPLETED PROJECT OVER TO THE OWNER, THE CONTRACTOR SHALL REMOVE ALL GREASE, DUST, DIRT, STAINS, LABELS, FINGERPRINTS AND OTHER FOREIGN MATERIALS FROM SIGHT, AND SWEEP, WET-MOP AND VACUUM ALL FLOORS.\u003Cbr>21. THE CONTRACTOR SHALL PROVIDE TEMPORARY ELECTRICAL ","cbCaimX8cHwXrHhL","https://ap.wps.com/l/cbCaimX8cHwXrHhL","pdf",5794625,13,"English","# Construction Notes\n## Demolition Notes","[{\"question\":\"What does the Construction Notes section require the contractor to include and manage?\",\"answer\":\"It requires the contractor to provide all labor, materials, devices, supplies, and equipment needed to execute and complete the work, including obtaining permits and paying applicable taxes.\"},{\"question\":\"Are the drawings scalable and how should discrepancies be handled?\",\"answer\":\"The drawings are diagrammatic and must not be scaled. If a lack of information or discrepancy appears, the general contractor must request written interpretation from the architect before proceeding.\"},{\"question\":\"What safety and removal requirements apply in the Demolition Notes section?\",\"answer\":\"The contractor must provide temporary protection to ensure safety and install dust coverings to prevent dust spread beyond the demolition area, then remove specified existing elements and properly dispose of demolition debris.\"}]","11 Chestnut Street Drawings - Construction Notes and Demolition Notes | PDF",1792809849,33]