[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-649851-105":59,"doc-detail-649851-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","10f-3-fabric-awning-division-10-section-10f","10F-3 FABRIC AWNING - Division 10 - Section 10F","","Division 10, Section 10F provides contract requirements for furnishing and installing a factory-formed fabric awning system. It defines the scope of work, specifies materials including metal tubing frames and UV/mildew/water-resistant woven vinyl-coated polyester mesh, and requires proper anchorage coordinated with the manufacturer. Installation must be plumb, level, and true to line with a wrinkle-free fabric and watertight seam work. The section includes examination, quality assurance qualifications, pre-installation conference, cleaning and protection, submittal requirements (product data, shop drawings, samples, test documentation, warranties), and one-year guarantees tied to issuance of the Final Certificate of Occupancy.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/10f-3-fabric-awning-division-10-section-10f/649851/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/10f-3-fabric-awning-division-10-section-10f/649851.png","ImageObject",300,407,{"name":92,"@type":93},"dbqoiu","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-24",true,{"@type":102,"interactionType":103,"userInteractionCount":81},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What is the scope of work for Section 10F fabric awning?","Question",{"text":112,"@type":113},"Furnish and install a factory-formed awning system, including necessary accessories and fasteners, and coordinate with related work specified elsewhere. The awning must meet design/drawing performance criteria and include proper anchorage methods.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"Which materials are required for the fabric awning system?",{"text":117,"@type":113},"All awning frames must be factory formed and include an integral metal tubing frame design. The fabric must be woven vinyl-coated polyester mesh resistant to ultraviolet light, mildew, and water, using a specified mesh count and shade factor, with color approved by the Architect/Engineer.",{"name":119,"@type":110,"acceptedAnswer":120},"What submittals and approvals are required before installation?",{"text":121,"@type":113},"Submit product data, shop drawings showing fabric and anchoring details, and actual awning samples with material and color. Awning installation must not start until shop drawings are approved by the Architect/Engineer, and quality control documentation (including tests and warranty information) must be provided.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},649851,1792809326,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":81,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":81,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":39},3985747862462,"https://ap-avatar.wpscdn.com/davatar_3d24733baf745e90a7e4bdd5f77d97b2","DIVISION 10  \nSECTION 10F FABRIC AWNING  \n10F.01 GENERAL: Comply with all ofthe Contract Documents.  \n10F.02 SCOPE OF WORK:  \nA. Refer to \"Division Scope of Work\"  \nB. Furnish and install factory formed awning system. Provide all necessary accessories and fasteners. Awning shall meet performance criteria as required in the design and/or on the drawings.  \nC. To include and/or coordinate with related work specified elsewhere.  \n10F.03 MATERIALS  \nA. Awnings:  \n1. All awning frames shall be factory formed .  \n2. Awning to have the integral design with metal tubing frame.  \n3. Fabric to be woven vinyl-coated polyester mesh, resistant to ultraviolet light, mildew and water. \\# 90-36x18 count mesh with 90% shade factor. Color to be approved by Architect/Engineer.  \nB. Anchorage:  \n1. Coordinate with manufacturer for proper anchoring methods to insure compliance with specifications.  \n10F.04 INSTALLATION AND WORKMANSHIP  \n-Examination;  \nA. Installer shall examine wall condition on which awning system and accessories are to be applied.  \n1. If surfaces are not suitable for application of awning system, installer shall notify the Architect/Engineer of such in writing.  \n2. Installer must field verify all necessary dimensions prior to fabrication of materials.  \n-Installation;  \nA. Installer to comply with manufacturer's installation instructions and shop drawings.  \nB. Entire system shall be installed plumb, level and true to line, fabric shall be free of wrinkles and distortions.  \nC. Workmanship must conform to standards established within the industry.  \nD. Seams to achieve a watertight system.  \nE. Care should be taken during handling of awnings to prevent bending, twisting, abrasion, scratching, etc.  \n-Quality Assurance;  \nA. Manufacturer's Qualifications:  \n1. Manufacturer shall have a minimum often years experience in the factory fabrication ofawning systems.  \nB. Applicator's Qualifications:  \n1. Applicator shall have at least two (2) years experience applying this typeofawning with successful completion of projects of similar scope.  \nC. Regulatory Requirement:  \n1. All local building code requirements are to be followed for both design and installation ofawning system.  \nD. Pre-installation Conference  \nA meeting between awning installer, general contractor, and Architect/Engineershall be held prior to actual installation of material to review the following: acceptable materials, colors, tubes, changes in scope of work, etc.  \nField measurements should be taken for verification of dimensional correctness in relationship to original drawings, prior to providing manufacturer with a bill of material.  \n-Cleaning  \nA. Installer is to leave work areas clean, free from grease, finger marks and stains.  \nSTANDARD SPECIFICATION  \nJANUARY 2010  \nB. Remove scrap and debris from surrounding areas and grounds.  \n-Protection  \nA. Protect work area as required and protect from damage by other trades.  \nB. Safety clothing, equipment and precaution must be utilized according to safety standards.  \n10F.05 SUBMITTALS  \nA. Product Data:  \n1. Submit manufacturer's current specifications and installation instructions.  \nB. Shop Drawing:  \n1. Submit shop drawings showing details of fabric, tubing frame, trim, fastening and anchoring methods. Awning installation shall not start until shop drawings are approved by Architect/Engineer.  \nC. Samples:  \n1. Submit actual awning sample along with material and color.  \nD. Quality Control Submittals:  \n1. Submit actual test documentation including wind pressure, flame retardant and corrosion resistance tests.  \n2. Submit material and fabric warranty.  \n10F.06 GUARANTEES  \nA. Guarantee all items of work furnished and installed under this Section for (1) one year, in addition to manufacturer’s standard warranties. All guarantees to be from the date, when Final Certificate of Occupancy is issued from Department of Buildings.  \nEND OF SECTION  \n10F-3 FABRIC AWNING","cbCaif9r1053PYaq","https://ap.wps.com/l/cbCaif9r1053PYaq","pdf",17537,"English","# 10F.01 General\n# 10F.02 Scope of Work\n# 10F.03 Materials\n# 10F.04 Installation and Workmanship\n## Examination\n## Installation\n## Quality Assurance\n## Cleaning\n## Protection\n# 10F.05 Submittals\n# 10F.06 Guarantees","[{\"question\":\"What is the scope of work for Section 10F fabric awning?\",\"answer\":\"Furnish and install a factory-formed awning system, including necessary accessories and fasteners, and coordinate with related work specified elsewhere. The awning must meet design/drawing performance criteria and include proper anchorage methods.\"},{\"question\":\"Which materials are required for the fabric awning system?\",\"answer\":\"All awning frames must be factory formed and include an integral metal tubing frame design. The fabric must be woven vinyl-coated polyester mesh resistant to ultraviolet light, mildew, and water, using a specified mesh count and shade factor, with color approved by the Architect/Engineer.\"},{\"question\":\"What submittals and approvals are required before installation?\",\"answer\":\"Submit product data, shop drawings showing fabric and anchoring details, and actual awning samples with material and color. Awning installation must not start until shop drawings are approved by the Architect/Engineer, and quality control documentation (including tests and warranty information) must be provided.\"}]","10F-3 FABRIC AWNING - Division 10 - Section 10F | PDF"]