[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-399543-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-399543-en":131},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","02_wsf-xe3734_8203-646-090-01","02_WSF-XE3734_8203-646-090-01","","Engineering revision notes and symbol list for a ship electrical system, documenting changes during a 2005 ship alteration that replaces the ship service switchboard, s/s units, and vital generators with three ship service generators and a corresponding switchboard. Specifies relocation of distribution loads and removal of a vital distribution bus, along with compliance requirements (46 CFR Subchapter J) and detailed circuit, labeling, and protective device practices. Includes constraints on breaker placement and fuse requirements for trip coils, plus instructions for cable pulling, rerouting, renaming EP24 to EP24A, and battery disconnect/charger locations.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/02_wsf-xe3734_8203-646-090-01/399543/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/02_wsf-xe3734_8203-646-090-01/399543.png","ImageObject",300,407,{"name":42,"@type":43},"jayni","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-11-28","2026-09-27",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",11,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What is the purpose of the drawing described in the notes?","Question",{"text":63,"@type":64},"The drawing reflects changes made to the ship’s electrical system during a 2005 ship alteration, including replacement of switchboards and generators and relocation of vital distribution loads.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What regulatory requirement governs material and workmanship?",{"text":68,"@type":64},"All material and workmanship must follow the requirements of 46 CFR, Subchapter J.",{"name":70,"@type":61,"acceptedAnswer":71},"How are new cables and cable tags specified?",{"text":72,"@type":64},"New cables must use MIL-C-24643 or IEEE 45 marine type cable, and new cables are labeled with aluminum embossed cable tags as depicted, including at enclosure entrances and both sides of deck or bulkhead penetrations.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},399543,1790992183,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,106,111,115,120,123,127],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":102,"doc_module":4,"doc_module_name":25,"category_name":103,"show_sort_weight":104,"slug":105},6,"Technology",50,"technology",{"id":107,"doc_module":4,"doc_module_name":25,"category_name":108,"show_sort_weight":109,"slug":110},7,"Healthcare",40,"healthcare",{"id":112,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":113,"slug":114},8,30,"research-report",{"id":116,"doc_module":4,"doc_module_name":25,"category_name":117,"show_sort_weight":118,"slug":119},9,"Religion & Spirituality",20,"religion-spirituality",{"id":118,"doc_module":4,"doc_module_name":25,"category_name":121,"show_sort_weight":118,"slug":122},"World Cup","world-cup",{"id":124,"doc_module":4,"doc_module_name":25,"category_name":125,"show_sort_weight":124,"slug":126},10,"Lifestyle","lifestyle",{"id":128,"doc_module":4,"doc_module_name":25,"category_name":129,"show_sort_weight":97,"slug":130},19,"General","general",{"code":4,"msg":82,"data":132},{"doc_id":79,"user_id":133,"nickname":42,"user_avatar":134,"doc_module":4,"category_id":112,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":140,"language":141,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":142,"faqs":143,"seo_title":144,"seo_description":12,"update_tm":145,"read_time":146,"preview_page_count":33,"preview_urls":147},3985747859343,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","| 4   |  |  |  | 3   |  |  |  |  |  |  |  | 2   | 1   |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| REVISIONS   |  |  |  | SYMBOL LIST   |  |  |  |  |  |  |  | GENERAL NOTES(CONTINUED FROM ZONE 1-C)   | GENERAL NOTES   | D   |\n| ZONE  \u003Cbr>REV   |  | DESCRIPTION   | PROFESSIONAL ENGINEER  \u003Cbr>STAMP PER:   | NO.   | SYMBOL   |  | DESCRIPTION   | NO.   | SYMBOL   | DESCRIPTION   |  | 11.NO.2 STEERING GEAR WAS ORIGINALY FED FROM THE VTAL BUS WHICH WAS REMOVED(CKT P13).TIS  \u003Cbr>NOW FED FROM THE E.BUS EP411.EXISTNG LOCAL CABLE TAGS WL BE REMOVED AND BE RETACGED.  \u003Cbr>12.THE PRIMARY PROPULSION EXCITATION FEEDER CKT P38 IS TO_BE RELOCATED FROM THE VITAL SERYICE4  \u003Cbr>BUS TO THE SHIP_SERVICE BUS.ALL EXISTING“P38”CABLE TAGS SHALL REMAIN.THE PRIMARY AND  \u003Cbr>ALTERNATE CIRCUIT BREAKERS SHALL BE MECHANICALLY INTERLOCKED.  \u003Cbr>13.THE EMERCENCY SWITCHBOARD BUS DESIGN PRECLUDES ANY BREAKER LARCER THAN 100A TO BE LOCATED  \u003Cbr>ON THE RICHT SIDE OF THE BUS.CIRCUIT BREAKERS LARGER THAN 100A MUST BE LOCATED ON THE LEFT  \u003Cbr>SIDE OF THE BUS.  \u003Cbr>14.CIRCUITS REFERRING THIS NOTE SHALL BE RETAGGED TO REFLECT THE NEW CIRCUIT DESIGNATION.  \u003Cbr>15.THE EXISTING HOLD 24VDC DISTRIBUTION SYSTEM \"EP24\"IS TO BE RENAMED \"EP24A\".ALL EXISTING  \u003Cbr>EQUIPMENT AND CABLES SHALL BE RELABELED.THE POWER SUPPLY,DISTRIBUTION LOAD AND UNE  \u003Cbr>SIDE OF DISCONNECT SWITCH SHALL BE CONNECTED AS SHOWN.THE DISCONNECT SWITCH SHALL  \u003Cbr>DISCONNECT ONLY THE BATTERY.  \u003Cbr>16.REMOVE EXISTING CIRCUIT BREAKER\"EP401\",AND RETURN IT TO THE STATE'S REPRESENTATVE.INSTALL A  \u003Cbr>NEW CIRCUIT BREAKER IN SAME LOCATION.CONNECT EP401 UNDERVOLTAGE TRIP TO E.GENS CONTROL  \u003Cbr>XFMR AS SHOWN ON(REF 7)THIS ALLOWS EP401 TO ONLY BE MANUALLY CLOSED AFTER THE  \u003Cbr>EMERGENCY GENERATOR IS PRODUCING POWER.THE EXISTING CABLE EP401 WLL BE USED AS A  \u003Cbr>BACKFEED TO s/S SWBD,AND SHALL BE RE-CONNECTED TO NEW EP401 CKT BKR.  \u003Cbr>17.EACH U.Y.TRIP COIL SHALL BE FUSED INDEPENDENTLY OF OTHER COILS ON THE SAME CIRCUIT.  \u003Cbr>18.ALL CURRENT CARRYING COMPONENTS OF NEW POWER PANELS AND CIRCUIT BREAKERS SHALL BE  \u003Cbr>CONSTRUCTED OF COPPER AND BE PLATED TO PREVENT CORROSION.  \u003Cbr>19.MAINTENANCE BACKFEED CIRCUIT BREAKER IN THE S/s SWITCHBOARD SHALL BE FITTED WITH A \"KIRK KEY\"  \u003Cbr>TYPE LOCKING DEVCE.  \u003Cbr>20.NOT USED.  \u003Cbr>21.NOT USED.  \u003Cbr>22.STEERING GEAR CIRCUIT BREAKERS SHALL BE PROMDED WITHOUT DELAYS AND WITH INSTANTANEOUS TRIP  \u003Cbr>ELEMENTS SET BETWEEN 175%AND 200%OF LOCKED ROTOR CURRENT AS PRESCRIBED BY 46 CFR  \u003Cbr>58.25-55.  \u003Cbr>23.THE SHIPYARD IS TO PULL OFE FIBER OPTIC CABLE FROM THEMCC NO.1 SECTION OF THE SWTCHBOARD IN  \u003Cbr>A RING CONFIGURATION TO MCC'S NO.2 THRU 5 FOR FUTURE TERMNATION TO ET200M'sTHE CABLE SHALL  \u003Cbr>BE END SEALED.  \u003Cbr>24.THE SHIPYARD IS TO REMOVE/RELOCATE PANEL LP2IN WAY OF ELEVATOR TRUNK INSTALLATION.IF  \u003Cbr>NECESSARY,CABLE MAY BE EXTENDED WITH ABS APPROVED SPLICE KITS.  \u003Cbr>25.EP24A BATTERY DISCONNECT AND CHARCER TO BE LOCATED WITH EP24A BATTERIES IN DUMBWAITER  \u003Cbr>VESTIBULE.EP24B BATTERY DISCONNECT AND CHARGER TO BE LOCATED IN POWER DISTRIBUTON ROOM.  \u003Cbr>12   | 1.THE PURPOSE OF_THIS DRAWING IS TO REFLECT THE CHANCES MADE TO_THE_SHIP'S ELECTRICAL SYSTEM  \u003Cbr>DURING SHIP ALTERATION 2005,IN WHICH THE SHIPSERVICE SWITCHBOARD,THE TWO s/S AND VITAL  \u003Cbr>GENERATORS ARE TO BE REPLACED WITH THREE SHIP SERVICE GENERATORS AND CORRESPONDING SHIP  \u003Cbr>SERVICE SWITCHBOARD.EXISTING VTAL DISTRIBUTION LOADS HAVE BEEN RELOCATED TO APPROPRIATE  \u003Cbr>DISTRIBUTIONS N LAW.CFR 46,AND THERE WILL NO LONGER BE A VITAL DISTRIBUTION BUS.  \u003Cbr>2.THIS DRAWING HAS BEEN DEVELOPED FROM,AND WILL SUPERCEDE,REFERENCE NO.5.THE SHIPYARD SHALL  \u003Cbr>BE RESPONSIBLE FOR DEVELOPING AND DELVERING AN ACCURATE DISPLAY ONE LINE”UPON REDELIVERY  \u003Cbr>OF THE VESSEL  \u003Cbr>3.ALL MATERIAL AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF 46 CFR,  \u003Cbr>SUBCHAPTER J.  \u003Cbr>4.ALL NEW CABLES SHALL BE MIL-C-24643 OR IEEE 45 MARINE TYPE CABLE.NYLON OR BRASS STUFFING  \u003Cbr>TUBES SHALL B","cbCaijDKfH9QCRaM","https://ap.wps.com/l/cbCaijDKfH9QCRaM","pdf",2239996,13,"English","# General Notes\n## Purpose and scope of the drawing\n## Regulatory and cable requirements\n## Equipment relocation and retagging","[{\"question\":\"What is the purpose of the drawing described in the notes?\",\"answer\":\"The drawing reflects changes made to the ship’s electrical system during a 2005 ship alteration, including replacement of switchboards and generators and relocation of vital distribution loads.\"},{\"question\":\"What regulatory requirement governs material and workmanship?\",\"answer\":\"All material and workmanship must follow the requirements of 46 CFR, Subchapter J.\"},{\"question\":\"How are new cables and cable tags specified?\",\"answer\":\"New cables must use MIL-C-24643 or IEEE 45 marine type cable, and new cables are labeled with aluminum embossed cable tags as depicted, including at enclosure entrances and both sides of deck or bulkhead penetrations.\"}]","02_WSF-XE3734_8203-646-090-01 | PDF",1790497630,33,[148,152,155,159],{"page_no":22,"url":149,"width":150,"height":151},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/b28f060ef2863ccb2d0cc35e048fb1d4.webp",983,635,{"page_no":26,"url":153,"width":154,"height":151},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/5fda1e591267004b3c408cdbf533cb21.webp",982,{"page_no":30,"url":156,"width":157,"height":158},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/64f637c3294a3cba2a2858379ca711c1.webp",981,634,{"page_no":33,"url":160,"width":161,"height":162},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/3549c5247550ef54df6302f4a0c34849.webp",980,633]